{"id":178589,"date":"2023-08-24T17:07:41","date_gmt":"2023-08-24T14:07:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=178589"},"modified":"2023-08-24T17:08:28","modified_gmt":"2023-08-24T14:08:28","slug":"turkcell-den-300mw-lik-gunes-enerjisi-santrali-kurma-plani","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkcell-den-300mw-lik-gunes-enerjisi-santrali-kurma-plani\/","title":{"rendered":"(Turkish) Turkcell&#8217;den 300MW&#8217;l\u0131k G\u00fcne\u015f Enerjisi Santrali Kurma Plan\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/178589\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Turkcell \u0130leti\u015fim Hizmetleri A.\u015e. (TCELL) taraf\u0131ndan 22 A\u011fustos 2023 tarihinde Kamuyu Ayd\u0131nlatma Platformu\u2019na (KAP) yap\u0131lan bildirimde g\u00fcne\u015f enerjisi santrali kurulumu hakk\u0131nda a\u00e7\u0131klama yap\u0131ld\u0131.<\/strong><\/h2>\n<p>\u015eirket\u2019in KAP\u2019a yapt\u0131\u011f\u0131 a\u00e7\u0131klama <span style=\"text-decoration: underline;\">\u015fu \u015fekilde:<\/span><\/p>\n<p><em><strong>Turkcell Grubu<\/strong> olarak artan enerji ihtiyac\u0131n\u0131 ve maliyetlerini y\u00f6netmenin yan\u0131 s\u0131ra, s\u00fcrd\u00fcr\u00fclebilirlik \u00f6nceliklerimiz \u00e7er\u00e7evesinde operasyonlar\u0131m\u0131z\u0131 <strong>enerji verimlili\u011fi bilinciyle<\/strong> y\u00fcr\u00fct\u00fcyoruz. Bu kapsamda <strong><img loading=\"lazy\" class=\"alignright wp-image-178592\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/turkcell-den-300mw-lik-gunes-enerjisi-santrali-kurma-plani.jpg\" alt=\"\" width=\"320\" height=\"247\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/turkcell-den-300mw-lik-gunes-enerjisi-santrali-kurma-plani.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/turkcell-den-300mw-lik-gunes-enerjisi-santrali-kurma-plani-300x232.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/turkcell-den-300mw-lik-gunes-enerjisi-santrali-kurma-plani-500x386.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/turkcell-den-300mw-lik-gunes-enerjisi-santrali-kurma-plani-65x50.jpg 65w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/turkcell-den-300mw-lik-gunes-enerjisi-santrali-kurma-plani-260x200.jpg 260w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>2030 y\u0131l\u0131na kadar<\/strong> enerji t\u00fcketiminin <strong>%100\u2019\u00fcn\u00fc yenilenebilir enerji kaynaklar\u0131ndan<\/strong> sa\u011flamay\u0131 hedefliyoruz. Bu do\u011frultuda, son y\u0131llarda veri merkezi ve plazalar\u0131m\u0131z i\u00e7in geli\u015ftirdi\u011fimiz <strong>g\u00fcne\u015f enerjisi projeleri<\/strong>, 2021 y\u0131l\u0131nda sat\u0131n al\u0131nan <strong>18 MW<\/strong> kurulu g\u00fcce sahip <strong>Karada\u011f R\u00fczgar Enerjisi Santrali<\/strong> ve bug\u00fcne kadar yakla\u015f\u0131k<strong> 735 adet baz istasyonuna<\/strong> entegre etti\u011fimiz<strong> g\u00fcne\u015f enerjisi panelleri<\/strong> ile <strong>sekt\u00f6rde \u00f6nc\u00fc \u00e7\u00f6z\u00fcmleri<\/strong> hayata ge\u00e7irmi\u015ftik.<\/em><\/p>\n<p><em>Turkcell Grubu olarak, hedeflerimiz do\u011frultusunda, <strong>\u00fc\u00e7 sene<\/strong> i\u00e7erisinde <strong>300 MW kurulu g\u00fcce<\/strong> ve<strong> \u00f6z t\u00fcketim modeline<\/strong> sahip<strong> g\u00fcne\u015f enerjisi santralleri (GES) kurulumu<\/strong> planlanmaktad\u0131r. Bu ama\u00e7la \u015eirketimize, <strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e)<\/strong> ve <strong>ilgili b\u00f6lge Elektrik Da\u011f\u0131t\u0131m \u015firketleri<\/strong> taraf\u0131ndan, <strong>Elektrik Piyasas\u0131nda Lisanss\u0131z Elektrik \u00dcretimi Y\u00f6netmeli\u011fi\u2019nin<\/strong> ilgili <strong>5\/1h maddesi<\/strong> \u00e7er\u00e7evesinde <strong>213 MW kurulu g\u00fc\u00e7 kapasitesi<\/strong> tahsis edilmi\u015ftir, <strong>yeni kapasite izinleri i\u00e7in ise \u00e7al\u0131\u015fmalar devam etmektedir<\/strong>. S\u00f6z konusu enerji projelerinin yat\u0131r\u0131m tutar\u0131n\u0131n bug\u00fcnk\u00fc ekonomik ve makro g\u00f6stergeler dikkate al\u0131nd\u0131\u011f\u0131nda <strong>yakla\u015f\u0131k 240 milyon USD<\/strong> olmas\u0131 beklenmektedir.<\/em><\/p>\n<p><em>Yat\u0131r\u0131mlar\u0131n tamamlanmas\u0131 ile <strong>2026<\/strong> y\u0131l\u0131nda <strong>Turkcell Grubu<\/strong> taraf\u0131ndan <strong>t\u00fcketilen elektri\u011fin<\/strong> yakla\u015f\u0131k <strong>%65\u2019inin<\/strong> <strong>yenilenebilir kaynaklardan sa\u011flanmas\u0131<\/strong> hedeflenmektedir.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Turkcell \u0130leti\u015fim Hizmetleri A.\u015e. (TCELL) taraf\u0131ndan 22 A\u011fustos 2023 tarihinde Kamuyu Ayd\u0131nlatma Platformu\u2019na (KAP) yap\u0131lan bildirimde g\u00fcne\u015f enerjisi santrali kurulumu hakk\u0131nda a\u00e7\u0131klama [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":178592,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[110463,21768,16538,5436,64104,110460,110462,110461],"views":85,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/178589"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=178589"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/178589\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/178592"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=178589"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=178589"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=178589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}