{"id":178529,"date":"2023-08-23T16:05:26","date_gmt":"2023-08-23T13:05:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=178529"},"modified":"2023-08-23T16:05:26","modified_gmt":"2023-08-23T13:05:26","slug":"sedas-tan-sakarya-da-335-milyon-tl-yatirim-calismasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sedas-tan-sakarya-da-335-milyon-tl-yatirim-calismasi\/","title":{"rendered":"(Turkish) SEDA\u015e\u2019tan Sakarya\u2019da 335 Milyon TL Yat\u0131r\u0131m \u00c7al\u0131\u015fmas\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/178529\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>SEDA\u015e, Sakarya\u2019n\u0131n 138 farkl\u0131 lokasyonunda y\u0131l sonuna kadar tamamlanmas\u0131 planlanan yat\u0131r\u0131m ve bak\u0131m \u00e7al\u0131\u015fmalar\u0131 aral\u0131ks\u0131z devam ediyor. N\u00fcfus yo\u011funlu\u011funda 1 milyonun \u00fczerinde ki\u015finin ya\u015fad\u0131\u011f\u0131 b\u00f6lgede 335 milyon TL\u2019lik yat\u0131r\u0131m planlan\u0131yor.<\/strong><\/h2>\n<p>20 bin kilometrekarelik alandaki 3,8 milyon n\u00fcfusa hizmet veren Sakarya Elektrik Da\u011f\u0131t\u0131m A.\u015e. (SEDA\u015e), Sakarya\u2019daki yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131na h\u0131z veriyor. Kentteki ihtiya\u00e7lara g\u00f6re haz\u0131rlanan programda il\u00e7eler geneline g\u00f6re bu y\u0131l\u0131n sonuna kadar<strong> kapasite art\u0131r\u0131m\u0131, \u015febeke yenileme<\/strong> ve <strong>ana hatlarda devam <img loading=\"lazy\" class=\"alignright wp-image-178532\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/sedas-tan-sakarya-da-335-milyon-tl-yatirim-calismasi-1.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/sedas-tan-sakarya-da-335-milyon-tl-yatirim-calismasi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/sedas-tan-sakarya-da-335-milyon-tl-yatirim-calismasi-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/sedas-tan-sakarya-da-335-milyon-tl-yatirim-calismasi-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/sedas-tan-sakarya-da-335-milyon-tl-yatirim-calismasi-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/sedas-tan-sakarya-da-335-milyon-tl-yatirim-calismasi-1-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>eden yeralt\u0131 \u00e7al\u0131\u015fmalar\u0131n\u0131n tamamlanmas\u0131<\/strong> planlan\u0131yor. <strong>1 milyondan fazla<\/strong> ki\u015finin ya\u015fad\u0131\u011f\u0131 b\u00f6lgede s\u00fcrd\u00fcr\u00fclen yat\u0131r\u0131m\u0131n de\u011feri ise <strong>335 milyon TL<\/strong> oldu.<\/p>\n<p>SEDA\u015e Y\u00f6netim Kurulu ve \u0130cra Ba\u015fkan\u0131 Dr. Necmi Odyakmaz, titizlikle y\u00fcr\u00fct\u00fclen katma de\u011ferli projelerle SEDA\u015e\u2019\u0131n kaliteli hizmet ve kesintisiz enerjiyi hedefledi\u011fini s\u00f6yleyerek \u015funlar\u0131 kaydetti; <em>\u201c\u00dclkemizin \u00f6nemli sanayi kurulu\u015flar\u0131na ev sahipli\u011fi yapan Sakarya\u2019n\u0131n en g\u00fcncel ihtiya\u00e7lar\u0131n\u0131 ara\u015ft\u0131rarak m\u00fc\u015fterilerin beklentilerini kar\u015f\u0131layacak yat\u0131r\u0131m plan\u0131m\u0131za ara vermeden t\u00fcm g\u00fcc\u00fcm\u00fczle devam ediyoruz. Kentimize hem istihdam olanaklar\u0131 hem ekonomik fayda yaratan t\u00fcm il\u00e7elerimizde ayn\u0131 anda kapsaml\u0131 bir \u00e7al\u0131\u015fma y\u00fcr\u00fct\u00fcyoruz. Yat\u0131r\u0131mlar\u0131m\u0131zla m\u00fc\u015fteri memnuniyetini g\u00fcnden g\u00fcne art\u0131rarak, operasyonel faaliyetlerimizi daha da g\u00fc\u00e7lendirmeyi hedefliyoruz\u201d<\/em> dedi.<\/p>\n<p>SEDA\u015e ekipleri, Sakarya genelinde y\u00fcr\u00fctt\u00fc\u011f\u00fc kapsaml\u0131 \u00e7al\u0131\u015fmalarla <strong>80 kilometreyi<\/strong> a\u015fk\u0131n kablo-iletken \u00e7ekimi ve <strong>12 bin 500 adet<\/strong> direk montaj\u0131n\u0131 ger\u00e7ekle\u015ftirdi. Y\u0131l sonuna kadar k\u0131rsal kesimler de dahil olmak \u00fczere ilave <strong>26 adet<\/strong> beton k\u00f6\u015fk tipi trafo ve yakla\u015f\u0131k <strong>163 adet<\/strong> direk tipi trafo tesisinin devreye al\u0131nmas\u0131 sa\u011flanacak. G\u00fcn\u00fcn her saati g\u00f6rev ba\u015f\u0131nda olan ekipler, kentin t\u00fcm\u00fcnde<strong> \u015febeke yenileme, yeni alternatif \u015febeke tesisi, kapasite art\u0131\u015f\u0131 ve hatlarda g\u00fcvenlik mesafesi<\/strong> d\u00fczenlemesi gibi \u00e7al\u0131\u015fmalara devam ediyor.<\/p>\n<p>Elektrik hizmetinde s\u00fcreklili\u011fi sa\u011flamay\u0131 ve kentte artan enerji talebini kar\u015f\u0131lamay\u0131 hedefleyen \u00e7al\u0131\u015fmalar\u0131n enerjili hatta yap\u0131labilmesinin m\u00fcmk\u00fcn olmamas\u0131 nedeniyle planl\u0131 kesintilere ba\u015fvuruluyor. M\u00fc\u015fterilerin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak ad\u0131na zorunluluk ta\u015f\u0131yan planl\u0131 kesintilerde, can ve mal g\u00fcvenli\u011fini koruyabilmek i\u00e7in hatlardaki enerji devre d\u0131\u015f\u0131 b\u0131rak\u0131larak \u00f6nceden belirtilen s\u00fcre \u00e7er\u00e7evesinde <strong>planl\u0131 elektrik kesintisi<\/strong> ger\u00e7ekle\u015ftiriliyor. Bu sayede, <strong>yat\u0131r\u0131m<\/strong> ve <strong>bak\u0131m i\u015flemlerinin<\/strong> emniyetli bi\u00e7imde yap\u0131labilirken, \u015febekelerde de <strong>teknik s\u00fcrd\u00fcr\u00fclebilirlik<\/strong> sa\u011flan\u0131yor.<\/p>\n<p>Teknik ve d\u0131\u015f etmenlerden kaynakl\u0131 kesintilerin \u00f6n\u00fcne ge\u00e7ebilmek i\u00e7in yap\u0131lan \u00e7al\u0131\u015fmalarda planl\u0131 kesinti yap\u0131lacak b\u00f6lgelerin isimleri, <strong>48 saat<\/strong> \u00f6nceden <strong>SEDA\u015e web sitesinden<\/strong> duyuruluyor. Ayr\u0131ca, m\u00fc\u015fteriler sistemde <strong>kay\u0131tl\u0131 bulunan<\/strong> <strong>telefon numaralar\u0131na SMS g\u00f6nderilerek<\/strong> bilgilendiriliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. SEDA\u015e, Sakarya\u2019n\u0131n 138 farkl\u0131 lokasyonunda y\u0131l sonuna kadar tamamlanmas\u0131 planlanan yat\u0131r\u0131m ve bak\u0131m \u00e7al\u0131\u015fmalar\u0131 aral\u0131ks\u0131z devam ediyor. N\u00fcfus yo\u011funlu\u011funda 1 milyonun \u00fczerinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":178531,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[29819,102600,87056,34604,2444,51294,110437],"views":27,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/178529"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=178529"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/178529\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/178531"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=178529"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=178529"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=178529"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}