{"id":178492,"date":"2023-08-22T13:11:39","date_gmt":"2023-08-22T10:11:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=178492"},"modified":"2023-08-22T13:11:39","modified_gmt":"2023-08-22T10:11:39","slug":"macaristandaki-paks-ii-ngs-insasinin-ana-asamasi-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/macaristandaki-paks-ii-ngs-insasinin-ana-asamasi-basladi\/","title":{"rendered":"(Turkish) Macaristan\u2019daki Paks II NGS \u0130n\u015fas\u0131n\u0131n Ana A\u015famas\u0131 Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/178492\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Macaristan\u2019da in\u015fa edilecek Paks-II N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) ana y\u00fcklenicisi olan Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom\u2019un m\u00fchendislik b\u00f6l\u00fcm\u00fc Atomstroyexport A.\u015e, 3+ Nesil iki yeni VVER-1200 tipi g\u00fc\u00e7 \u00fcnitesinin ana in\u015faat \u00e7al\u0131\u015fmalar\u0131na start verdi.<\/h2>\n<p>Y\u00fcklenici Macar \u015firketi <strong>Duna Aszfalt Kft.,<\/strong> in\u015fa edilecek <strong>6\u2019nc\u0131 g\u00fc\u00e7 \u00fcnitesi<\/strong> i\u00e7in \u00e7ukur kazma haz\u0131rl\u0131klar\u0131 yaparken, <strong>Bauer Hungary Kft \u015firketi de<\/strong> in\u015faat sahas\u0131nda bir yandan yeralt\u0131 suyu kesme \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcrd\u00fc, bir yandan da zemin g\u00fc\u00e7lendirme \u00e7al\u0131\u015fmalar\u0131na ba\u015flad\u0131.<\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-178496\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/macaristandaki-paks-ii-ngs-insasinin-ana-asamasi-basladi-1.jpg\" alt=\"\" width=\"320\" height=\"246\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/macaristandaki-paks-ii-ngs-insasinin-ana-asamasi-basladi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/macaristandaki-paks-ii-ngs-insasinin-ana-asamasi-basladi-1-300x231.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/macaristandaki-paks-ii-ngs-insasinin-ana-asamasi-basladi-1-500x385.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/macaristandaki-paks-ii-ngs-insasinin-ana-asamasi-basladi-1-65x50.jpg 65w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/08\/macaristandaki-paks-ii-ngs-insasinin-ana-asamasi-basladi-1-260x200.jpg 260w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Ana in\u015faat \u00e7al\u0131\u015fmalar\u0131na, taraflar\u0131n <strong>18 A\u011fustos&#8217;ta iki yeni g\u00fc\u00e7 \u00fcnitesinin in\u015fas\u0131na<\/strong> ili\u015fkin s\u00f6zle\u015fmede yap\u0131lan de\u011fi\u015fiklikleri imzalamalar\u0131n\u0131n ard\u0131ndan ba\u015fland\u0131. \u00c7al\u0131\u015fmalar\u0131n ba\u015flamas\u0131 i\u00e7in, <strong>Paks II NGS projesinin<\/strong> Macar m\u00fc\u015fterisi <strong>Paks II NGS Ltd. \u015eti.<\/strong> taraf\u0131ndan projenin ikinci, yani <strong>ana in\u015faat a\u015famas\u0131na ge\u00e7i\u015fine ili\u015fkin ilgili resmi bildirimi<\/strong> yay\u0131mlamas\u0131 da beklendi.<\/p>\n<p>\u0130n\u015fa edilecek <strong>6\u2019nc\u0131 g\u00fc\u00e7 \u00fcnitesi<\/strong> i\u00e7in<strong> 5 metre<\/strong> derinli\u011finde kaz\u0131lan \u00e7ukur, kapsaml\u0131 \u00e7al\u0131\u015fmalar\u0131n ba\u015flang\u0131c\u0131 niteli\u011fini ta\u015f\u0131d\u0131\u011f\u0131ndan b\u00fcy\u00fck \u00f6nem arz ediyor. \u00c7ukurdan yakla\u015f\u0131k <strong>1 milyon metrek\u00fcp toprak<\/strong> \u00e7\u0131kar\u0131lacak. Planlanan takvime g\u00f6re d\u00f6rt futbol sahas\u0131na e\u015fde\u011fer b\u00fcy\u00fckl\u00fckte olan <strong>6\u2019nc\u0131 g\u00fc\u00e7 \u00fcnitesinin in\u015fa sahas\u0131nda<\/strong> y\u00fcr\u00fct\u00fclen bu \u00e7al\u0131\u015fma <strong>sonbahar sonuna kadar<\/strong> devam edecek.<\/p>\n<p>Ana in\u015faat a\u015famas\u0131na ge\u00e7ilmesi i\u00e7in al\u0131nan izin hem <strong>Rus \u015firketlerinde<\/strong> hem de <strong>Rosatom&#8217;un<\/strong> ilgili kurulu\u015flar\u0131nda <strong>ana g\u00fc\u00e7 ekipmanlar\u0131n\u0131n \u00fcretimine<\/strong> ba\u015flanmas\u0131n\u0131 da m\u00fcmk\u00fcn k\u0131l\u0131yor. <strong>Atomstroyexport<\/strong> ad\u0131na \u00fcreticilere ekipmanlar\u0131n \u00fcretime ba\u015flamalar\u0131 i\u00e7in talimat verildi. <strong>Paks II NGS Projesi<\/strong> in\u015faat\u0131nda ana a\u015famaya ge\u00e7ilmesi, t\u00fcm \u00f6nemli bina ve yap\u0131lar\u0131n in\u015fas\u0131na ba\u015flanmas\u0131na olanak sa\u011fl\u0131yor. S\u00f6z konusu <strong>yeni a\u015fama, personel, makine ve ekipman<\/strong> say\u0131s\u0131nda <strong>b\u00fcy\u00fck art\u0131\u015f<\/strong> gerektirecek. Projede i\u015f yo\u011funlu\u011fu s\u00fcrekli olarak artacak.<\/p>\n<p><strong>Macar<\/strong> ve <strong>Avrupal\u0131 \u015firketlerin<\/strong> yan\u0131 s\u0131ra <strong>\u00fc\u00e7\u00fcnc\u00fc \u00fclkelerden<\/strong> \u015firketler de <strong>Paks II NGS projesinde<\/strong> yer almaya b\u00fcy\u00fck ilgi g\u00f6steriyor. B\u00f6ylelikle Paks II NGS, Macar ekonomisi sadece g\u00fcvenilir bir enerji \u00fcretim kayna\u011f\u0131 elde etmekle kalmay\u0131p hissedilir oranda vergi gelirleri, sadece santralin in\u015fas\u0131 s\u0131ras\u0131nda yakla\u015f\u0131k 10 bin yeni istihdam yarat\u0131lmas\u0131 ve Rus end\u00fcstrisinin ekipman \u00fcretimi i\u00e7in \u00e7ok say\u0131da sipari\u015f almas\u0131 dolay\u0131s\u0131yla bir\u00e7ok y\u00f6nden ekonomiye katk\u0131da bulunacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Macaristan\u2019da in\u015fa edilecek Paks-II N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) ana y\u00fcklenicisi olan Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom\u2019un m\u00fchendislik b\u00f6l\u00fcm\u00fc Atomstroyexport A.\u015e, 3+ [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":178495,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[81723,104827,19356,105587,2587,54329],"views":49,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/178492"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=178492"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/178492\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/178495"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=178492"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=178492"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=178492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}