{"id":177892,"date":"2023-07-28T16:46:02","date_gmt":"2023-07-28T13:46:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=177892"},"modified":"2023-07-28T16:49:22","modified_gmt":"2023-07-28T13:49:22","slug":"yapilan-kapasite-tahsisi-ardindan-310-mwlik-ek-kapasite-kaldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yapilan-kapasite-tahsisi-ardindan-310-mwlik-ek-kapasite-kaldi\/","title":{"rendered":"(Turkish) Yap\u0131lan Kapasite Tahsisi Ard\u0131ndan 310 MW\u2019l\u0131k Ek Kapasite Kald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/177892\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e), Enerji Piyasas\u0131 D\u00fczenleme Kurulu taraf\u0131ndan kapasite tahsisleriyle ilgili olarak 16.03.2023 tarihli ve 11731 say\u0131l\u0131 al\u0131nan Kurul Karar\u0131 <img loading=\"lazy\" class=\"alignright wp-image-177894\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/yapilan-kapasite-tahsisi-ardindan-310-mwlik-ek-kapasite-kaldi.jpg\" alt=\"\" width=\"320\" height=\"244\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/yapilan-kapasite-tahsisi-ardindan-310-mwlik-ek-kapasite-kaldi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/yapilan-kapasite-tahsisi-ardindan-310-mwlik-ek-kapasite-kaldi-300x229.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/yapilan-kapasite-tahsisi-ardindan-310-mwlik-ek-kapasite-kaldi-500x382.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/yapilan-kapasite-tahsisi-ardindan-310-mwlik-ek-kapasite-kaldi-65x50.jpg 65w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>do\u011frultusunda haz\u0131rlanan b\u00f6lgesel kapasiteleri a\u00e7\u0131klad\u0131.<\/strong><\/h2>\n<p><strong>Temmuz 2023<\/strong> itibariyle, <strong>ana kayna\u011f\u0131 r\u00fczgar ve g\u00fcne\u015f olan santraller<\/strong> i\u00e7in <strong>hi\u00e7 kapasite kalmazken<\/strong>; ana kayna\u011f\u0131<strong> r\u00fczgar veya g\u00fcne\u015f olan proje<\/strong> veya<strong> tesisler<\/strong> ile <strong>yard\u0131mc\u0131 kayna\u011f\u0131 r\u00fczgar veya g\u00fcne\u015f olmayan<\/strong> proje veya tesisler hari\u00e7 birden \u00e7ok kaynakl\u0131 elektrik \u00fcretim tesisine d\u00f6n\u00fc\u015f\u00fcm talep edilen proje veya tesisler i\u00e7in kapasiteler<strong> 169,8 MW<\/strong> olarak a\u00e7\u0131kland\u0131.<\/p>\n<p>Elektrik piyasas\u0131nda lisanss\u0131z elektrik \u00fcretim y\u00f6netmeli\u011finin madde-5 (1-h) h\u00fckm\u00fc kapsam\u0131nda iletim seviyesinden sisteme ba\u011flanacak \u00fcretim tesisi talepleri i\u00e7in kapasiteler ise <strong>140,5 MW<\/strong> olarak a\u00e7\u0131kland\u0131. Sonu\u00e7 olarak, <strong>2023 Temmuz<\/strong> ay\u0131nda <strong>r\u00fczgar, g\u00fcne\u015f, lisanss\u0131z ve hibrit santraller<\/strong> i\u00e7in yap\u0131lan kapasite tahsisi ard\u0131ndan <strong>310 MW\u2019l\u0131k ek kapasite<\/strong> kald\u0131\u011f\u0131 belirlendi.<\/p>\n<p>Kapasite tahsisleri duyurusu i\u00e7in <a href=\"https:\/\/www.solar.ist\/wp-content\/uploads\/2023\/07\/Kapasite-Tahsisleri-Hakk%C4%B1nda-Duyuru-Temmuz-2023.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>T\u0131klay\u0131n&gt;&gt;<\/strong><\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e), Enerji Piyasas\u0131 D\u00fczenleme Kurulu taraf\u0131ndan kapasite tahsisleriyle ilgili olarak 16.03.2023 tarihli ve 11731 say\u0131l\u0131 al\u0131nan Kurul Karar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":177894,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[227,76967,46048,53036,69,1582],"views":64,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177892"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=177892"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177892\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/177894"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=177892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=177892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=177892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}