{"id":177698,"date":"2023-07-23T14:35:22","date_gmt":"2023-07-23T11:35:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=177698"},"modified":"2023-07-23T14:51:40","modified_gmt":"2023-07-23T11:51:40","slug":"europower-enerji-gerilim-trafosu-uretimi-testlerini-tamamladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/europower-enerji-gerilim-trafosu-uretimi-testlerini-tamamladi\/","title":{"rendered":"(Turkish) &#8217;Europower Enerji&#8217; Gerilim Trafosu \u00dcretimi Testlerini Tamamlad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/177698\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Europower Enerji ve Otomasyon Teknolojileri Sanayi Ticaret A.\u015e. taraf\u0131ndan ak\u0131m\/gerilim trafosu \u00fcretimi testlerinin ba\u015far\u0131yla tamamland\u0131\u011f\u0131 bildirildi.<\/strong><\/h2>\n<h2><strong><img loading=\"lazy\" class=\"alignright wp-image-177700\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/europower-enerji-gerilim-trafosu-uretimi-testlerini-tamamladi.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/europower-enerji-gerilim-trafosu-uretimi-testlerini-tamamladi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/europower-enerji-gerilim-trafosu-uretimi-testlerini-tamamladi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/europower-enerji-gerilim-trafosu-uretimi-testlerini-tamamladi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/europower-enerji-gerilim-trafosu-uretimi-testlerini-tamamladi-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h2>\n<p><strong>Kamuyu Ayd\u0131nlatma Platformuna (KAP)<\/strong> yap\u0131lan <span style=\"text-decoration: underline;\">a\u00e7\u0131klama \u015f\u00f6yle:<\/span><\/p>\n<p><em>&#8220;\u015eirket <strong>Ar-Ge<\/strong> ve<strong> test ekibimiz<\/strong>, <strong>40.5 kV<\/strong> mesnet tipi <strong>ak\u0131m trafosu \/ gerilim trafosu<\/strong> tasar\u0131m ve prototip projesinin ve \u00fcr\u00fcnle ilgili <strong>\u00fcretim deneme testlerini ba\u015far\u0131yla tamamlam\u0131\u015ft\u0131r.<\/strong> Seri \u00fcretimine ba\u015flanacak <strong>ak\u0131m \/ gerilim trafolar\u0131<\/strong> i\u00e7in ilk etapta ayl\u0131k \u00fcretim hedefi<strong> 1.500 adet<\/strong> olup, kademeli art\u0131\u015fla ayl\u0131k \u00fcretim adetinin <strong>3.000\u2019e<\/strong> <strong>\u00e7\u0131kar\u0131lmas\u0131<\/strong> planlanm\u0131\u015ft\u0131r. Bu sayede \u00fcretmekte oldu\u011fumuz <strong>OG h\u00fccrelerin \u00f6nemli bir komponentini<\/strong> kendi b\u00fcnyemizde imal ediyor olaca\u011f\u0131z. Grubumuzun ihtiyac\u0131n\u0131 kar\u015f\u0131layacak <strong>ak\u0131m \/ gerilim trafolar\u0131n\u0131n<\/strong> ayn\u0131 zamanda <strong>epoksi re\u00e7ine izolat\u00f6r<\/strong> ve <strong>komponentleriyle<\/strong> yurt i\u00e7i ve yurt d\u0131\u015f\u0131 pazarlarda sat\u0131\u015f\u0131 ger\u00e7ekle\u015fecektir. Has\u0131lat\u0131m\u0131za etkisinin <strong>y\u0131ll\u0131k bazda 20 milyon dolar seviyesinde<\/strong> olmas\u0131 beklenmektedir.&#8221;<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Europower Enerji ve Otomasyon Teknolojileri Sanayi Ticaret A.\u015e. taraf\u0131ndan ak\u0131m\/gerilim trafosu \u00fcretimi testlerinin ba\u015far\u0131yla tamamland\u0131\u011f\u0131 bildirildi. Kamuyu Ayd\u0131nlatma Platformuna (KAP) yap\u0131lan a\u00e7\u0131klama [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":177700,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[110188,106550,110189,110190],"views":41,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177698"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=177698"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177698\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/177700"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=177698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=177698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=177698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}