{"id":177587,"date":"2023-07-19T15:32:18","date_gmt":"2023-07-19T12:32:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=177587"},"modified":"2023-07-19T15:32:35","modified_gmt":"2023-07-19T12:32:35","slug":"coruh-edas-tan-giresun-a-2023-ilk-yarida-1715-milyon-tl-lik-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/coruh-edas-tan-giresun-a-2023-ilk-yarida-1715-milyon-tl-lik-yatirim\/","title":{"rendered":"(Turkish) \u00c7oruh EDA\u015e\u2019tan Giresun\u2019a 2023 \u0130lk Yar\u0131da 171,5 Milyon TL\u2019lik Yat\u0131r\u0131m"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/177587\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>\u00c7oruh Elektrik Da\u011f\u0131t\u0131m A\u015e (\u00c7oruh EDA\u015e), Giresun\u2019daki yat\u0131r\u0131mlar\u0131na kesintisiz olarak devam ederken \u015fehrin en i\u015flek lokasyonlar\u0131nda \u00f6nemli bir \u00e7al\u0131\u015fmaya imza att\u0131. Merkez Hac\u0131siyam ve \u00c7\u0131tlakkale Mahallerine kesintisiz enerji arz\u0131 sa\u011flamak i\u00e7in trafo ve iletkenlerde kapasite art\u0131\u015f\u0131na giden \u00c7oruh EDA\u015e, ihtiya\u00e7 olan b\u00f6lgelere ilave \u015febekeler tesis etti, havai elektrik tellerini de yeralt\u0131na alarak \u015fehrin daha modern bir g\u00f6r\u00fcn\u00fcme kavu\u015fmas\u0131n\u0131 sa\u011flad\u0131.<\/h2>\n<p>Hac\u0131siyam Mahallesi\u2019nde toplam<strong> 11 trafo<\/strong> b\u00f6lgesinde yakla\u015f\u0131k <strong>25 kilometre<\/strong> yeralt\u0131 kablo tesisi ve g\u00fc\u00e7lendirme \u00e7al\u0131\u015fmalar\u0131 yap\u0131larak b\u00f6lgeye <strong>3 adet ilave trafo tesis edildi<\/strong>. B\u00f6lgede artan <img loading=\"lazy\" class=\"alignright wp-image-177589\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/coruh-edas-tan-giresun-a-2023-ilk-yarida-1715-milyon-tl-lik-yatirim.jpg\" alt=\"\" width=\"320\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/coruh-edas-tan-giresun-a-2023-ilk-yarida-1715-milyon-tl-lik-yatirim.jpg 490w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/coruh-edas-tan-giresun-a-2023-ilk-yarida-1715-milyon-tl-lik-yatirim-300x187.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/coruh-edas-tan-giresun-a-2023-ilk-yarida-1715-milyon-tl-lik-yatirim-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>yap\u0131la\u015fmalar\u0131n enerji ihtiya\u00e7lar\u0131 kar\u015f\u0131lanmas\u0131na y\u00f6nelik ger\u00e7ekle\u015ftirilen projeler kapsam\u0131nda toplam <strong>17 Milyon TL<\/strong> tutar\u0131nda yat\u0131r\u0131m harcamas\u0131 yap\u0131l\u0131rken <strong>2023 y\u0131l\u0131n\u0131n ilk yar\u0131s\u0131nda<\/strong> <strong>171,5 Milyon TL<\/strong>\u2019lik enerjilendirme \u00e7al\u0131\u015fmas\u0131 tamamlanm\u0131\u015f oldu.<\/p>\n<p>\u00c7oruh EDA\u015e Giresun \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019nden yap\u0131lan a\u00e7\u0131klamada, <em>\u201cGiresun genelinde kesintisiz enerji odakl\u0131 \u00e7al\u0131\u015fmalar\u0131m\u0131za devam ediyoruz. <strong>Hac\u0131siyam<\/strong> ve <strong>\u00c7\u0131tlakkale Mahallerinde<\/strong> ger\u00e7ekle\u015ftirdi\u011fimiz \u00e7al\u0131\u015fmalar ile b\u00f6lgede artan yap\u0131la\u015fman\u0131n getirdi\u011fi enerji ihtiyac\u0131na y\u00f6nelik yat\u0131r\u0131mlar\u0131m\u0131za \u00f6n\u00fcm\u00fczdeki d\u00f6nemde de devam edece\u011fiz. \u015eehrin en \u00f6nemli caddelerinden birisi olan <strong>Teyyared\u00fcz\u00fc Mahallesi, Boztekke Caddesi\u2019ndeki<\/strong> <strong>al\u00e7ak ve y\u00fcksek gerilim elektrik hatlar\u0131n\u0131n<\/strong> yer alt\u0131na al\u0131nmas\u0131 \u00e7al\u0131\u015fmalar\u0131na haziran ay\u0131 itibar\u0131yla ba\u015flad\u0131k. S\u00f6z konusu proje kapsam\u0131nda yakla\u015f\u0131k <strong>4 bin 500 metre y\u00fcksek gerilim yeralt\u0131 kablosu<\/strong> ile yakla\u015f\u0131k <strong>3 bin 500 metre al\u00e7ak gerilim yeralt\u0131 kablosu<\/strong> tesis edilerek <strong>havai hatlar yer alt\u0131na al\u0131nacak<\/strong> ve b\u00f6lgenin enerji altyap\u0131 kalitesinin art\u0131r\u0131lmas\u0131 sa\u011flanacak. Projeyi \u00f6n\u00fcm\u00fczdeki g\u00fcnlerde tamamlamay\u0131 hedefliyoruz\u201d<\/em> denildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7oruh Elektrik Da\u011f\u0131t\u0131m A\u015e (\u00c7oruh EDA\u015e), Giresun\u2019daki yat\u0131r\u0131mlar\u0131na kesintisiz olarak devam ederken \u015fehrin en i\u015flek lokasyonlar\u0131nda \u00f6nemli bir \u00e7al\u0131\u015fmaya imza att\u0131. Merkez [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":177589,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[110157,39601,97932,4640,110156,110155],"views":31,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177587"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=177587"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177587\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/177589"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=177587"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=177587"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=177587"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}