{"id":177204,"date":"2023-07-11T14:09:26","date_gmt":"2023-07-11T11:09:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=177204"},"modified":"2023-07-11T14:13:21","modified_gmt":"2023-07-11T11:13:21","slug":"ziyaretci-akini-sivas-tokat-ve-yozgatta-elektrik-tuketimini-artirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ziyaretci-akini-sivas-tokat-ve-yozgatta-elektrik-tuketimini-artirdi\/","title":{"rendered":"(Turkish) Ziyaret\u00e7i Ak\u0131n\u0131; Sivas, Tokat ve Yozgat\u2019ta Elektrik T\u00fcketimini Art\u0131rd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/177204\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Kurban Bayram\u0131 tatili hafta sonlar\u0131 ile 9 g\u00fcne ula\u015f\u0131nca b\u00fcy\u00fck\u015fehirlerde ya\u015fayanlar\u0131n memleketlerine ziyarete gitmesi \u00c7EDA\u015e\u2019\u0131n elektrik da\u011f\u0131t\u0131m hizmeti verdi\u011fi Sivas, Tokat ve Yozgat\u2019\u0131n toplam elektrik t\u00fcketiminde art\u0131\u015fa neden oldu.<\/strong><\/h2>\n<p>Bayramda b\u00fcy\u00fck sanayi tesislerinin pek \u00e7o\u011funun kapal\u0131 oldu\u011fu \u00c7EDA\u015e\u2019\u0131n hizmet b\u00f6lgesinde <strong>24 Haziran- 2 Temmuz<\/strong> aras\u0131nda bir \u00f6nceki y\u0131l\u0131n ayn\u0131 d\u00f6nemine g\u00f6re elektrik t\u00fcketimi <strong>y\u00fczde 3,2<\/strong> artt\u0131. Bu d\u00f6nemde \u00f6zellikle<strong> k\u00f6yler<\/strong> ve <strong>yaylalar\u0131n elektrik t\u00fcketiminde<\/strong> y\u00fckseli\u015f g\u00f6zlendi.<\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-177210\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/ziyaretci-akini-sivas-tokat-ve-yozgatta-elektrik-tuketimini-artirdi-1.jpg\" alt=\"\" width=\"320\" height=\"243\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/ziyaretci-akini-sivas-tokat-ve-yozgatta-elektrik-tuketimini-artirdi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/ziyaretci-akini-sivas-tokat-ve-yozgatta-elektrik-tuketimini-artirdi-1-300x227.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/ziyaretci-akini-sivas-tokat-ve-yozgatta-elektrik-tuketimini-artirdi-1-500x379.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/ziyaretci-akini-sivas-tokat-ve-yozgatta-elektrik-tuketimini-artirdi-1-66x50.jpg 66w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/p>\n<p>B\u00fcy\u00fck\u015fehirlerde ya\u015fayanlar, bu y\u0131l 9 g\u00fcne \u00e7\u0131kan bayram tatilini f\u0131rsat bilip memleketlerini ziyarete ko\u015funca, b\u00fcy\u00fck sanayi tesislerinin \u00e7o\u011fu bayram nedeniyle kapal\u0131 oldu\u011fu halde, Anadolu\u2019nun pek \u00e7ok kentinde b\u00fcy\u00fck hareket ya\u015fand\u0131. <strong>\u00c7aml\u0131bel Elektrik Da\u011f\u0131t\u0131m<\/strong> A.\u015e.\u2019nin (\u00c7EDA\u015e) elektrik da\u011f\u0131t\u0131m hizmeti verdi\u011fi <strong>Sivas, Tokat ve Yozgat da<\/strong> ya\u015fanan bu hareketten pay\u0131n\u0131 ald\u0131.<\/p>\n<p>\u00c7EDA\u015e\u2019\u0131n \u201cKurban Bayram\u0131 Elektrik T\u00fcketim Analizi\u201dnde yer alan verilere g\u00f6re 24 Haziran-2 Temmuz tarihleri aras\u0131nda Sivas, Tokat ve Yozgat\u2019taki toplam elektrik t\u00fcketiminde ge\u00e7en y\u0131l\u0131n ayn\u0131 tarihlerine g\u00f6re y\u00fczde 3,2\u2019ye varan bir art\u0131\u015f ya\u015fand\u0131. Sanayi ve ticarethanelerin aktif olarak \u00e7al\u0131\u015ft\u0131\u011f\u0131<strong> 24 Haziran-2 Temmuz 2022<\/strong> tarihinde \u00fc\u00e7 ildeki toplam elektrik t\u00fcketimi <strong>61 bin 693 MWh<\/strong> iken, bu y\u0131l ayn\u0131 tarihlerde bayram nedeniyle pek \u00e7ok ticari i\u015fletme ve sanayi kurulu\u015fu kapal\u0131 oldu\u011fu halde elektrik t\u00fcketimi <strong>63 bin 696 MWh<\/strong>\u2019ye ula\u015ft\u0131. Arife ve Kurban Bayram\u0131 g\u00fcnlerini kapsayan 27 Haziran-1 Temmuz tarihleri aras\u0131nda ise <strong>\u00c7EDA\u015e\u2019\u0131n<\/strong> hizmet b\u00f6lgesindeki elektrik t\u00fcketimi <strong>35 bin 377 MWh<\/strong> ile ge\u00e7en y\u0131l\u0131n ayn\u0131 tarihlerine g\u00f6re<strong> y\u00fczde 3,14<\/strong> daha fazla oldu. Bu tarihler aras\u0131ndaki en y\u00fcksek t\u00fcketim de<strong> 7 bin 269 MWh<\/strong> ile Kurban Bayram\u0131\u2019n\u0131n <strong>4\u2019\u00fcnc\u00fc yani son g\u00fcn\u00fcnde<\/strong> ya\u015fand\u0131. Bu arada haziran ay\u0131n\u0131n ortalar\u0131na kadar devam eden ya\u011f\u0131\u015flar sebebiyle <strong>tar\u0131msal sulama faaliyetlerinde<\/strong> kullan\u0131lan elektrik t\u00fcketiminin azalmas\u0131, deprem b\u00f6lgesine olan yak\u0131nl\u0131k sebebiyle b\u00f6lgedeki \u00fcretim ve t\u00fcketimde ya\u015fanan daralmalar\u0131n da etkisi ile ge\u00e7mi\u015f y\u0131llara k\u0131yasla bu bayramda elektrik t\u00fcketiminde art\u0131\u015f oranlar\u0131n\u0131n s\u0131n\u0131rl\u0131 kald\u0131\u011f\u0131 g\u00f6r\u00fcld\u00fc.<\/p>\n<h3><strong>\u201c9 G\u00dcNL\u00dcK TAT\u0130LDE PLANLI KES\u0130NT\u0130LER \u0130PTAL ED\u0130LD\u0130\u201d<\/strong><\/h3>\n<p>Bayram tatili boyunca \u00f6zellikle <strong>k\u0131rsal kesimde<\/strong> ve <strong>yaylalarda<\/strong> elektrik t\u00fcketiminde bir art\u0131\u015f g\u00f6zlendi\u011fine i\u015faret eden <strong>\u00c7EDA\u015e Genel M\u00fcd\u00fcr\u00fc Niyazi K\u0131v\u0131lc\u0131m<\/strong>, normal bir haftaya g\u00f6re bu b\u00f6lgelerde art\u0131\u015f oranlar\u0131n\u0131n yakla\u015f\u0131k <strong>y\u00fczde 7\u2019yi<\/strong> buldu\u011funu s\u00f6yledi.<\/p>\n<p>Genel M\u00fcd\u00fcr K\u0131v\u0131lc\u0131m,<em> \u201cYakla\u015f\u0131k 600 bin n\u00fcfusa sahip olan Sivas\u2019\u0131m\u0131zda bayram boyunca n\u00fcfusun 2 milyona ula\u015ft\u0131\u011f\u0131 tahmin ediliyor. Kurban Bayram\u0131 tatilinin hafta sonlar\u0131 ile birlikte 9 g\u00fcne uzamas\u0131yla birlikte ge\u00e7mi\u015f y\u0131llarda oldu\u011fu gibi b\u00f6lgemize bir ziyaret\u00e7i ak\u0131n\u0131 olaca\u011f\u0131n\u0131 \u00f6ng\u00f6rerek enerji konusunda hi\u00e7bir s\u0131k\u0131nt\u0131 ya\u015fanmamas\u0131 i\u00e7in gerekli tedbirleri ald\u0131k. \u00d6ncelikle 24 saat esasl\u0131 personel ve ara\u00e7 planlamas\u0131 yaparken, sorumluluk saham\u0131zda 9 g\u00fcn boyunca planl\u0131 kesintileri iptal ettik. Al\u00e7ak gerilim ve orta gerilim seviyesinde y\u00fck dengelemeleri yaparak y\u00fcke ba\u011fl\u0131 kesintilerin \u00f6n\u00fcne ge\u00e7tik. Yine \u00f6zellikle merkezlerde k\u0131smi de\u015farj ve termal kamera tespitleri ile ar\u0131zaya sebebiyet verebilecek eksiklikleri bayram \u00f6ncesinde giderdik. Dallar\u0131n elektrik tellerine de\u011ferek ar\u0131zaya sebep olmamas\u0131 i\u00e7in a\u011fa\u00e7 budamalar\u0131 yapt\u0131k, havai hat ve ayd\u0131nlatmalarda gerekli bak\u0131mlar\u0131 tamamlad\u0131k. Hizmet b\u00f6lgemizde bu d\u00f6nemde artan n\u00fcfusa kar\u015f\u0131, olduk\u00e7a ba\u015far\u0131l\u0131 bir s\u00fcre\u00e7 y\u00f6nettik\u201d<\/em> de\u011ferlendirmesinde bulundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Kurban Bayram\u0131 tatili hafta sonlar\u0131 ile 9 g\u00fcne ula\u015f\u0131nca b\u00fcy\u00fck\u015fehirlerde ya\u015fayanlar\u0131n memleketlerine ziyarete gitmesi \u00c7EDA\u015e\u2019\u0131n elektrik da\u011f\u0131t\u0131m hizmeti verdi\u011fi Sivas, Tokat ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":177209,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[29799,5179,15016,130],"views":45,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177204"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=177204"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177204\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/177209"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=177204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=177204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=177204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}