{"id":177193,"date":"2023-07-10T16:16:02","date_gmt":"2023-07-10T13:16:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=177193"},"modified":"2023-07-10T16:16:31","modified_gmt":"2023-07-10T13:16:31","slug":"uzungol-1-hese-38-yil-2-aylik-uretim-izni-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/uzungol-1-hese-38-yil-2-aylik-uretim-izni-verildi\/","title":{"rendered":"(Turkish) &#8217;Uzung\u00f6l 1 HES&#8217;e 38 Y\u0131l 2 Ayl\u0131k \u00dcretim \u0130zni Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/177193\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>EPDK taraf\u0131ndan Trabzonspor Elektrik A.\u015e\u2019nin Uzung\u00f6l 1 Reg\u00fclat\u00f6r\u00fc ve HES tesisine 38 y\u0131l, 2 ay s\u00fcreli \u00fcretim izni verildi.<img loading=\"lazy\" class=\"alignright wp-image-177195\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/uzungol-1-hese-38-yil-2-aylik-uretim-izni-verildi.jpg\" alt=\"\" width=\"320\" height=\"229\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/uzungol-1-hese-38-yil-2-aylik-uretim-izni-verildi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/uzungol-1-hese-38-yil-2-aylik-uretim-izni-verildi-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/uzungol-1-hese-38-yil-2-aylik-uretim-izni-verildi-500x358.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/uzungol-1-hese-38-yil-2-aylik-uretim-izni-verildi-70x50.jpg 70w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/h2>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK), 11 May\u0131s 2023 tarihli ve 11838-8 say\u0131l\u0131 karar\u0131yla <strong>Trabzonspor Bordo Mavi Enerji Elektrik \u00dcretim Ticaret A.\u015e<\/strong>\u2019ye, <strong>Uzung\u00f6l 1 Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali (HES)<\/strong> i\u00e7in 08 Nisan 2021 tarihinde verdi\u011fi E\u00dc\/10127-12\/04853 numaral\u0131 \u00fcretim lisans\u0131n\u0131 <strong>11 May\u0131s 2023<\/strong> tarihi itibar\u0131yla sonland\u0131rd\u0131.<\/p>\n<p>EPDK, Trabzonspor Elektrik \u00dcretim Ticaret A.\u015e\u2019ye <strong>Uzung\u00f6l 1 HES<\/strong> i\u00e7in eskisinin devam\u0131 mahiyetinde <strong>38 y\u0131l, 1 ay, 24 g\u00fcn<\/strong> s\u00fcreli <strong>yeni \u00fcretim lisans\u0131<\/strong> verdi.<\/p>\n<p>Trabzon ilinin \u00c7aykara il\u00e7esinde in\u015fas\u0131 devam eden <strong>Uzung\u00f6l 1 HES<\/strong> devreye al\u0131nd\u0131\u011f\u0131nda, <strong>28,21MWe<\/strong>\u2019l\u0131k <strong>i\u015fletme kapasitesiyle <\/strong>\u00e7al\u0131\u015facak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. EPDK taraf\u0131ndan Trabzonspor Elektrik A.\u015e\u2019nin Uzung\u00f6l 1 Reg\u00fclat\u00f6r\u00fc ve HES tesisine 38 y\u0131l, 2 ay s\u00fcreli \u00fcretim izni verildi. Enerji Piyasas\u0131 D\u00fczenleme [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":177195,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[110024,68,18,750,34926,70,1090,842,4000,27998,110025,110026,110023],"views":125,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177193"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=177193"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177193\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/177195"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=177193"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=177193"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=177193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}