{"id":177157,"date":"2023-07-10T13:36:54","date_gmt":"2023-07-10T10:36:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=177157"},"modified":"2023-07-10T13:36:54","modified_gmt":"2023-07-10T10:36:54","slug":"istanbul-avrupa-yakasi-nda-9-gunluk-tatilde-elektrik-tuketimi-yuzde-30-geriledi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/istanbul-avrupa-yakasi-nda-9-gunluk-tatilde-elektrik-tuketimi-yuzde-30-geriledi\/","title":{"rendered":"(Turkish) \u0130stanbul Avrupa Yakas\u0131&#8217;nda 9 G\u00fcnl\u00fck Tatilde Elektrik T\u00fcketimi %30 Geriledi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/177157\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>\u0130stanbul\u2019da ya\u015fayanlar 9 g\u00fcnl\u00fck bayram tatilinde memleketlerine ve sahil kentlerine ak\u0131n edince elektrik t\u00fcketimi neredeyse \u00fc\u00e7te bir oran\u0131nda d\u00fc\u015ft\u00fc. \u0130stanbul Avrupa Yakas\u0131\u2019nda elektrik da\u011f\u0131t\u0131m hizmeti veren BEDA\u015e\u2019\u0131n verilerine g\u00f6re 24 Haziran-2 Temmuz tarihleri aras\u0131nda elektrik t\u00fcketimindeki d\u00fc\u015f\u00fc\u015f, ge\u00e7en y\u0131l\u0131n ayn\u0131 d\u00f6nemine g\u00f6re y\u00fczde 30\u2019u buldu.<\/strong><\/h2>\n<p>T\u00fcrkiye\u2019nin k\u00fclt\u00fcr ve finans ba\u015fkenti \u0130stanbul, bu y\u0131l da Kurban Bayram\u0131 tatilinin hafta sonlar\u0131 ile <img loading=\"lazy\" class=\"alignright wp-image-177162\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/istanbul-avrupa-yakasi-nda-9-gunluk-tatilde-elektrik-tuketimi-yuzde-30-geriledi-1.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/istanbul-avrupa-yakasi-nda-9-gunluk-tatilde-elektrik-tuketimi-yuzde-30-geriledi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/istanbul-avrupa-yakasi-nda-9-gunluk-tatilde-elektrik-tuketimi-yuzde-30-geriledi-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/istanbul-avrupa-yakasi-nda-9-gunluk-tatilde-elektrik-tuketimi-yuzde-30-geriledi-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/istanbul-avrupa-yakasi-nda-9-gunluk-tatilde-elektrik-tuketimi-yuzde-30-geriledi-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/istanbul-avrupa-yakasi-nda-9-gunluk-tatilde-elektrik-tuketimi-yuzde-30-geriledi-1-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>birlikte 9 g\u00fcne \u00e7\u0131kmas\u0131 nedeniyle adeta bo\u015fald\u0131. \u0130stanbul\u2019un Avrupa Yakas\u0131\u2019nda 5,3 milyondan fazla aboneye elektrik da\u011f\u0131t\u0131m hizmeti veren Bo\u011fazi\u00e7i Elektrik Da\u011f\u0131t\u0131m A.\u015e.\u2019nin (BEDA\u015e) verilerine g\u00f6re, <strong>24 Haziran-2 Temmuz<\/strong> tarihleri aras\u0131nda Avrupa Yakas\u0131\u2019nda elektrik t\u00fcketimi ge\u00e7en y\u0131l\u0131n ayn\u0131 d\u00f6nemine g\u00f6re<strong> y\u00fczde 30,4<\/strong> gibi olduk\u00e7a y\u00fcksek bir oranda geriledi. Bu d\u00fc\u015f\u00fc\u015fte sanayi ve ticarethanelerin bayram nedeniyle kapal\u0131 olmas\u0131n\u0131n yan\u0131 s\u0131ra \u0130stanbullular\u0131n<strong> 9 g\u00fcnl\u00fck tatili<\/strong> <strong>\u015fehir d\u0131\u015f\u0131nda ge\u00e7irmeyi tercih etmesi<\/strong> etkili oldu.<\/p>\n<h3><strong>27 HAZ\u0130RAN-1 TEMMUZ ARASINDAK\u0130 D\u00dc\u015e\u00dc\u015e Y\u00dcZDE 39\u2019U A\u015eTI<\/strong><\/h3>\n<p>Hizmet verdi\u011fi her noktaya kesintisiz ve kaliteli enerji sunmay\u0131 hedefleyen BEDA\u015e taraf\u0131ndan haz\u0131rlanan <strong>\u201cKurban Bayram\u0131 Avrupa Yakas\u0131\u2019n\u0131n Elektrik T\u00fcketim Analizi\u201d<\/strong>, bayram boyunca kentteki elektrik t\u00fcketiminin b\u00fcy\u00fck oranda d\u00fc\u015ft\u00fc\u011f\u00fcn\u00fc g\u00f6sterdi. 2022 y\u0131l\u0131nda <strong>24 Haziran-2 Temmuz<\/strong> tarihleri aras\u0131nda <strong>Avrupa Yakas\u0131\u2019ndaki<\/strong> toplam elektrik t\u00fcketimi <strong>700 bin 845 MWh<\/strong> d\u00fczeyinde iken, bu y\u0131l Kurban Bayram\u0131\u2019n\u0131n bu tarihler aras\u0131na denk gelmesi ve hafta sonlar\u0131 ile birle\u015fmesinin etkisi ile t\u00fcketim <strong>y\u00fczde 30<\/strong>\u2019luk bir d\u00fc\u015f\u00fc\u015fle <strong>487 bin 270 MWh<\/strong> seviyesinde kald\u0131. Arife g\u00fcn\u00fc de d\u00e2hil 27 Haziran-1 Temmuz tarihleri aras\u0131nda kutlanan Kurban Bayram\u0131 d\u00f6neminde ise elektrik t\u00fcketiminde gerileme ge\u00e7en y\u0131l\u0131n ayn\u0131 g\u00fcnlerine g\u00f6re <strong>y\u00fczde 39<\/strong>\u2019lar\u0131n da \u00fczerinde d\u00fc\u015ferek <strong>410 bin 788 MWh<\/strong>\u2019den <strong>249 bin 494 MWh<\/strong>\u2019lere indi. Tatil s\u00fcresince en b\u00fcy\u00fck d\u00fc\u015f\u00fc\u015f <strong>y\u00fczde 42,8<\/strong> ile<strong> bayram\u0131n ikinci g\u00fcn\u00fc<\/strong> olan <strong>29 Haziran\u2019da<\/strong> ya\u015fand\u0131.<\/p>\n<h3><strong>2022 YILI KURBAN BAYRAMI TAT\u0130L\u0130NE G\u00d6RE DE D\u00dc\u015e\u00dcK KALDI<\/strong><\/h3>\n<p>BEDA\u015e\u2019\u0131n rakamlar\u0131na g\u00f6re, arife g\u00fcne ile birlikte 5 g\u00fcn s\u00fcren Kurban Bayram\u0131\u2019ndaki elektrik t\u00fcketim rakamlar\u0131 ge\u00e7en y\u0131lki Kurban Bayram\u0131\u2019na g\u00f6re de geride kald\u0131. 2022 y\u0131l\u0131nda 8-12 Temmuz aras\u0131na denk gelen 5 g\u00fcnl\u00fck bayram tatilinde Avrupa Yakas\u0131\u2019ndaki elektrik t\u00fcketimi 259 bin 522 MWh seviyesindeydi. Bu y\u0131l bayram g\u00fcnlerinin haziran ay\u0131na rastlamas\u0131 nedeniyle klima kullan\u0131m\u0131n\u0131n s\u0131n\u0131rl\u0131 olmas\u0131 elektrik t\u00fcketimine de yans\u0131d\u0131. \u0130ki y\u0131l\u0131n bayram t\u00fcketimleri k\u0131yasland\u0131\u011f\u0131nda bu y\u0131l ge\u00e7en y\u0131la g\u00f6re bu bayramda elektrik t\u00fcketimi <strong>y\u00fczde 3,86<\/strong> geriledi.<\/p>\n<h3><strong>BEDA\u015e EK\u0130PLER\u0130 9 G\u00dcN BOYUNCA SAHADA N\u00d6BETTEYD\u0130<\/strong><\/h3>\n<p>BEDA\u015e\u2019tan yap\u0131lan a\u00e7\u0131klamada, <em>\u201c\u015eirket olarak en b\u00fcy\u00fck \u00f6nceli\u011fimiz t\u00fcketicilerimize kesintisiz ve kaliteli hizmet sunmak, enerjinin devaml\u0131l\u0131\u011f\u0131n\u0131 sa\u011flamak. Bu ama\u00e7la ekiplerimiz 7 g\u00fcn 24 saat esas\u0131 ile g\u00f6rev yap\u0131yor. \u0130stanbullular\u0131n enerji kesintisi ya\u015famamas\u0131 i\u00e7in bayram boyunca planl\u0131 kesintilerimizi iptal ederken olas\u0131 kesintilere h\u0131zla yan\u0131t verebilmek i\u00e7in <strong>ar\u0131za onar\u0131m, bak\u0131m ekiplerimizi<\/strong> sahada g\u00f6reve haz\u0131r beklettik. Bu arada t\u00fcketimin artmas\u0131 veya azalmas\u0131 durumlar\u0131na <strong>kar\u015f\u0131 y\u00fck dengeleri<\/strong> ve<strong> puant\u0131 canl\u0131 sistem \u00fczerinden<\/strong> de takibe ald\u0131k. <strong>Kesintilere 1-2 dakika gibi bir s\u00fcrede uzaktan \u00e7\u00f6z\u00fcm \u00fcretmeye<\/strong> imk\u00e2n sa\u011flayan <strong>SCADA sistemimizde de<\/strong> n\u00f6bet\u00e7i ekiplerimiz g\u00f6revlerinin ba\u015f\u0131ndayd\u0131\u201d<\/em> denildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130stanbul\u2019da ya\u015fayanlar 9 g\u00fcnl\u00fck bayram tatilinde memleketlerine ve sahil kentlerine ak\u0131n edince elektrik t\u00fcketimi neredeyse \u00fc\u00e7te bir oran\u0131nda d\u00fc\u015ft\u00fc. \u0130stanbul Avrupa Yakas\u0131\u2019nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":177161,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[14024,1506,45574,15016,130,1967],"views":35,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177157"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=177157"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177157\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/177161"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=177157"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=177157"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=177157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}