{"id":177134,"date":"2023-07-07T16:47:09","date_gmt":"2023-07-07T13:47:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=177134"},"modified":"2023-07-07T16:50:19","modified_gmt":"2023-07-07T13:50:19","slug":"europower-enerji-9-uncu-fabrikasinin-temelini-atti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/europower-enerji-9-uncu-fabrikasinin-temelini-atti\/","title":{"rendered":"(Turkish) &#8217;Europower Enerji&#8217; 9\u2019uncu Fabrikas\u0131n\u0131n Temelini Att\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/177134\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Giri\u015fim Elektrik A.\u015e.\u2019nin ba\u011fl\u0131 ortakl\u0131\u011f\u0131 olan ve 8 fabrikas\u0131 ile elektrik ekipmanlar\u0131 ve sistemlerini 420kV\u2019a kadar her gerilim seviyesinde \u00fcreten, bunun yan\u0131nda d\u00fcnya \u00e7ap\u0131nda proje tasar\u0131m\u0131, proje y\u00f6netimi, otomasyon &amp; SCADA, i\u015fletmeye alma, denetim, saha testleri ve e\u011fitim hizmetleri gibi geni\u015f bir yelpazede m\u00fchendislik hizmetleri sunan global oyuncu Europower Enerji, 9\u2019uncu fabrikas\u0131 olan g\u00fc\u00e7 trafosu fabrikas\u0131 ile y\u00fcksek gerilim laboratuvar\u0131n\u0131n temel atma t\u00f6renini ger\u00e7ekle\u015ftirdi.<\/h2>\n<p>T\u00f6rene, E<em>uropower Enerji A.\u015e. Y\u00f6netim Kurulu Ba\u015fkan\u0131 M. Behi\u00e7 Harmanl\u0131, Ba\u015fkan Yard\u0131mc\u0131s\u0131 Ali G\u00f6khan \u00d6zt\u00fcrk, Y\u00f6netim Kurulu \u00dcyesi ve Genel M\u00fcd\u00fcr\u00fc Ramin Malek, \u015eirket Orta\u011f\u0131 Mesut Baz ve Europower Enerji A.\u015e. Operasyon Ba\u015fkan\u0131 A. Beril Harmanl\u0131\u2019n\u0131n yan\u0131 s\u0131ra Kahramankazan Belediye Ba\u015fkan Yard\u0131mc\u0131s\u0131 Mahmut Uzun, Giri\u015fim Elektrik A.\u015e. ile Europower Enerji borsa yat\u0131r\u0131mc\u0131lar\u0131<\/em> ve <em>\u015firketin \u00fcst d\u00fczey \u00e7al\u0131\u015fanlar\u0131<\/em> kat\u0131l\u0131m g\u00f6sterdi.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-177136\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/Behic_Harmanli.jpg\" alt=\"\" width=\"320\" height=\"251\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/Behic_Harmanli.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/Behic_Harmanli-300x235.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/Behic_Harmanli-500x392.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/Behic_Harmanli-64x50.jpg 64w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Europower Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 M. Behi\u00e7 Harmanl\u0131<\/strong>, t\u00f6ren \u00f6ncesi yapt\u0131\u011f\u0131 konu\u015fmada fabrika hakk\u0131nda bilgiler verdi. <strong>2025 y\u0131l\u0131n\u0131n ilk yar\u0131s\u0131nda \u00fcretime<\/strong> ve<strong> test yap\u0131m\u0131na<\/strong> ba\u015flayacaklar\u0131n\u0131 belirten Harmanl\u0131, \u015funlar\u0131 s\u00f6yledi:<\/p>\n<p><em>\u201cD\u00fcnyada <strong>\u00e7ok ciddi g\u00fc\u00e7 trafosuna<\/strong> ihtiya\u00e7 var. <strong>Da\u011f\u0131t\u0131m trafosu<\/strong> ve<strong> g\u00fc\u00e7 trafosu<\/strong> olarak T\u00fcrkiye, ba\u015fta Avrupa olmak \u00fczere <strong>Afrika, Rusya, Ukrayna<\/strong> dahil d\u00fcnyan\u0131n lideri durumunda. S\u0131n\u0131rs\u0131z bir taleple kar\u015f\u0131 kar\u015f\u0131yay\u0131z. Enerji sekt\u00f6r\u00fcnde <strong>tek \u00fcretmedi\u011fimiz kalem<\/strong> <strong>g\u00fc\u00e7 trafosuydu<\/strong>. Bu fabrika ile birlikte <strong>hem al\u00e7ak gerilimde<\/strong>,<strong> hem de orta ve y\u00fcksek gerilimde<\/strong> her voltajda ve her megavatta m\u00fc\u015fterilerin talebini kar\u015f\u0131layabilecek yegane firma olaca\u011f\u0131z.<\/em><\/p>\n<p><em>\u015eu an mevcut olan tesisimizde <strong>20 MBA<\/strong>\u2019ya<strong> kadar trafo \u00fcretebiliyoruz.<\/strong> Bug\u00fcn temel atma t\u00f6renini ger\u00e7ekle\u015ftirece\u011fimiz tesisimizde ise<strong> 550Kv<\/strong> ve<strong> 330 MVA<\/strong> g\u00fcce kadar <strong>Y\u00fcksek Gerilim g\u00fc\u00e7 trafosu<\/strong> imalat\u0131 yapaca\u011f\u0131z. \u00d6rne\u011fin T\u00fcrkiye\u2019de maksimum <strong>380 \u2013 420Kv<\/strong> ve <strong>250 MBA\u2019dan<\/strong> b\u00fcy\u00fck trafo genelde kullan\u0131lm\u0131yor. Yani bu tesiste T\u00fcrkiye\u2019nin yan\u0131 s\u0131ra ba\u015fka \u00fclkelerin de ihtiyac\u0131n\u0131 kar\u015f\u0131layabilecek g\u00fcce sahip g\u00fc\u00e7 trafolar\u0131 \u00fcretebilece\u011fiz.\u201d<\/em><\/p>\n<p><strong>Tesiste yer alacak olan y\u00fcksek gerilim laboratuvar\u0131ndan da<\/strong> bahseden <strong>Harmanl\u0131<\/strong>, <em>\u201cTesiste <strong>ARGE\/\u00dcRGE \u00e7al\u0131\u015fmalar\u0131nda da<\/strong> kullan\u0131labilecek T\u00fcrkiye&#8217;nin konusunda \u00f6nde gelen test merkezlerinden biri olacak <strong>Akredite YG Ekipmanlar\u0131 Test Laboratuvar\u0131<\/strong> bulunacak. Ayn\u0131 anda <strong>iki trafoyu test edebilecek<\/strong> bir alan olacak. Bu laboratuvar\u0131n y\u00fcksekli\u011fi <strong>22 m<\/strong> olacak. \u00c7\u00fcnk\u00fc <strong>550Kv\u2019luk<\/strong> bir trafonun <strong>y\u0131ld\u0131r\u0131m testini yapmak<\/strong> i\u00e7in <strong>1 milyon 850 bin watt \u00fcretmek gerekiyor<\/strong>\u201d<\/em> diye konu\u015ftu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Giri\u015fim Elektrik A.\u015e.\u2019nin ba\u011fl\u0131 ortakl\u0131\u011f\u0131 olan ve 8 fabrikas\u0131 ile elektrik ekipmanlar\u0131 ve sistemlerini 420kV\u2019a kadar her gerilim seviyesinde \u00fcreten, bunun yan\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":177137,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[15096,2873,26775,106550,89471,110011,110012,42392],"views":44,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177134"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=177134"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177134\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/177137"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=177134"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=177134"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=177134"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}