{"id":17710,"date":"2013-11-17T17:42:23","date_gmt":"2013-11-17T14:42:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=17710"},"modified":"2013-11-17T17:42:23","modified_gmt":"2013-11-17T14:42:23","slug":"atasu-baraji-ve-hidrolik-santrali-devreye-girdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/atasu-baraji-ve-hidrolik-santrali-devreye-girdi\/","title":{"rendered":"(Turkish) Atasu Baraj\u0131 ve Hidrolik Santrali Devreye Girdi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/17710\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Trabzon\u2019da 5 Mw kurulu <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/atasu-baraji-ve-hidroelektrik-santrali-devreye-gird.jpg\"><img loading=\"lazy\" class=\"size-medium wp-image-17711 alignright\" title=\"atasu-baraji-ve-hidroelektrik-santrali-devreye-gird\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/atasu-baraji-ve-hidroelektrik-santrali-devreye-gird-300x199.jpg\" alt=\"\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/atasu-baraji-ve-hidroelektrik-santrali-devreye-gird-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/atasu-baraji-ve-hidroelektrik-santrali-devreye-gird-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/atasu-baraji-ve-hidroelektrik-santrali-devreye-gird-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/atasu-baraji-ve-hidroelektrik-santrali-devreye-gird.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>g\u00fcce sahip Atasu Baraj\u0131 ve HES\u2019in DS\u0130 taraf\u0131ndan kesin kabul\u00fc yap\u0131ld\u0131.<\/strong><\/p>\n<p>DS\u0130\u2019den yap\u0131lan a\u00e7\u0131klamada, Trabzon \u0130line y\u0131lda 91,25 hm3 i\u00e7me kullanma ve End\u00fcstri suyu verecek olan ve ayr\u0131ca 5 mw kurulu g\u00fcc\u00fc ile y\u0131lda 27,14 Gwh enerji \u00fcretimini sa\u011flayacak olan Atasu Baraj\u0131 ve HES in\u015faat\u0131\u2019n\u0131n 14.11.2013 tarihinde Barajlar ve HES Dairesi Ba\u015fkanl\u0131\u011f\u0131 personeli, DS\u0130 22.B\u00f6lge M\u00fcd\u00fcrl\u00fc\u011f\u00fc personeli ye y\u00fcklenici firma yetkililerinin kat\u0131l\u0131m\u0131yla kesin kabul i\u015flemi ger\u00e7ekle\u015ftirildi.<\/p>\n<p>Cengiz \u0130n\u015faat san. Ve tic. A.\u015e. y\u00fckleminde yap\u0131m\u0131 tamamlanan projenin maliyeti 2013 fiyatlar\u0131yla kamula\u015ft\u0131rma dahil 400 milyon TL olarak ger\u00e7ekle\u015ftirildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/11\/16\/atasu-baraji-ve-hidroelektrik-santrali-devreye-girdi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Trabzon\u2019da 5 Mw kurulu g\u00fcce sahip Atasu Baraj\u0131 ve HES\u2019in DS\u0130 taraf\u0131ndan kesin kabul\u00fc yap\u0131ld\u0131. DS\u0130\u2019den yap\u0131lan a\u00e7\u0131klamada, Trabzon \u0130line y\u0131lda 91,25 hm3 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":17711,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[10402,63,67,1009,165,35370,1090,4000],"views":1372,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17710"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=17710"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17710\/revisions"}],"predecessor-version":[{"id":17712,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17710\/revisions\/17712"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/17711"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=17710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=17710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=17710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}