{"id":177056,"date":"2023-07-06T14:07:35","date_gmt":"2023-07-06T11:07:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=177056"},"modified":"2023-07-06T14:07:56","modified_gmt":"2023-07-06T11:07:56","slug":"paks-ii-ngs-nin-yeni-guc-uniteleri-nin-insaatinda-ilk-asamaya-baslandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/paks-ii-ngs-nin-yeni-guc-uniteleri-nin-insaatinda-ilk-asamaya-baslandi\/","title":{"rendered":"(Turkish) &#8217;Paks II NGS&#8217;nin Yeni G\u00fc\u00e7 \u00dcnitelerinin \u0130n\u015faat\u0131nda \u0130lk A\u015famaya Ba\u015fland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/177056\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Genel y\u00fcklenicili\u011fini Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom\u2019un M\u00fchendislik Birimi ASE A.\u015e\u2019nin yapt\u0131\u011f\u0131 Macaristan\u2019daki Paks II N\u00fckleer G\u00fc\u00e7 Santrali\u2019nde (NGS) \u00a0yeni \u00fcnitelerin in\u015faat\u0131n\u0131n ilk a\u015famas\u0131na ba\u015fland\u0131.<\/h2>\n<p><strong>Su izolasyonu<\/strong> olan ilk a\u015fama, <strong>Macaristan Atom Enerjisi Kurumu (HAEA)<\/strong> taraf\u0131ndan verilen lisanslara s\u0131k\u0131 s\u0131k\u0131ya ba\u011fl\u0131 kal\u0131narak y\u00fcr\u00fct\u00fcl\u00fcyor. <strong>Su izolasyonu<\/strong> ve<strong> toprak stabilizasyonunun<\/strong> ard\u0131ndan, <strong>kaz\u0131 <img loading=\"lazy\" class=\"alignright wp-image-177059\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/paks-ii-ngs-nin-yeni-guc-uniteleri-nin-insaatinda-ilk-asamaya-baslandi-2.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/paks-ii-ngs-nin-yeni-guc-uniteleri-nin-insaatinda-ilk-asamaya-baslandi-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/paks-ii-ngs-nin-yeni-guc-uniteleri-nin-insaatinda-ilk-asamaya-baslandi-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/paks-ii-ngs-nin-yeni-guc-uniteleri-nin-insaatinda-ilk-asamaya-baslandi-2-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/paks-ii-ngs-nin-yeni-guc-uniteleri-nin-insaatinda-ilk-asamaya-baslandi-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/07\/paks-ii-ngs-nin-yeni-guc-uniteleri-nin-insaatinda-ilk-asamaya-baslandi-2-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u00e7al\u0131\u015fmalar\u0131<\/strong> ve <strong>temel d\u00f6\u015femenin in\u015fas\u0131<\/strong> i\u00e7in haz\u0131rl\u0131klar ba\u015flayacak.<\/p>\n<p>Sovyet tasar\u0131m\u0131na g\u00f6re in\u015fa edilen <strong>Paks NGS<\/strong>&#8216;de halihaz\u0131rda <strong>VVER-440 tipi reakt\u00f6rlere<\/strong> sahip d\u00f6rt g\u00fc\u00e7 \u00fcnitesi faaliyet g\u00f6steriyor. Santral, Macaristan&#8217;da elektri\u011fin <strong>%50<\/strong>&#8216;sinden fazlas\u0131n\u0131 \u00fcretiyor. <strong>Paks II NGS projesi<\/strong>, 14 Ocak 2014 tarihinde imzalanan <strong>Rus-Macar h\u00fck\u00fcmetler aras\u0131 anla\u015fmas\u0131<\/strong> ve<strong> yeni NGS<\/strong>&#8216;nin in\u015fas\u0131na y\u00f6nelik<strong> \u00fc\u00e7 temel s\u00f6zle\u015fme uyar\u0131nca<\/strong> hayata ge\u00e7iriliyor.<\/p>\n<p><strong>Paks II NGS&#8217;nin in\u015fas\u0131<\/strong> i\u00e7in ana lisans Macar d\u00fczenleyici kurum taraf\u0131ndan A\u011fustos 2022&#8217;de verildi. <strong>\u0130ki VVER-1200 3+ nesil reakt\u00f6re<\/strong> sahip <strong>Paks II NGS<\/strong> anahtar teslimi olarak in\u015fa edilecek. Bu tip reakt\u00f6re sahip bir g\u00fc\u00e7 \u00fcnitesine Avrupa Birli\u011fi&#8217;nde ilk kez in\u015faat ruhsat\u0131 verildi. \u0130n\u015faat lisans\u0131n\u0131n al\u0131nmas\u0131, yeni \u00fcnitelerin <strong>Macaristan<\/strong> ve <strong>Avrupa g\u00fcvenlik standartlar\u0131na uygun<\/strong> <strong>oldu\u011funu<\/strong> teyit ediyor. <strong>Paks II NGS<\/strong>&#8216;nin <strong>5\u2019inci<\/strong> ve <strong>6\u2019nc\u0131<\/strong> g\u00fc\u00e7 \u00fcniteleri <strong>60 y\u0131ll\u0131k kullan\u0131m \u00f6mr\u00fcne sahip.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Genel y\u00fcklenicili\u011fini Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom\u2019un M\u00fchendislik Birimi ASE A.\u015e\u2019nin yapt\u0131\u011f\u0131 Macaristan\u2019daki Paks II N\u00fckleer G\u00fc\u00e7 Santrali\u2019nde (NGS) \u00a0yeni \u00fcnitelerin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":177058,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[99606,6666,109993,105587,109992,2587],"views":52,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177056"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=177056"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/177056\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/177058"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=177056"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=177056"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=177056"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}