{"id":176085,"date":"2023-06-09T12:52:35","date_gmt":"2023-06-09T09:52:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=176085"},"modified":"2023-06-09T12:55:05","modified_gmt":"2023-06-09T09:55:05","slug":"alfa-solar-romanyada-gunes-paneli-uretimi-icin-sirket-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/alfa-solar-romanyada-gunes-paneli-uretimi-icin-sirket-kuracak\/","title":{"rendered":"(Turkish) &#8217;Alfa Solar&#8217; Romanya\u2019da G\u00fcne\u015f Paneli \u00dcretimi \u0130\u00e7in \u015eirket Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/176085\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Alfa Solar Enerji, Romanya\u2019da yerle\u015fik ve g\u00fcne\u015f paneli \u00fcretimi sekt\u00f6r\u00fcnde, ilk etapta 300 MWp\/y\u0131l \u00fcretim kapasitesiyle olmak \u00fczere, faaliyet g\u00f6sterecek olan bir t\u00fczel ki\u015filik kurulmas\u0131na ve Romanya\u2019da yerle\u015fik bu t\u00fczel ki\u015fili\u011fe %50 oran\u0131nda i\u015ftirak edilmesine karar verdi.<\/strong><\/h2>\n<p>&nbsp;<\/p>\n<h3><strong>KAP\u2019a yap\u0131lan a\u00e7\u0131klamada \u015f\u00f6yle denildi:<\/strong><\/h3>\n<p><em>\u201c\u015eirketimizin \u00fcretim faaliyetlerinin ve \u00fcretim kapasitesinin d\u00fczenli olarak artt\u0131r\u0131lmas\u0131 amac\u0131 ile, (a) Avrupa Birli\u011fi pazar\u0131n\u0131 hedefleyen, (b) Romanya\u2019da yerle\u015fik ve (c) g\u00fcne\u015f paneli \u00fcretimi sekt\u00f6r\u00fcnde, ilk etapta 300 MWp\/y\u0131l \u00fcretim kapasitesiyle olmak \u00fczere, faaliyet g\u00f6sterecek olan bir t\u00fczel ki\u015filik <img loading=\"lazy\" class=\"alignright wp-image-176089\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/06\/alfa-solar-romanyada-gunes-paneli-uretimi-icin-sirket-kuracak.jpeg\" alt=\"\" width=\"320\" height=\"229\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/06\/alfa-solar-romanyada-gunes-paneli-uretimi-icin-sirket-kuracak.jpeg 440w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/06\/alfa-solar-romanyada-gunes-paneli-uretimi-icin-sirket-kuracak-300x215.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/06\/alfa-solar-romanyada-gunes-paneli-uretimi-icin-sirket-kuracak-70x50.jpeg 70w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kurulmas\u0131na ve Romanya\u2019da yerle\u015fik bu t\u00fczel ki\u015fili\u011fe \u015firketimiz taraf\u0131ndan %50 oran\u0131nda i\u015ftirak edilmesine,<\/em><\/p>\n<p><em>\u015eirketimiz taraf\u0131ndan, %50 oran\u0131nda i\u015ftirak edilmesi planlanan s\u00f6z konusu t\u00fczel ki\u015fili\u011fin kurulu\u015fu i\u00e7in, \u015firketimiz taraf\u0131ndan yakla\u015f\u0131k 1 milyon Euro fon ayr\u0131lmas\u0131na ve kalan %50 oran\u0131ndaki ortakl\u0131k pay\u0131 i\u00e7in Romanya\u2019da yerle\u015fik potansiyel ortaklarla g\u00f6r\u00fc\u015fmelere ba\u015flanmas\u0131na,<\/em><\/p>\n<p><em>Kurulmas\u0131 planlanan t\u00fczel ki\u015fili\u011fe ili\u015fkin Romanya\u2019da ger\u00e7ekle\u015ftirilecek t\u00fcm faaliyetler i\u00e7in H\u00fcseyin Mertcan Karaba\u015f, Furkan Karaba\u015f ve Veysel Karaba\u015f\u2019tan her birinin ayr\u0131 ayr\u0131 \u015firketimiz ad\u0131na m\u00fcnferiden yetkilendirilmesine,<\/em><\/p>\n<p><em>\u015eirketimizin Ankara merkezli olan Enerji Depolama Sistemleri Derne\u011fi isimli (K\u0131sa ad\u0131 \u201cEDS\u0130S\u201d) Derne\u011fe \u00fcye olmas\u0131na ve \u015eirketimizi Enerji Depolama Sistemleri Derne\u011fi nezdinde temsil ve ilzam etme, Dernek T\u00fcz\u00fc\u011f\u00fc uyar\u0131nca Dernek taraf\u0131ndan yap\u0131lacak t\u00fcm faaliyet, i\u015f ve i\u015flemlere \u015firketimiz ad\u0131na kat\u0131lma ve derne\u011fin yetkili organlar\u0131nda ve \u00e7al\u0131\u015fmalar\u0131nda \u015eirketimizi temsil ve ilzam etme, oy kullanma yetkisinin tan\u0131nmas\u0131na, \u015eirketimiz Y\u00f6netim Kurulu Ba\u015fkan Vekili ve CEO H\u00fcseyin Mertcan KARABA\u015e\u2019\u0131n asil \u00fcye olarak, \u015eirketimiz Y\u00f6netim Kurulu \u00dcyesi ve CFO Furkan KARABA\u015e\u2019\u0131n yedek \u00fcye olarak \u201cTemsilci\u201d s\u0131fat\u0131yla \u015eirketimiz t\u00fczel ki\u015fili\u011fi ad\u0131na yetkilendirilmelerine, karar verilmi\u015ftir.\u201d<\/em><\/p>\n<p>Kaynak: Foreks<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Alfa Solar Enerji, Romanya\u2019da yerle\u015fik ve g\u00fcne\u015f paneli \u00fcretimi sekt\u00f6r\u00fcnde, ilk etapta 300 MWp\/y\u0131l \u00fcretim kapasitesiyle olmak \u00fczere, faaliyet g\u00f6sterecek olan bir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":176089,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[105981,2206,8255,6665],"views":109,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/176085"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=176085"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/176085\/revisions"}],"predecessor-version":[{"id":176086,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/176085\/revisions\/176086"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/176089"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=176085"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=176085"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=176085"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}