{"id":176036,"date":"2023-06-08T13:25:02","date_gmt":"2023-06-08T10:25:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=176036"},"modified":"2023-06-08T13:26:00","modified_gmt":"2023-06-08T10:26:00","slug":"ruppur-ngs-nin-1inci-unitesine-karotiyer-yerlestirildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruppur-ngs-nin-1inci-unitesine-karotiyer-yerlestirildi\/","title":{"rendered":"(Turkish) &#8217;Ruppur NGS&#8217;nin 1\u2019inci \u00dcnitesi\u2019ne Karotiyer Yerle\u015ftirildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/176036\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom\u2019un genel tasar\u0131mc\u0131l\u0131\u011f\u0131n\u0131 ve genel y\u00fcklenicili\u011fini \u00fcstlendi\u011fi Banglade\u015f\u2019teki Ruppur N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin in\u015faat sahas\u0131nda 1\u2019inci \u00dcnite\u2019nin karotiyer montaj\u0131 \u00e7al\u0131\u015fmalar\u0131 tamamland\u0131.<\/h2>\n<p>Reakt\u00f6r\u00fcn i\u00e7 k\u0131sm\u0131n\u0131n ana unsurlar\u0131ndan biri olma \u00f6zelli\u011fi ta\u015f\u0131yan ve paslanmaz \u00e7elik t\u00fcr\u00fc \u00f6stenitten yap\u0131lm\u0131\u015f karotiyerin a\u011f\u0131rl\u0131\u011f\u0131 <strong>73,74 ton<\/strong>, uzunlu\u011fu <strong>10869 mm<\/strong> ve \u00e7ap\u0131 <strong>3610 mm<\/strong>. Karotiyerin i\u00e7inde <img loading=\"lazy\" class=\"alignright wp-image-176038\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/06\/ruppur-ngs-nin-1inci-unitesine-karotiyer-yerlestirildi.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/06\/ruppur-ngs-nin-1inci-unitesine-karotiyer-yerlestirildi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/06\/ruppur-ngs-nin-1inci-unitesine-karotiyer-yerlestirildi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/06\/ruppur-ngs-nin-1inci-unitesine-karotiyer-yerlestirildi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/06\/ruppur-ngs-nin-1inci-unitesine-karotiyer-yerlestirildi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/06\/ruppur-ngs-nin-1inci-unitesine-karotiyer-yerlestirildi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>n\u00fckleer reaksiyona giren bir b\u00f6lme ve yak\u0131t d\u00fczenekleri bulunuyor. Karotiyerin taban\u0131, yak\u0131ta ili\u015fkin maddelerin kaplamalar\u0131n\u0131n so\u011futulmas\u0131 amac\u0131yla so\u011futma s\u0131v\u0131s\u0131n\u0131n dola\u015f\u0131m\u0131n\u0131 sa\u011flamak \u00fczere delikli \u00f6zelli\u011fe sahip.<\/p>\n<p>Ruppur NGS \u0130n\u015faat Projesi\u2019nin Direkt\u00f6r\u00fc Alexey Deriy, konuyla ilgili olarak \u015funlar\u0131 s\u00f6yledi: <em>\u201cKarotiyerin montaj\u0131 Ruppur NGS in\u015faat\u0131nda bir di\u011fer \u00f6nemli a\u015famay\u0131 te\u015fkil ediyor. Bu a\u015fama, reakt\u00f6r montaj\u0131n\u0131n ba\u015flamas\u0131 anlam\u0131na geliyor.\u201d<\/em><\/p>\n<p>Toplam <strong>2400 MW<\/strong> kapasiteli <strong>iki VVER-1200 reakt\u00f6r\u00fc<\/strong> ile donat\u0131lm\u0131\u015f <strong>Ruppur NGS<\/strong>, 25 Aral\u0131k 2015 tarihli Genel S\u00f6zle\u015fme uyar\u0131nca Banglade\u015f&#8217;in ba\u015fkenti Dakka&#8217;ya 160 km uzakl\u0131kta, Rus tasar\u0131m\u0131 ile in\u015fa ediliyor. Banglade\u015f&#8217;in ilk n\u00fckleer santrali Ruppur NGS i\u00e7in Rusya\u2019daki Novovoronej NGS&#8217;nin iki \u00fcnitesinde ba\u015far\u0131yla uygulanm\u0131\u015f olan <strong>VVER-1200 reakt\u00f6rl\u00fc<\/strong> Rus tasar\u0131m\u0131 se\u00e7ildi. Bu reakt\u00f6r, t\u00fcm uluslararas\u0131 g\u00fcvenlik gerekliliklerini tam olarak yerine getiren modern bir <strong>3+ Nesil tasar\u0131m<\/strong> olma \u00f6zelli\u011fi ta\u015f\u0131yor.<\/p>\n<p>Rusya, dost \u00fclkelerle i\u015f birli\u011fine \u00f6nem vererek <strong>uluslararas\u0131 ticari<\/strong> ve <strong>ekonomik ili\u015fkilerini<\/strong> s\u00fcrekli olarak geli\u015ftiriyor. D\u0131\u015f k\u0131s\u0131tlamalara ra\u011fmen \u00fclke ekonomisi ihracat potansiyelini art\u0131r\u0131yor, d\u00fcnyan\u0131n d\u00f6rt bir yan\u0131na \u00fcr\u00fcn, hizmet ve hammadde g\u00f6nderiyor. Enerji sekt\u00f6r\u00fcnde b\u00fcy\u00fck uluslararas\u0131 projelerin hayata ge\u00e7irilmesi de devam ediyor. Rosatom ve i\u015fletmeleri bu \u00e7al\u0131\u015fmalarda aktif rol al\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom\u2019un genel tasar\u0131mc\u0131l\u0131\u011f\u0131n\u0131 ve genel y\u00fcklenicili\u011fini \u00fcstlendi\u011fi Banglade\u015f\u2019teki Ruppur N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin in\u015faat sahas\u0131nda 1\u2019inci \u00dcnite\u2019nin karotiyer [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":176038,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[19356,108217,109692],"views":28,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/176036"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=176036"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/176036\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/176038"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=176036"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=176036"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=176036"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}