{"id":174995,"date":"2023-05-18T14:28:40","date_gmt":"2023-05-18T11:28:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=174995"},"modified":"2023-05-18T14:37:00","modified_gmt":"2023-05-18T11:37:00","slug":"turk-telekom-3-sehirde-gunes-santrali-kuruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turk-telekom-3-sehirde-gunes-santrali-kuruyor\/","title":{"rendered":"(Turkish) &#8217;T\u00fcrk Telekom&#8217; 3 \u015eehirde G\u00fcne\u015f Santrali Kuruyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/174995\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrk Telekom, G\u00fc\u00adne\u015f Enerjisi Santra\u00adli (GES) kurulum \u00e7al\u0131\u015fma\u00adlar\u0131n\u0131 h\u0131zland\u0131rmaya karar verdi.<\/h2>\n<p><img loading=\"lazy\" class=\"alignright wp-image-174997\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/turk-telekom-3-sehirde-gunes-santrali-kuruyor.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/turk-telekom-3-sehirde-gunes-santrali-kuruyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/turk-telekom-3-sehirde-gunes-santrali-kuruyor-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/turk-telekom-3-sehirde-gunes-santrali-kuruyor-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/turk-telekom-3-sehirde-gunes-santrali-kuruyor-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>T\u00fcrkiye Elektrik \u0130le\u00adtim A.\u015e. (TE\u0130A\u015e), Elekt\u00adrik Piyasas\u0131nda Lisanss\u0131z Elektrik \u00dcretimi Y\u00f6netme\u00adli\u011fi \u00e7er\u00e7evesinde tahsis edi\u00adlen <strong>317,8 MWe<\/strong> g\u00fc\u00e7 kapasi\u00adtesi i\u00e7in <strong>Diyarbak\u0131r, A\u011fr\u0131 ve Sivas\u2019ta<\/strong> g\u00fcne\u015f enerjisi santralleri kurulacak. Tah\u00adsis edilen kapasite, <strong>T\u00fcrk Te\u00adlekom Grubu \u015firketlerinin y\u0131ll\u0131k kullan\u0131m\u0131n\u0131n yar\u0131s\u0131na<\/strong> kar\u015f\u0131l\u0131k geliyor.<\/p>\n<p>T\u00fcrk Telekom a\u00e7\u0131klama\u00ads\u0131nda, <em>\u201cGES yat\u0131r\u0131mlar\u0131n\u0131n T.C. \u00c7evre, \u015eehircilik ve \u0130k\u00adlim De\u011fi\u015fikli\u011fi Bakanl\u0131\u011f\u0131 Milli Emlak Genel M\u00fcd\u00fcr\u00adl\u00fc\u011f\u00fc\u2019nden <strong>29 y\u0131ll\u0131\u011f\u0131na kira\u00adlanacak araziler<\/strong> \u00fczerinde; <strong>Diyarbak\u0131r, A\u011fr\u0131 ve Sivas<\/strong> lo\u00adkasyonlar\u0131nda ger\u00e7ekle\u015fti\u00adrilmesi planlanmaktad\u0131r\u201d<\/em> denildi. <strong>T\u00fcrk Telekom Gru\u00adbu<\/strong>, bu at\u0131l\u0131m\u0131n s\u00fcrd\u00fcr\u00fcle\u00adbilirlik hedeflerini ger\u00e7ek\u00adle\u015ftirme y\u00f6n\u00fcnde \u00f6nem\u00adli ilerleme kaydedece\u011fine inan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrk Telekom, G\u00fc\u00adne\u015f Enerjisi Santra\u00adli (GES) kurulum \u00e7al\u0131\u015fma\u00adlar\u0131n\u0131 h\u0131zland\u0131rmaya karar verdi. T\u00fcrkiye Elektrik \u0130le\u00adtim A.\u015e. (TE\u0130A\u015e), Elekt\u00adrik Piyasas\u0131nda Lisanss\u0131z Elektrik \u00dcretimi Y\u00f6netme\u00adli\u011fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":174997,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,52],"tags":[24571,45418,2401,109401],"views":56,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/174995"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=174995"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/174995\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/174997"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=174995"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=174995"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=174995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}