{"id":174869,"date":"2023-05-16T16:32:01","date_gmt":"2023-05-16T13:32:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=174869"},"modified":"2023-05-16T16:32:17","modified_gmt":"2023-05-16T13:32:17","slug":"su-ihtiyacini-gunesten-urettigi-enerji-ile-karsiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/su-ihtiyacini-gunesten-urettigi-enerji-ile-karsiliyor\/","title":{"rendered":"(Turkish) Su \u0130htiyac\u0131n\u0131 G\u00fcne\u015ften \u00dcretti\u011fi Enerji ile Kar\u015f\u0131l\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/174869\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2 class=\"summary\">Malatya\u2019n\u0131n Ak\u00e7ada\u011f il\u00e7esinde ya\u015fayan kay\u0131s\u0131 \u00fcreticisi 57 ya\u015f\u0131ndaki Yusuf Ziya \u015eahin tar\u0131m arazilerinin su ihtiyac\u0131n\u0131 \u00fc\u00e7 y\u0131l \u00f6nce kurdu\u011fu g\u00fcne\u015f panelleri yard\u0131m\u0131yla \u00fcretti\u011fi elektrik enerjisi ile kar\u015f\u0131l\u0131yor.<\/h2>\n<p>Artan enerji maliyetleri vatanda\u015flar\u0131 alternatif aray\u0131\u015flara y\u00f6neltirken, g\u00fcne\u015f panellerine ilgi ise her ge\u00e7en g\u00fcn art\u0131yor. Ak\u00e7ada\u011f il\u00e7esine ba\u011fl\u0131 Ayd\u0131nlar Mahallesi&#8217;nde yakla\u015f\u0131k 40 y\u0131ld\u0131r \u00e7ift\u00e7ilik yapan Yusuf Ziya \u015eahin tar\u0131m arazilerinin su ihtiyac\u0131n\u0131 artan enerji maliyetleri nedeniyle <strong>alternatif aray\u0131\u015flar\u0131na<\/strong> girdi. Bu d\u00f6nemde gitti\u011fi bir fuarda <strong>g\u00fcne\u015ften enerji \u00fcretimini<\/strong> sa\u011flayan sistemi g\u00f6ren 57 ya\u015f\u0131ndaki \u00e7ift\u00e7i \u015eahin, benzer sistemi kay\u0131s\u0131 bah\u00e7esine kurdu. G\u00fcne\u015f panellerinden saatte yakla\u015f\u0131k <strong>11.5 kilovat enerji <img loading=\"lazy\" class=\"alignright wp-image-174872\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/su-ihtiyacini-gunesten-urettigi-enerji-ile-karsiliyor-1.jpg\" alt=\"\" width=\"320\" height=\"226\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/su-ihtiyacini-gunesten-urettigi-enerji-ile-karsiliyor-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/su-ihtiyacini-gunesten-urettigi-enerji-ile-karsiliyor-1-300x212.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/su-ihtiyacini-gunesten-urettigi-enerji-ile-karsiliyor-1-500x353.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/su-ihtiyacini-gunesten-urettigi-enerji-ile-karsiliyor-1-71x50.jpg 71w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><strong>\u00fcreten<\/strong> \u015eahin, yakla\u015f\u0131k <strong>150 d\u00f6n\u00fcme<\/strong> kadar bir alan\u0131 <strong>\u00fcretti\u011fi elektrik enerjisi ile sulayabiliyor.<\/strong><\/p>\n<h3><strong>\u201c150 d\u00f6n\u00fcml\u00fck bir alanda sulama yapabiliyoruz\u201d<\/strong><\/h3>\n<p>Daha \u00f6nce tar\u0131m arazilerinin su ihtiyac\u0131n\u0131 <strong>kuyularda elde etikleri su ile kar\u015f\u0131lad\u0131klar\u0131n\u0131<\/strong> kaydeden Yusuf Ziya \u015eahin,<em>&#8220;Ayd\u0131nlar Mahallesinde kay\u0131s\u0131 \u00e7iftli\u011fimiz var. Kay\u0131s\u0131 a\u011fa\u00e7lar\u0131 bilindi\u011fi gibi \u00e7ok su isteyen bir a\u011fa\u00e7 t\u00fcr\u00fcd\u00fcr. Bundan dolay\u0131 F\u0131rat EDA\u015e&#8217;tan elektrik alarak sondajlarla a\u011fa\u00e7lar\u0131m\u0131z\u0131n su ihtiyac\u0131n\u0131 kar\u015f\u0131l\u0131yorduk. G\u00fcne\u015f enerji sistemleri g\u00fcndeme gelince bizde ara\u015ft\u0131rmalar\u0131m\u0131z\u0131 yapt\u0131k sistemi kuranlarla g\u00f6r\u00fc\u015ft\u00fck fuarlara gittik ve <strong>sistemin tar\u0131msal sulamada verimli oldu\u011funu<\/strong> g\u00f6rd\u00fck&#8221;<\/em> dedi.<\/p>\n<p>Kay\u0131s\u0131 bah\u00e7esine kurdu\u011fu panellerden <strong>saatte 11,5 kilovat enerji<\/strong> elde ettiklerini ifade eden \u015eahin, &#8220;G\u00fcne\u015f panellerini \u00fc\u00e7 y\u0131l \u00f6nce \u00e7iftli\u011fimize kurduk. Saatte <strong>11,5 kilovat<\/strong> enerji \u00fcretimi ile yakla\u015f\u0131k <strong>100 a\u011fac\u0131n su ihtiyac\u0131<\/strong> kar\u015f\u0131lanmakta. G\u00fcnl\u00fck olarak <strong>150 d\u00f6n\u00fcml\u00fck bir alanda<\/strong> sulama yapabiliyoruz tabi bu g\u00fcne\u015fin durumuna g\u00f6re de\u011fi\u015febiliyor. B\u00f6lgemizdeki kay\u0131s\u0131 \u00fcreticilerine sistemi \u00f6neriyoruz gelsinler sistemi g\u00f6rs\u00fcnler hem<strong> damlama<\/strong> hem de <strong>ya\u011fmurlama sulama<\/strong> da <strong>verimli bir sistem<\/strong>. Arpa ve bu\u011fday sulamas\u0131nda verimli oluyor yakla\u015f\u0131k <strong>30 d\u00f6n\u00fcml\u00fck<\/strong> bir arazide <strong>arpa<\/strong> ve<strong> bu\u011fday sulamas\u0131<\/strong> yap\u0131yoruz. Elektrik \u015firketine <strong>ayl\u0131k 4-5 bin TL<\/strong> para \u00f6d\u00fcyorduk art\u0131k bu <strong>para cebimizde kal\u0131yor<\/strong> ve <strong>sistem 6-7 y\u0131lda<\/strong> kendini amorti ediyor\u201c diye konu\u015ftu.<\/p>\n<p>Kaynak: <a href=\"https:\/\/www.iha.com.tr\/haber-is-yerinin-ortasindan-gecen-agac-dikkat-cekiyor-1170687\/\" target=\"_blank\" rel=\"noopener\">\u0130HA<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Malatya\u2019n\u0131n Ak\u00e7ada\u011f il\u00e7esinde ya\u015fayan kay\u0131s\u0131 \u00fcreticisi 57 ya\u015f\u0131ndaki Yusuf Ziya \u015eahin tar\u0131m arazilerinin su ihtiyac\u0131n\u0131 \u00fc\u00e7 y\u0131l \u00f6nce kurdu\u011fu g\u00fcne\u015f panelleri yard\u0131m\u0131yla [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":174871,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[18,25483,13,109377,109378,22953,842,105],"views":51,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/174869"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=174869"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/174869\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/174871"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=174869"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=174869"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=174869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}