{"id":174176,"date":"2023-05-05T12:24:55","date_gmt":"2023-05-05T09:24:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=174176"},"modified":"2023-05-05T12:25:57","modified_gmt":"2023-05-05T09:25:57","slug":"24-mwe-jeotermal-enerji-santrali-icin-anlasma-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/24-mwe-jeotermal-enerji-santrali-icin-anlasma-yapildi\/","title":{"rendered":"(Turkish) 24 MWe &#8216;Jeotermal Enerji Santrali&#8217; \u0130\u00e7in Anla\u015fma Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/174176\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>K\u00fcresel temiz enerji teknolojisi sa\u011flay\u0131c\u0131s\u0131 ve yeni nesil jeotermal ORC elektrik santrallerinde lider olan <strong>EXERGY INTERNATIONAL<\/strong>, Ayd\u0131n\u2019da kurulacak olan <strong>24 MWe <\/strong>g\u00fcc\u00fcnde <strong>HEZ Moral\u0131 JES-1 <\/strong>santrali i\u00e7in <strong>HEZ ENERJ\u0130<\/strong> ile anla\u015fma imzalad\u0131. ORC santralinin 2024&#8217;\u00fcn 2. \u00e7eyre\u011fine kadar teslim edilmesi ve 2024&#8217;\u00fcn sonundan \u00f6nce devreye al\u0131nmas\u0131 planlan\u0131yor.<\/h2>\n<p><strong>HEZ ENERJ\u0130;<\/strong> <strong>Ayd\u0131n, Manisa, Denizli, Bilecik ve Ni\u011fde<\/strong> b\u00f6lgelerinde toplam<strong> 42434 hektar alanda<\/strong> geli\u015ftirilmekte olan <strong>9 jeotermal lisans alan\u0131na<\/strong> sahip bir enerji \u015firketidir. \u015eirket, 2016 y\u0131l\u0131nda arama faaliyetlerine ba\u015flam\u0131\u015f olup, toplam kapasitesi <strong>300 MWe<\/strong> civar\u0131nda oldu\u011fu tahmin edilen <strong>ruhsat sahalar\u0131n\u0131n jeotermal potansiyelini de\u011ferlendirmek<\/strong> amac\u0131yla <strong>\u00fcretim kuyular\u0131n\u0131 <img loading=\"lazy\" class=\"alignright wp-image-174179\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/24-mwe-jeotermal-enerji-santrali-icin-anlasma-yapildi.jpg\" alt=\"\" width=\"320\" height=\"219\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/24-mwe-jeotermal-enerji-santrali-icin-anlasma-yapildi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/24-mwe-jeotermal-enerji-santrali-icin-anlasma-yapildi-300x206.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/24-mwe-jeotermal-enerji-santrali-icin-anlasma-yapildi-500x343.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/24-mwe-jeotermal-enerji-santrali-icin-anlasma-yapildi-73x50.jpg 73w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>geli\u015ftirmeye<\/strong> devam etmektedir.<\/p>\n<p>EXERGY; santralin tasar\u0131m\u0131, m\u00fchendisli\u011fi ve tedari\u011finden sorumlu olacakt\u0131r. ORC santrali her biri <strong>12 MWe olan iki Radyal D\u0131\u015f \u00c7\u0131k\u0131\u015fl\u0131 T\u00fcrbine (ROT)<\/strong> sahiptir ve<strong> hava so\u011futmal\u0131<\/strong> olarak dizayn edilmi\u015ftir. Proje, Exergy&#8217;nin T\u00fcrkiye&#8217;deki i\u015ftiraki EXERGY T\u00dcRK\u0130YE taraf\u0131ndan teslim edilecek <strong>t\u00fcrbin<\/strong> ve<strong> jenerat\u00f6rlerin<\/strong> T\u00fcrkiye\u2019de \u00fcretimini kaps\u0131yor ve <strong>HEZ ENERJ\u0130<\/strong>&#8216;nin <strong>yerli imalat te\u015fviklerinden<\/strong> yararlanmas\u0131n\u0131 sa\u011fl\u0131yor.<\/p>\n<p>Proje, <strong>1,7 GWe<\/strong> kurulu g\u00fcc\u00fc ile jeotermal elektrik \u00fcretiminde d\u00fcnyan\u0131n ilk 10 \u00fclkesinden biri olan ve son y\u0131llar\u0131n en h\u0131zl\u0131 b\u00fcy\u00fcyen \u00fclkelerinden biri olan T\u00fcrkiye&#8217;nin yenilenebilir enerji \u00fcretimindeki pay\u0131n\u0131n daha da art\u0131r\u0131lmas\u0131na katk\u0131 sa\u011flayacakt\u0131r. <strong>HEZ Moral\u0131 JES-1 santrali<\/strong> faaliyete ge\u00e7ti\u011finde, senelik <strong>70.000 ton fosil yak\u0131t t\u00fcketilerek<\/strong> \u00fcretilen elektri\u011fin sonucu a\u00e7\u0131\u011fa \u00e7\u0131kan<strong> CO<sub>2<\/sub> emisyonunu<\/strong> s\u0131f\u0131rlayacakt\u0131r ve T\u00fcrkiye\u2019nin karbonsuzla\u015ft\u0131rma hedefine ula\u015fmas\u0131na katk\u0131da bulunacakt\u0131r.<\/p>\n<p>EXERGY INTERNATIONAL Genel M\u00fcd\u00fcr\u00fc <strong>Luca Pozzoni<\/strong>: <em>&#8220;Bu yeni anla\u015fma, teknolojimizin ve hizmetlerimizin y\u00fcksek g\u00fcvenilirli\u011finin, kalitesinin ve T\u00fcrkiye pazar\u0131na hizmet etme yetene\u011fimizin bir takdiridir. <strong>Jeotermal portf\u00f6y\u00fcm\u00fcze<\/strong> <strong>yeni bir m\u00fc\u015fteri eklemenin<\/strong> mutlulu\u011funu ya\u015f\u0131yoruz ve bunun uzun soluklu bir i\u015f ortakl\u0131\u011f\u0131n\u0131n ba\u015flang\u0131c\u0131 olaca\u011f\u0131na eminiz. T\u00fcrkiye&#8217;deki<strong> jeotermal enerji potansiyelini geli\u015ftirmeye devam etmekte<\/strong> kararl\u0131y\u0131z.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. K\u00fcresel temiz enerji teknolojisi sa\u011flay\u0131c\u0131s\u0131 ve yeni nesil jeotermal ORC elektrik santrallerinde lider olan EXERGY INTERNATIONAL, Ayd\u0131n\u2019da kurulacak olan 24 MWe g\u00fcc\u00fcnde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":174179,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[82367,29757,109207,109206,10686,36184,109208],"views":63,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/174176"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=174176"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/174176\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/174179"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=174176"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=174176"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=174176"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}