{"id":174158,"date":"2023-05-05T10:53:02","date_gmt":"2023-05-05T07:53:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=174158"},"modified":"2023-05-05T10:53:56","modified_gmt":"2023-05-05T07:53:56","slug":"misirdaki-el-dabaa-ngsnin-3uncu-unitesinin-ana-insaat-asamasi-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/misirdaki-el-dabaa-ngsnin-3uncu-unitesinin-ana-insaat-asamasi-basladi\/","title":{"rendered":"(Turkish) M\u0131s\u0131r&#8217;daki El-Dabaa NGS\u2019nin 3\u2019\u00fcnc\u00fc \u00dcnitesinin Ana \u0130n\u015faat A\u015famas\u0131 Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/174158\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>M\u0131s\u0131r&#8217;daki El-Dabaa in\u015faat sahas\u0131nda, El-Dabaa N\u00fckleer G\u00fc\u00e7 Santrali&#8217;nin (NGS) 3\u2019\u00fcnc\u00fc \u00dcnitesi i\u00e7in ilk beton d\u00f6k\u00fcld\u00fc. B\u00f6ylece El-Dabaa NGS\u2019nin 3\u2019\u00fcnc\u00fc \u00dcnitesinin ana in\u015faat a\u015famas\u0131 ba\u015flam\u0131\u015f oldu.<\/h2>\n<p><strong>M\u0131s\u0131r N\u00fckleer ve Radyolojik D\u00fczenleme Kurumu<\/strong> taraf\u0131ndan 29 Mart 2023 tarihinde <strong>El-Dabaa NGS<\/strong>\u2019nin 3\u2019\u00fcnc\u00fc \u00dcnitesi i\u00e7in in\u015faat izninin verilmesinin ard\u0131ndan ilk betonun d\u00f6k\u00fclmesi dolay\u0131s\u0131yla t\u00f6ren d\u00fczenlendi.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-174160\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/misirdaki-el-dabaa-ngsnin-3uncu-unitesinin-ana-insaat-asamasi-basladi.jpg\" alt=\"\" width=\"320\" height=\"254\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/misirdaki-el-dabaa-ngsnin-3uncu-unitesinin-ana-insaat-asamasi-basladi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/misirdaki-el-dabaa-ngsnin-3uncu-unitesinin-ana-insaat-asamasi-basladi-300x238.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/misirdaki-el-dabaa-ngsnin-3uncu-unitesinin-ana-insaat-asamasi-basladi-500x397.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/05\/misirdaki-el-dabaa-ngsnin-3uncu-unitesinin-ana-insaat-asamasi-basladi-63x50.jpg 63w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>M\u0131s\u0131r N\u00fckleer G\u00fc\u00e7 Santralleri Kurumu Y\u00f6netim Kurulu Ba\u015fkan\u0131 Dr. Emced El-Vekil<\/strong>, t\u00f6rene kat\u0131lanlara hitaben yapt\u0131\u011f\u0131 konu\u015fmada El-Dabaa NGS Projesinin ba\u015far\u0131lar\u0131ndan bahsederek \u015funlar\u0131 s\u00f6yledi:<\/p>\n<p><em>\u201cT\u00f6ren, \u00e7al\u0131\u015fma gruplar\u0131n\u0131n ortak ve s\u00fcrekli \u00e7abalar\u0131 sonucunda elde edilen ba\u015far\u0131lar\u0131 yans\u0131tmaktad\u0131r. Ge\u00e7ti\u011fimiz y\u0131l, <strong>1\u2019inci<\/strong> ve<strong> 2\u2019nci<\/strong> \u00fcnite i\u00e7in ilk betonun d\u00f6k\u00fclmesi ve 1\u2019inci \u00dcniteye kor tutucunun teslim edilmesi de dahil olmak \u00fczere projenin bir\u00e7ok \u00f6nemli d\u00f6n\u00fcm noktas\u0131na tan\u0131kl\u0131k ettik. Proje, planlanan takvime uygun olarak ilerlemektedir. 3\u2019\u00fcnc\u00fc \u00dcnitenin ilk beton d\u00f6k\u00fcm\u00fcne ve bu ortak hedef do\u011frultusunda \u00e7al\u0131\u015fan ekiplerin \u00f6zverili \u00e7al\u0131\u015fmalar\u0131na tan\u0131kl\u0131k etmek \u00fczere burada bulunuyoruz. M\u0131s\u0131r&#8217;\u0131n ilk n\u00fckleer g\u00fc\u00e7 santralini ba\u015far\u0131yla teslim etmek amac\u0131yla daha da \u00f6nemli ba\u015far\u0131lara imza atmaya kararl\u0131y\u0131z.\u201d<\/em><\/p>\n<p><strong>Atomstroyexport A.\u015e.&#8217;nin NGS in\u015faat proje y\u00f6netiminden sorumlu<\/strong> <strong>K\u0131demli Ba\u015fkan Yard\u0131mc\u0131s\u0131 Dr. Alexander Korchagin<\/strong> de bu \u00f6nemli ba\u015far\u0131n\u0131n kaydedilen istikrarl\u0131 ilerlemeye dayand\u0131\u011f\u0131n\u0131 belirterek \u015funlar\u0131 vurgulad\u0131:<\/p>\n<p><em>\u201cEl-Dabaa N\u00fckleer G\u00fc\u00e7 Santralinin 3\u2019\u00fcnc\u00fc \u00dcnitesinin in\u015fas\u0131na ba\u015flanmas\u0131, projenin ivme kazand\u0131\u011f\u0131 anlam\u0131na gelmektedir. Ge\u00e7ti\u011fimiz y\u0131l 1\u2019inci ve 2\u2019nci \u00fcnitelerin in\u015faat \u00e7al\u0131\u015fmalar\u0131n\u0131n ba\u015flamas\u0131na tan\u0131k olduk. Bug\u00fcn ise 3\u2019\u00fcnc\u00fc \u00dcnitenin ana in\u015faat a\u015famas\u0131na ge\u00e7erek \u00f6nemli bir ad\u0131m daha at\u0131yoruz. ASE A.\u015e i\u00e7in VVER-1200 tasar\u0131ml\u0131 \u00fcnitelerin in\u015fas\u0131, ekipman \u00fcretim s\u00fcrecini ayarlamam\u0131za ve El-Dabaa N\u00fckleer G\u00fc\u00e7 Santrali projesiyle ilgili belirli \u00f6zellikleri dikkate alarak in\u015faat personelinin \u00e7ekirdek ekibini olu\u015fturmam\u0131za olanak tan\u0131yan tan\u0131d\u0131k ve iyi test edilmi\u015f bir s\u00fcre\u00e7tir. \u0130yi koordine edilmi\u015f ortak \u00e7al\u0131\u015fma i\u00e7in M\u0131s\u0131rl\u0131 ortaklar\u0131m\u0131za minnettar\u0131z. Birlikte bu iddial\u0131 projeyi hayata ge\u00e7irmeyi ba\u015faraca\u011f\u0131z\u201d.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. M\u0131s\u0131r&#8217;daki El-Dabaa in\u015faat sahas\u0131nda, El-Dabaa N\u00fckleer G\u00fc\u00e7 Santrali&#8217;nin (NGS) 3\u2019\u00fcnc\u00fc \u00dcnitesi i\u00e7in ilk beton d\u00f6k\u00fcld\u00fc. B\u00f6ylece El-Dabaa NGS\u2019nin 3\u2019\u00fcnc\u00fc \u00dcnitesinin ana in\u015faat [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":174160,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[104439,104436,35430,104442],"views":35,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/174158"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=174158"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/174158\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/174160"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=174158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=174158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=174158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}