{"id":173676,"date":"2023-04-26T14:27:48","date_gmt":"2023-04-26T11:27:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=173676"},"modified":"2023-04-26T14:28:16","modified_gmt":"2023-04-26T11:28:16","slug":"atiktan-enerji-uretim-tesisinin-isletme-ve-bakim-ihalesini-veolia-kazandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/atiktan-enerji-uretim-tesisinin-isletme-ve-bakim-ihalesini-veolia-kazandi\/","title":{"rendered":"(Turkish) At\u0131ktan Enerji \u00dcretim Tesisinin \u0130\u015fletme ve Bak\u0131m \u0130halesini Veolia Kazand\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/173676\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>T\u00fcrkiye&#8217;nin ilk ve Avrupa&#8217;n\u0131n en b\u00fcy\u00fck at\u0131ktan enerji \u00fcretim tesisi, \u0130stanbul\u2019da i\u015fletiliyor. Y\u0131lda 1,1 milyon ton i\u015fleme kapasitesiyle T\u00fcrkiye&#8217;deki ilk at\u0131ktan enerji tesisi olarak hizmete giren \u0130BB-\u0130STA\u00c7 santrali, 85 MW&#8217;l\u0131k t\u00fcrbiniyle 1,4 milyon ki\u015finin ihtiyac\u0131n\u0131 kar\u015f\u0131layacak elektrik \u00fcretiyor. B\u00f6ylece y\u0131lda yakla\u015f\u0131k 1,5 milyon ton karbon emisyonunun azalt\u0131lmas\u0131n\u0131 sa\u011flayarak, T\u00fcrkiye\u2019nin 2053\u2019te karbon n\u00f6tr olma hedefine katk\u0131da bulunacak.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-173680\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/IstanbulKarbon_1.jpg\" alt=\"\" width=\"500\" height=\"231\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/IstanbulKarbon_1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/IstanbulKarbon_1-300x139.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/IstanbulKarbon_1-500x231.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/IstanbulKarbon_1-80x37.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Su, at\u0131k ve enerji y\u00f6netimi konusunda d\u00fcnya \u00e7ap\u0131nda hizmet veren Fransa merkezli <strong>Veolia Grubu<\/strong>, \u0130stanbul B\u00fcy\u00fck\u015fehir Belediyesi i\u015ftiraklerinden \u0130STA\u00c7 ile el s\u0131k\u0131\u015ft\u0131\u011f\u0131n\u0131 duyurarak <strong>\u201cT\u00fcrkiye&#8217;nin ilk ve Avrupa&#8217;n\u0131n en b\u00fcy\u00fck at\u0131ktan enerji \u00fcretim tesisinin i\u015fletme ve bak\u0131m ihalesini kazand\u0131k\u201d<\/strong> a\u00e7\u0131klamas\u0131n\u0131 yapt\u0131.<\/p>\n<p>Anla\u015fma kapsam\u0131nda Veolia; T\u00fcrkiye ve Avrupa Birli\u011fi\u2019nin \u00e7evre standartlar\u0131na s\u0131k\u0131 uyum sa\u011flamak, enerji verimlili\u011fini art\u0131rmak ve kamu hizmeti kalitesini y\u00fckseltmek i\u00e7in <strong>santralin t\u00fcm operasyonlar\u0131ndan ve bak\u0131m\u0131ndan sorumlu olacak<\/strong>. Y\u0131lda 1,1 milyon ton civar\u0131nda geri d\u00f6n\u00fc\u015ft\u00fcr\u00fclemeyen evsel at\u0131\u011f\u0131 i\u015fleme kapasitesine sahip Yakma Tesisi, 85 MW&#8217;l\u0131k t\u00fcrbiniyle 1,4 milyon ki\u015finin ihtiyac\u0131na kar\u015f\u0131l\u0131k gelen 560.000 MWh elektri\u011fi \u00fcretecek. B\u00f6ylece, \u0130STA\u00c7 taraf\u0131ndan yap\u0131lan resmi de\u011ferlendirmeye g\u00f6re, y\u0131lda yakla\u015f\u0131k <strong>1,5 milyon ton karbon emisyonu<\/strong> engellenecek.<\/p>\n<h3><strong>T\u00fcrkiye\u2019nin karbon n\u00f6tr olma hedefine katk\u0131da bulunacak<\/strong><\/h3>\n<p>Veolia\u2019dan yap\u0131lan a\u00e7\u0131klamada, daha fazla karbon salan <strong>at\u0131k depolama sahalar\u0131n\u0131n kullan\u0131m\u0131n\u0131 azalt\u0131p<\/strong> <strong>enerji geri kazan\u0131m\u0131<\/strong> sa\u011flayan projenin, T\u00fcrkiye\u2019deki at\u0131k sekt\u00f6r\u00fcn\u00fcn karbonsuzla\u015ft\u0131r\u0131lmas\u0131nda t\u00fcr\u00fcn\u00fcn ilk \u00f6rne\u011fi oldu\u011fu bildirildi. Projenin ayn\u0131 zamanda, T\u00fcrkiye\u2019nin 2053 y\u0131l\u0131na kadar <strong>karbon n\u00f6tr olma<\/strong> hedefine do\u011frudan katk\u0131da bulundu\u011fu belirtildi.<\/p>\n<p>Konuyla ilgili a\u00e7\u0131klama yapan <strong>Veolia \u0130cra Kurulu Ba\u015fkan\u0131 Estelle Brachlianoff<\/strong>, <em>\u201c\u00dclkenin ilk at\u0131ktan enerjiye d\u00f6n\u00fc\u015ft\u00fcr\u00fclen tesisini i\u015fleterek, T\u00fcrkiye\u2019nin ekolojik d\u00f6n\u00fc\u015f\u00fcm\u00fcne katk\u0131da bulunmaktan gurur duyuyoruz. Bunun, \u00fclkenin karbon n\u00f6tr olma hedefi do\u011frultusunda, \u0130stanbul&#8217;da at\u0131k ve enerji y\u00f6netiminde ileriye do\u011fru at\u0131lm\u0131\u015f \u00e7ok \u00f6nemli bir ad\u0131m oldu\u011funu d\u00fc\u015f\u00fcn\u00fcyoruz. At\u0131k y\u00f6netiminde b\u00f6lgesine \u00f6rnek te\u015fkil edece\u011fine inand\u0131\u011f\u0131m\u0131z, tarihi \u00f6neme sahip bu projede, T\u00fcrk ortaklar\u0131m\u0131zla i\u015fbirli\u011fi yapmaktan mutluluk duyuyoruz\u201d<\/em> dedi.<\/p>\n<h3><strong>\u201c\u00dclkemizin s\u00fcrd\u00fcr\u00fclebilir kalk\u0131nmas\u0131nda \u00f6nemli bir kilometre ta\u015f\u0131\u201d<\/strong><\/h3>\n<p>Avrupa&#8217;n\u0131n en b\u00fcy\u00fck<strong> geri d\u00f6n\u00fc\u015f\u00fcm, y\u00f6netim ve at\u0131k y\u00f6netimi<\/strong> \u015firketlerinden biri olan <strong>\u0130STA\u00c7<\/strong>, 40 operasyonel birimi ve 4 bini a\u015fk\u0131n \u00e7al\u0131\u015fan\u0131yla <strong>y\u0131lda 8 milyon ton evsel kat\u0131 at\u0131\u011f\u0131<\/strong> y\u00f6netiyor. \u0130STA\u00c7, \u0130stanbul\u2019da yakla\u015f\u0131k 200 hektarl\u0131k alanda <strong>biyogazdan 68 MW<\/strong> elektrik \u00fcreten 2 adet <strong>Belediye At\u0131\u011f\u0131 D\u00fczenli Depolama Tesisi<\/strong> i\u015fletiyor.<\/p>\n<p><em>\u201cT\u00fcrkiye&#8217;nin ilk ticari \u00f6l\u00e7ekli ve Avrupa\u2019n\u0131n en b\u00fcy\u00fck at\u0131ktan enerji santralinin devreye al\u0131nmas\u0131, \u00fclkemizin s\u00fcrd\u00fcr\u00fclebilir kalk\u0131nmas\u0131nda \u00e7ok \u00f6nemli bir kilometre ta\u015f\u0131n\u0131 temsil ediyor\u201d diyen <strong>\u0130STA\u00c7 Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 \u00d6zg\u00fcr Bar\u0131\u015fkan<\/strong>, anla\u015fmayla ilgili \u015fu de\u011ferlendirmeyi yapt\u0131: \u201cBu proje i\u00e7in \u00e7evreci \u00e7\u00f6z\u00fcmler konusunda deneyimli bir k\u00fcresel liderle g\u00fc\u00e7lerimizi birle\u015ftirmek istedik. <strong>S\u00fcrd\u00fcr\u00fclebilir enerji \u00fcretimi<\/strong> ve <strong>d\u00fc\u015f\u00fck karbonlu kalk\u0131nma<\/strong> tecr\u00fcbesine sahip <strong>Veolia<\/strong> ile birlikte \u00e7al\u0131\u015fmaktan mutluyuz.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye&#8217;nin ilk ve Avrupa&#8217;n\u0131n en b\u00fcy\u00fck at\u0131ktan enerji \u00fcretim tesisi, \u0130stanbul\u2019da i\u015fletiliyor. Y\u0131lda 1,1 milyon ton i\u015fleme kapasitesiyle T\u00fcrkiye&#8217;deki ilk at\u0131ktan enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":173681,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[45819,1488,109051,1967,109052],"views":86,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/173676"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=173676"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/173676\/revisions"}],"predecessor-version":[{"id":173677,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/173676\/revisions\/173677"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/173681"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=173676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=173676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=173676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}