{"id":172720,"date":"2023-04-10T14:30:47","date_gmt":"2023-04-10T11:30:47","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=172720"},"modified":"2023-04-10T14:31:35","modified_gmt":"2023-04-10T11:31:35","slug":"geyve-res-e-37-5-yillik-uretim-lisansi-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/geyve-res-e-37-5-yillik-uretim-lisansi-verildi\/","title":{"rendered":"(Turkish) &#8217;Geyve RES&#8217;e 37,5 Y\u0131ll\u0131k \u00dcretim Lisans\u0131 Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/172720\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>EPDK taraf\u0131ndan Eksim Enerji\u2019ye ait Geyve RES tesisine 37 <img loading=\"lazy\" class=\"alignright wp-image-172722\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/geyve-res-375-yillik-uretim-lisansi-aldi.jpg\" alt=\"\" width=\"320\" height=\"229\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/geyve-res-375-yillik-uretim-lisansi-aldi.jpg 600w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/geyve-res-375-yillik-uretim-lisansi-aldi-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/geyve-res-375-yillik-uretim-lisansi-aldi-500x358.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/geyve-res-375-yillik-uretim-lisansi-aldi-70x50.jpg 70w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>y\u0131l, 7 ay ve 20 g\u00fcn s\u00fcreli \u00fcretim lisans\u0131 verildi.<\/h2>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK), Hacim Enerji Yat\u0131r\u0131m \u00dcretim ve Ticaret A\u015e\u2019ye r\u00fczgar enerjisine dayal\u0131 \u00fcretim yapan <strong>Geyve R\u00fczgar Enerjisi Santrali (RES)<\/strong> i\u00e7in <strong>20 Ekim 2011<\/strong> tarihinde verdi\u011fi <strong>E\u00dc\/3465-3\/2096<\/strong> numaral\u0131 \u00fcretim lisans\u0131n\u0131 <strong>02 Mart 2023<\/strong> tarihli karar\u0131yla sonland\u0131rd\u0131.<\/p>\n<p>EPDK, <strong>Geyve RES i\u00e7in Eksim Enerji A\u015e\u2019ye<\/strong>, eskisinin devam\u0131 mahiyetinde <strong>37 y\u0131l, 7 ay, 20 g\u00fcn s\u00fcreli<\/strong> yeni \u00fcretim lisans\u0131 verdi.<\/p>\n<p>Sakarya&#8217;n\u0131n Geyve il\u00e7esinde <strong>129,8MWe<\/strong> kurulu g\u00fc\u00e7le faaliyette bulunan tesis halen<strong> 50MWe<\/strong> i\u015fletme kapasitesiyle \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. EPDK taraf\u0131ndan Eksim Enerji\u2019ye ait Geyve RES tesisine 37 y\u0131l, 7 ay ve 20 g\u00fcn s\u00fcreli \u00fcretim lisans\u0131 verildi. Enerji Piyasas\u0131 D\u00fczenleme [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":172722,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[97192,750,106859,108814,55187,474,16,6660],"views":138,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/172720"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=172720"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/172720\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/172722"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=172720"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=172720"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=172720"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}