{"id":17262,"date":"2013-11-06T10:34:12","date_gmt":"2013-11-06T07:34:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=17262"},"modified":"2013-11-06T10:34:12","modified_gmt":"2013-11-06T07:34:12","slug":"cinerden-adanaya-6-4-mwlik-hidroelektrik-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cinerden-adanaya-6-4-mwlik-hidroelektrik-santrali\/","title":{"rendered":"(Turkish) Ciner`den Adana\u2019ya 6.4 MW\u2019l\u0131k Hidroelektrik Santrali&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/17262\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ciner Grubu, Adana`n\u0131n Saimbeyli ve Feke il\u00e7eleri`ne ba\u011fl\u0131 \u00c7orak ve G\u00fczp\u0131nar\u0131 k\u00f6ylerinin s\u0131n\u0131rlar\u0131 i\u00e7inde Ya\u011fnik deresi \u00fczerinde 6.4 MW kurulu g\u00fcce sahip bir hidroelektrik santrali kuracak.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-14207\" title=\"hes-projesi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-300x217.jpg\" alt=\"\" width=\"300\" height=\"217\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-300x217.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-500x362.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi.jpg 650w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Ciner Grubu b\u00fcnyesinde faaliyet g\u00f6steren Park Teknik Elektrik Madencilik Turizm Sanayi Ticaret Anonim \u015eirketi, Adana\u2019da 6,4 MW kurulu g\u00fcc\u00fcndeki T\u00fcrky\u0131lmaz 2 Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali\u2019ni (HES) kurmak \u00fczere \u00e7al\u0131\u015fmalara ba\u015flad\u0131. Proje i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) ba\u015fvurusunu yapan firma, di\u011fer izinlerini de alarak \u00fcretim lisans\u0131n\u0131 almay\u0131 hedefliyor.<\/p>\n<p><strong>SANTRAL\u2019DE 24,4 GWH ELEKTR\u0130K \u00dcRET\u0130LECEK<\/strong><br \/>\nAdana ili Saimbeyli ve Feke il\u00e7eleri \u00c7orak K\u00f6y\u00fc ve G\u00fczp\u0131nar\u0131 K\u00f6y\u00fc s\u0131n\u0131rlar\u0131nda Ya\u011fnik Deresi \u00fczerinde kurulmas\u0131 hedeflenen T\u00fcrky\u0131lmaz Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali 2 projesi, 6,408 MW (6,408 MWm-6,151 MWe) kurulu g\u00fcc\u00fcnde olacak. S\u00f6z konusu proje ile y\u0131lda 24.248828 GWh elektrik enerjisi \u00fcretilecek.<\/p>\n<p>\u00dcretilen elektrik enerjisi, 3500&#215;2 kVA (6.3\/ 31.5 kV) g\u00fcc\u00fcndeki trafo \u00e7\u0131k\u0131\u015flar\u0131nda d\u00fczenlenecek \u015falt panolar\u0131 \u00fczerinden 30 km uzunlu\u011fundaki enerji iletim hatt\u0131 ile Feke Trafo Merkezi (TM) aktar\u0131lacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/cinerden-adanaya-64-mwlik-hidroelektrik-santrali_5508.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ciner Grubu, Adana`n\u0131n Saimbeyli ve Feke il\u00e7eleri`ne ba\u011fl\u0131 \u00c7orak ve G\u00fczp\u0131nar\u0131 k\u00f6ylerinin s\u0131n\u0131rlar\u0131 i\u00e7inde Ya\u011fnik deresi \u00fczerinde 6.4 MW kurulu g\u00fcce sahip bir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14207,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[3272,3315,19,63,67,1009,165,35370,1090,10148,10147],"views":2420,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17262"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=17262"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17262\/revisions"}],"predecessor-version":[{"id":17264,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17262\/revisions\/17264"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14207"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=17262"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=17262"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=17262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}