{"id":172306,"date":"2023-04-03T14:28:06","date_gmt":"2023-04-03T11:28:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=172306"},"modified":"2023-04-03T14:30:06","modified_gmt":"2023-04-03T11:30:06","slug":"yeo-kosovada-gunde-10-bin-metrekup-suyu-dogaya-kazandiracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeo-kosovada-gunde-10-bin-metrekup-suyu-dogaya-kazandiracak\/","title":{"rendered":"(Turkish) &#8217;YEO&#8217; Kosova\u2019da G\u00fcnde 10 Bin Metrek\u00fcp Suyu Do\u011faya Kazand\u0131racak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/172306\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Enerji teknolojileri ve m\u00fchendislik \u015firketi YEO, Kosova\u2019n\u0131n Yakova \u015fehrindeki At\u0131ksu Ar\u0131tma Tesisi projesini ba\u015far\u0131yla tamamlayarak teslim etti. Tesis g\u00fcnl\u00fck 10 bin metrek\u00fcp suyu do\u011faya geri kazand\u0131racak.<\/strong><\/h2>\n<p>\u2018Daha temiz bir d\u00fcnya m\u00fcmk\u00fcn\u2019 slogan\u0131yla yenilenebilir enerji ve m\u00fchendislik projeleri \u00fcreten YEO Teknoloji, Kosova\u2019da \u00fcstlendi\u011fi <strong>at\u0131k su ar\u0131tma tesisini ba\u015far\u0131yla tamamlayarak<\/strong> teslim etti. <img loading=\"lazy\" class=\"alignright wp-image-172310\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/yeo-kosovada-gunde-10-bin-metrekup-suyu-dogaya-kazandiracak-1.jpg\" alt=\"\" width=\"320\" height=\"195\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/yeo-kosovada-gunde-10-bin-metrekup-suyu-dogaya-kazandiracak-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/yeo-kosovada-gunde-10-bin-metrekup-suyu-dogaya-kazandiracak-1-300x183.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/yeo-kosovada-gunde-10-bin-metrekup-suyu-dogaya-kazandiracak-1-500x305.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/04\/yeo-kosovada-gunde-10-bin-metrekup-suyu-dogaya-kazandiracak-1-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Yakova \u015fehrindeki<strong> At\u0131k Su Ar\u0131tma Tesisi<\/strong> ile g\u00fcnde <strong>10 bin metrek\u00fcpl\u00fck<\/strong> su do\u011faya geri kazand\u0131r\u0131lacak.<\/p>\n<p>T\u00fcrkiye\u2019nin \u00f6nde gelen enerji teknolojileri ve m\u00fchendislik \u015firketlerinden YEO Teknoloji, ge\u00e7ti\u011fimiz y\u0131l Kosova\u2019n\u0131n Yakova \u015fehrindeki projeyi \u00fcstlenmi\u015fti. \u00dclkedeki at\u0131k sular\u0131n \u00e7evreyi kirletmesinin \u00f6n\u00fcne ge\u00e7en,<strong> ar\u0131tma\/geri d\u00f6n\u00fc\u015f\u00fcm yoluyla<\/strong> end\u00fcstriyel s\u00fcre\u00e7lerde ve <strong>tar\u0131mda yeniden kullan\u0131labilir<\/strong> hale getiren tesis devreye al\u0131nd\u0131. G\u00fcnde <strong>10 bin metrek\u00fcp suyun do\u011faya geri kazand\u0131r\u0131lmas\u0131n\u0131<\/strong> sa\u011flayacak tesis ile \u00fclkedeki <strong>d\u00f6ng\u00fcsel ekonomiye<\/strong> katk\u0131 sa\u011flanacak.<\/p>\n<h3><strong>Ak\u0131ll\u0131 teknolojiyle \u00fcretildi<\/strong><\/h3>\n<p>YEO Teknoloji, tesiste end\u00fcstriyel alanda ileri d\u00fczeyde m\u00fchendislik gerektiren<strong> SCADA sistemini<\/strong> kulland\u0131.\u00a0SCADA sistemleri, bir\u00e7ok end\u00fcstriyel alanda kullan\u0131larak bu tesislerdeki<strong> faaliyetlerin takip<\/strong> ve <strong>kontrol edilmesini<\/strong>\u00a0sa\u011fl\u0131yor.\u00a0B\u00f6ylece tesisteki\u00a0\u00fcretim ad\u0131mlar\u0131\u00a0tek bir yerden\u00a0izlenebiliyor. SCADA ile\u00a0<strong>istenmeyen\u00a0durumlarda operat\u00f6rler uyar\u0131l\u0131yor<\/strong>.\u00a0YEO, uzman m\u00fchendislik kadrosuyla\u00a0<strong>SCADA<\/strong>\u2019n\u0131n yan\u0131nda\u00a0<strong>PLC, DCS\u00a0ve RTU \u00e7\u00f6z\u00fcmleri\u00a0de<\/strong>\u00a0sa\u011fl\u0131yor.<\/p>\n<p>3 k\u0131tada 30\u2019un \u00fczerinde \u00fclkede 225\u2019ten fazla projeyle\u00a0<strong>Avrupa, Orta Do\u011fu, Orta Asya ve Afrika\u2019da<\/strong>\u00a0d\u00fcnyan\u0131n her noktas\u0131na enerji ve end\u00fcstriyel \u00e7\u00f6z\u00fcmler\u00a0ula\u015ft\u0131ran YEO Teknoloji,\u00a019\u00a0y\u0131l\u0131 a\u015fk\u0131n s\u00fcredir\u00a0600\u2019\u00fcn\u00a0\u00fczerinde\u00a0\u00e7al\u0131\u015fan\u0131yla\u00a0sekt\u00f6r\u00fcn\u00a0en yenilik\u00e7i kurumlar\u0131ndan biri olarak yoluna devam ediyor. <em>Yenilenebilir enerji g\u00fcne\u015f, r\u00fczgar, batarya depolama ve enerji teknolojileri<\/em> ve yat\u0131r\u0131mlar\u0131na kadar enerjinin her alan\u0131na dokunan faaliyetler y\u00fcr\u00fcterek \u00fclke ekonomisine de de\u011fer kat\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji teknolojileri ve m\u00fchendislik \u015firketi YEO, Kosova\u2019n\u0131n Yakova \u015fehrindeki At\u0131ksu Ar\u0131tma Tesisi projesini ba\u015far\u0131yla tamamlayarak teslim etti. Tesis g\u00fcnl\u00fck 10 bin metrek\u00fcp [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":172309,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[35397,108676,5326,3736,3992,108675,96708],"views":39,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/172306"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=172306"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/172306\/revisions"}],"predecessor-version":[{"id":172307,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/172306\/revisions\/172307"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/172309"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=172306"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=172306"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=172306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}