{"id":172081,"date":"2023-03-30T14:00:03","date_gmt":"2023-03-30T11:00:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=172081"},"modified":"2023-03-30T14:02:38","modified_gmt":"2023-03-30T11:02:38","slug":"akfen-yenilenebilir-enerji-2023-un-2inci-yarisinda-yeni-yatirimlarina-basliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akfen-yenilenebilir-enerji-2023-un-2inci-yarisinda-yeni-yatirimlarina-basliyor\/","title":{"rendered":"(Turkish) &#8217;Akfen Yenilenebilir Enerji&#8217; 2023&#8217;\u00fcn 2&#8217;inci Yar\u0131s\u0131nda Yeni Yat\u0131r\u0131mlar\u0131na Ba\u015fl\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/172081\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>G\u00fcne\u015f, su ile r\u00fczgar gibi yerli ve yenilenebilir kaynaklardan enerji \u00fcretimi yapan yakla\u015f\u0131k 700 MW\u2019l\u0131k kurulu g\u00fcce sahip Akfen Yenilenebilir Enerji, 2023 y\u0131l\u0131n\u0131n ikinci yar\u0131s\u0131nda hayata ge\u00e7irece\u011fi yat\u0131r\u0131mlarla 4 r\u00fczgar enerjisi santraline 64 MW\u2019l\u0131k hibrit g\u00fcne\u015f enerjisi kapasitesi eklerken, yine 5 r\u00fczgar enerjisi santralinin de kapasitelerini 92,4 MW art\u0131rmay\u0131 planl\u0131yor.<\/strong><\/h2>\n<p>Akfen Yenilenebilir Enerji, halen yat\u0131r\u0131m a\u015famas\u0131nda bulunan ve yat\u0131r\u0131mlar\u0131n\u0131n tamamlanmas\u0131 ile <img loading=\"lazy\" class=\"alignright wp-image-172084\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/1680168237_Akfen_RES.jpg\" alt=\"\" width=\"320\" height=\"233\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/1680168237_Akfen_RES.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/1680168237_Akfen_RES-300x218.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/1680168237_Akfen_RES-500x364.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/1680168237_Akfen_RES-69x50.jpg 69w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>portf\u00f6y\u00fcne dahil olacak projelerdeki son durum hakk\u0131nda a\u00e7\u0131klamada bulundu.<\/p>\n<p>Buna g\u00f6re Akfen Yenilenebilir Enerji, \u00c7anakkale\u2019deki <strong>\u00dc\u00e7p\u0131nar RES<\/strong> projesinde 40,02 MW, <strong>Hasanoba RES<\/strong>\u2019te 12,68 MW, <strong>Kocalar RES<\/strong>\u2019de 4,95 MW\u2019l\u0131k ve Denizli\u2019deki <strong>Denizli RES<\/strong> projesinde de 6,36 MW\u2019l\u0131k <strong>hibrit g\u00fcne\u015f santrali projesi (GES)<\/strong> kurulumuna y\u00f6nelik b\u00fct\u00fcn izinlerini tamamlarken, in\u015faata haz\u0131r hale getirdi. Bu 4 projede <strong>64,01 MW\u2019l\u0131k<\/strong> GES projesinin yat\u0131r\u0131m\u0131na <strong>2023 y\u0131l\u0131 i\u00e7erisinde<\/strong> ba\u015flanmas\u0131 planlan\u0131yor.<\/p>\n<p>\u00d6te yandan \u015firketin Osmaniye\u2019deki <strong>Sar\u0131tepe RES<\/strong> projesinde 12,97 MW ve <strong>Demirciler RES\u2019te<\/strong> 13,26 MW, Sakarya\u2019daki <strong>Do\u011fan\u00e7ay HES<\/strong> projesinde 4,53 MW\u2019l\u0131k<strong> hibrit GES projelerinin<\/strong> ise izin s\u00fcre\u00e7leri devam ediyor.<\/p>\n<h3><strong>92,4 MW\u2019LIK RES <\/strong><strong>KAPAS\u0130TE ARTI\u015eI<\/strong><\/h3>\n<p>Akfen Yenilenebilir Enerji, hibrit yat\u0131r\u0131mlar\u0131n\u0131n yan\u0131 s\u0131ra kapasite art\u0131\u015flar\u0131yla da kurulu g\u00fcc\u00fcnde \u00f6nemli bir art\u0131\u015f sa\u011flamay\u0131 planl\u0131yor. Buna g\u00f6re <strong>Denizli RES\u2019de<\/strong> 25 MW, <strong>\u00dc\u00e7p\u0131nar RES\u2019de<\/strong> 9,6 MW, <strong>Kocalar RES\u2019de<\/strong> 25 MW, <strong>Sar\u0131tepe RES\u2019de<\/strong> 7,8 MW ve <strong>Hasanoba RES\u00a0<\/strong>projesinde de 25 MW olmak \u00fczere lisans sahas\u0131na s\u0131\u011fabilecek azami toplam <strong>92,4 MW<\/strong> r\u00fczgar kapasite art\u0131\u015f\u0131na ba\u015fvuru yapt\u0131. Mevcut durumda, (Hasonoba projesi hari\u00e7) 4 adet RES projesinde toplam <strong>67,4 MW kapasite art\u0131\u015f\u0131 izinleri<\/strong> tamamlan\u0131rken,<strong> sadece kesin orman izni beklendikten sonra<\/strong> in\u015faata haz\u0131r hale gelecek.<\/p>\n<p>Akfen Yenilenebilir Enerji, hibrit projeler ve RES kapasite art\u0131\u015f\u0131 yat\u0131r\u0131mlar\u0131na 2023 y\u0131l\u0131n\u0131n ikinci yar\u0131s\u0131nda ba\u015flamay\u0131 hedefliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcne\u015f, su ile r\u00fczgar gibi yerli ve yenilenebilir kaynaklardan enerji \u00fcretimi yapan yakla\u015f\u0131k 700 MW\u2019l\u0131k kurulu g\u00fcce sahip Akfen Yenilenebilir Enerji, 2023 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":172086,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[28245,108589,45592],"views":67,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/172081"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=172081"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/172081\/revisions"}],"predecessor-version":[{"id":172082,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/172081\/revisions\/172082"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/172086"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=172081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=172081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=172081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}