{"id":17196,"date":"2013-11-04T18:53:27","date_gmt":"2013-11-04T15:53:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=17196"},"modified":"2013-11-04T18:53:27","modified_gmt":"2013-11-04T15:53:27","slug":"konuklu-enerjiden-siirte-hes-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/konuklu-enerjiden-siirte-hes-yatirimi\/","title":{"rendered":"(Turkish) Konuklu Enerji\u2019den Siirt\u2019e HES Yat\u0131r\u0131m\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/17196\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Konuklu Enerji Elektrik. \u00dcretim. A.\u015e., Siirt\u2019in Pervari il\u00e7esine 54 MW\u2019l\u0131k Il\u0131su Reg\u00fclat\u00f6r\u00fc ve HES Projesini kurmak \u00fczere \u00e7al\u0131\u015fmalara ba\u015flad\u0131.<\/strong><\/p>\n<p><strong>PROJE \u0130\u00c7\u0130N \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><br \/>\nProje i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) s\u00fcreci ba\u015flat\u0131lm\u0131\u015f olup, di\u011fer izin ve lisans s\u00fcre\u00e7lerinin de devam etti\u011fi ve gerekli izinlerin al\u0131nmas\u0131 ile 3 y\u0131ll\u0131k in\u015faat \u00e7al\u0131\u015fmalar\u0131na ba\u015flanmas\u0131 bekleniyor.<\/p>\n<p><strong>PROJE\u2019N\u0130N YAKLA\u015eIK YATIRIM MAL\u0130YET\u0130<\/strong><br \/>\n\u00c7atak \u00c7ay\u0131n\u0131n bir kolu olan Sineber Dere \u00fczerindeki 1.650 m. ile 1.185 m. Kotlar\u0131 aras\u0131ndaki d\u00fc\u015f\u00fcn\u00fcn de\u011ferlendi<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/konuklu-enerjiden-siirte-hidro-elektrik-santrali-yatirimi_.jpg\"><img loading=\"lazy\" class=\"alignright size-full wp-image-17197\" title=\"konuklu-enerjiden-siirte-hidro-elektrik-santrali-yatirimi_\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/konuklu-enerjiden-siirte-hidro-elektrik-santrali-yatirimi_.jpg\" alt=\"\" width=\"273\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/konuklu-enerjiden-siirte-hidro-elektrik-santrali-yatirimi_.jpg 273w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/11\/konuklu-enerjiden-siirte-hidro-elektrik-santrali-yatirimi_-73x50.jpg 73w\" sizes=\"(max-width: 273px) 100vw, 273px\" \/><\/a>rilmesi amac\u0131yla kurulacak olan HES\u2019in yakla\u015f\u0131k yat\u0131r\u0131m maliyetin ise 110 milyon TL olarak \u00f6ng\u00f6r\u00fcld\u00fc.<\/p>\n<p><strong>PROJEN\u0130N \u00d6ZELL\u0130KLER\u0130<\/strong><br \/>\nReg\u00fclat\u00f6rden al\u0131nacak olan su, 8.450 m. uzunlu\u011fundaki iletim t\u00fcneli ve 3.700 m. iletim kanal\u0131ndan olu\u015fan toplam 12.150 metrelik iletim hatt\u0131 ile y\u00fckleme havuzuna, oradan da 1600 m. uzunlu\u011funda 1,80 m. \u00e7ap\u0131nda cebri boru ile Sineber derenin 1185 m. nehir kotunda yer alan Il\u0131su Hidroelektrik Santraline iletilecek.<\/p>\n<p>Santral 54,07MWm \/ 52,45 MWe kurulu g\u00fcc\u00fcnde olup, 2 adet d\u00fc\u015fey pelton tipi t\u00fcrbin ile donat\u0131lacak.<\/p>\n<p>Optimizasyon \u00e7al\u0131\u015fmalar\u0131 sonucunda belirlenen proje dizayn debisi 14 m3\/s olup, Santral\u2019de 25,444 GWh\u2019i g\u00fcvenilir, 117,695 GWh\u2019i sekonder olmak \u00fczere y\u0131lda toplam 143,139 GWh enerji \u00fcretilecek.<\/p>\n<p>Proje kapsam\u0131nda HES projesi in\u015faat\u0131nda kullan\u0131lmak \u00fczere kaya malzeme sahas\u0131 belirlendi. Ayr\u0131ca, faaliyet kapsam\u0131nda K\u0131rma-Y\u0131kama-Eleme Tesisi ve ihtiya\u00e7 duyulan beton \u00fcretiminin yap\u0131laca\u011f\u0131 Beton Santrali de proje dahilinde \u00f6ng\u00f6r\u00fcld\u00fc.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/konuklu-enerjiden-siirte-hes-yatirimi_5478.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Konuklu Enerji Elektrik. \u00dcretim. A.\u015e., Siirt\u2019in Pervari il\u00e7esine 54 MW\u2019l\u0131k Il\u0131su Reg\u00fclat\u00f6r\u00fc ve HES Projesini kurmak \u00fczere \u00e7al\u0131\u015fmalara ba\u015flad\u0131. PROJE \u0130\u00c7\u0130N \u00c7ED S\u00dcREC\u0130 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":17197,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[2878,4275,63,67,1009,165,35370,6979,1090,10107,10106,10108,5196],"views":929,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17196"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=17196"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17196\/revisions"}],"predecessor-version":[{"id":17198,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/17196\/revisions\/17198"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/17197"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=17196"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=17196"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=17196"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}