{"id":171305,"date":"2023-03-18T13:21:55","date_gmt":"2023-03-18T10:21:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=171305"},"modified":"2023-03-18T13:21:55","modified_gmt":"2023-03-18T10:21:55","slug":"teias-kapasite-tahsisleri-ile-ilgili-duyuru-yayinladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teias-kapasite-tahsisleri-ile-ilgili-duyuru-yayinladi\/","title":{"rendered":"(Turkish) &#8217;TE\u0130A\u015e&#8217; Kapasite Tahsisleri \u0130le \u0130lgili Duyuru Yay\u0131nlad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/171305\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>T\u00fcrkiye Elektrik \u0130letim A\u015e (TE\u0130A\u015e), T.C. Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK) taraf\u0131ndan al\u0131nan, 16.03.2023 tarihli ve 11731 say\u0131l\u0131 Karar\u0131 do\u011frultusunda, kapasite tahsisleri ile ilgili duyuru yay\u0131nlad\u0131. S\u00f6z konusu Kurul Karar\u0131 ve bu do\u011frultuda TE\u0130A\u015e taraf\u0131ndan haz\u0131rlanan b\u00f6lgesel kapasiteler a\u00e7\u0131kland\u0131.<\/strong><\/h2>\n<p>EPDK\u2019n\u0131n Kurul Karar\u0131 do\u011frultusunda, TE\u0130A\u015e taraf\u0131ndan haz\u0131rlanan b\u00f6lgesel kapasiteler \u015f\u00f6yle:<\/p>\n<p>1-ANA KAYNA\u011eI R\u00dcZGAR VEYA G\u00dcNE\u015e OLAN PROJE VEYA TES\u0130SLER \u0130LE YARDIMCI KAYNA\u011eI R\u00dcZGAR VEYA G\u00dcNE\u015e OLMAYAN PROJE VEYA TES\u0130SLER HAR\u0130\u00c7 B\u0130RDEN \u00c7OK KAYNAKLI ELEKTR\u0130K \u00dcRET\u0130M TES\u0130S\u0130NE D\u00d6N\u00dc\u015e\u00dcM TALEP ED\u0130LEN PROJE VEYA TES\u0130SLER \u0130\u00c7\u0130N KAPAS\u0130TELER (MW):\u00a0<strong>1038, 5 MW<\/strong><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-171311 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/01-4.jpg\" alt=\"\" width=\"550\" height=\"287\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/01-4.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/01-4-300x157.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/01-4-500x261.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/01-4-80x42.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>2-ELEKTR\u0130K P\u0130YASASINDA L\u0130SANSSIZ ELEKTR\u0130K \u00dcRET\u0130M Y\u00d6NETMEL\u0130\u011e\u0130\u2019N\u0130N MADDE-5 (1-h) H\u00dcKM\u00dc KAPSAMINDA \u0130LET\u0130M SEV\u0130YES\u0130NDEN S\u0130STEME BA\u011eLANACAK \u00dcRET\u0130M TES\u0130S\u0130 TALEPLER\u0130 \u0130\u00c7\u0130N KAPAS\u0130TELER (MW):\u00a0<strong>2377,11 MW<\/strong><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-171312\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/02-2.jpg\" alt=\"\" width=\"550\" height=\"303\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/02-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/02-2-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/02-2-500x275.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/02-2-80x44.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>3-ANA KAYNA\u011eI R\u00dcZGAR VEYA G\u00dcNE\u015e ENERJ\u0130S\u0130 OLAN \u00dcRET\u0130M L\u0130SANSI SAH\u0130PLER\u0130 TARAFINDAN YAPILACAK ELEKTR\u0130KSEL G\u00dc\u00c7 ARTI\u015e TALEPLER\u0130 \u0130\u00c7\u0130N KAPAS\u0130TELER (MW):\u00a0<strong>175 MW<\/strong><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-171313\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/03-1.jpg\" alt=\"\" width=\"550\" height=\"322\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/03-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/03-1-300x176.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/03-1-500x293.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/03-1-80x47.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p><strong>TE\u0130A\u015e\u2019\u0131n kapasite tahsisleri duyurusuna ula\u015fmak i\u00e7in <a href=\"https:\/\/www.teias.gov.tr\/duyurular\/kapasite-tahsisleri-hakkinda-duyuru-znjn\" target=\"_blank\" rel=\"noopener\">T\u0131klay\u0131n&gt;&gt;<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik \u0130letim A\u015e (TE\u0130A\u015e), T.C. Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK) taraf\u0131ndan al\u0131nan, 16.03.2023 tarihli ve 11731 say\u0131l\u0131 Karar\u0131 do\u011frultusunda, kapasite tahsisleri [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":171315,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[55157,7693,101541,1582],"views":106,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/171305"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=171305"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/171305\/revisions"}],"predecessor-version":[{"id":171306,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/171305\/revisions\/171306"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/171315"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=171305"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=171305"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=171305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}