{"id":170921,"date":"2023-03-13T14:02:45","date_gmt":"2023-03-13T11:02:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=170921"},"modified":"2023-03-13T14:05:04","modified_gmt":"2023-03-13T11:05:04","slug":"hascelik-kablo-elektrik-ihtiyacini-gunes-enerjisinden-karsilayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hascelik-kablo-elektrik-ihtiyacini-gunes-enerjisinden-karsilayacak\/","title":{"rendered":"(Turkish) &#8217;Has\u00e7elik Kablo&#8217; Elektrik \u0130htiyac\u0131n\u0131 G\u00fcne\u015f Enerjisinden Kar\u015f\u0131layacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/170921\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Has\u00e7elik Kablo taraf\u0131ndan elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak \u00fczere 265 milyon TL yat\u0131r\u0131m ile Kayseri\u2019de 15 MW kurulu <img loading=\"lazy\" class=\"alignright wp-image-170926\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/hascelik-kablo-elektrik-ihtiyacini-gunes-enerjisinden-karsilayacak.jpg\" alt=\"\" width=\"320\" height=\"204\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/hascelik-kablo-elektrik-ihtiyacini-gunes-enerjisinden-karsilayacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/hascelik-kablo-elektrik-ihtiyacini-gunes-enerjisinden-karsilayacak-300x191.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/hascelik-kablo-elektrik-ihtiyacini-gunes-enerjisinden-karsilayacak-500x318.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/hascelik-kablo-elektrik-ihtiyacini-gunes-enerjisinden-karsilayacak-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>g\u00fcce sahip g\u00fcne\u015f enerji santrali kurulacak.<\/h2>\n<p><strong>Has\u00e7elik Kablo<\/strong> taraf\u0131ndan Kayseri&#8217;nin Kocasinan \u0130l\u00e7esinde 15 MW kurulu g\u00fc\u00e7te G\u00fcne\u015f Enerji Santrali (GES) kurulup i\u015fletilmesi planlan\u0131yor. Projenin yat\u0131r\u0131m bedelinin<strong> 265 milyon TL<\/strong>\u2019nin \u00fczerinde olaca\u011f\u0131 tahmin ediliyor.<\/p>\n<p>Yakla\u015f\u0131k olarak <strong>177 bin metrekarelik<\/strong><em> tarla vas\u0131fl\u0131 alanda<\/em> kurulacak santralde <strong>33.027 adet<\/strong> fotovoltaik panel ve inverterler kullan\u0131lacak olup santralde \u00fcretilecek elektrik, trafolar ile orta gerilim seviyesine y\u00fckseltilerek da\u011f\u0131t\u0131m \u015firketine ait en yak\u0131n hatlara ba\u011flanarak sisteme aktar\u0131lacak. \u00dcretilen enerji ise kurulu\u015fun \u00fcretim faaliyetlerinin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamada kullan\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Has\u00e7elik Kablo taraf\u0131ndan elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak \u00fczere 265 milyon TL yat\u0131r\u0131m ile Kayseri\u2019de 15 MW kurulu g\u00fcce sahip g\u00fcne\u015f enerji santrali kurulacak. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":170926,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[2326,2206,431,2401,108237,1039,25176],"views":113,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/170921"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=170921"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/170921\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/170926"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=170921"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=170921"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=170921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}