{"id":170816,"date":"2023-03-12T13:34:42","date_gmt":"2023-03-12T10:34:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=170816"},"modified":"2023-03-12T13:49:44","modified_gmt":"2023-03-12T10:49:44","slug":"ruppur-ngs-nin-1inci-guc-unitesine-nakliye-kilidi-kuruldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruppur-ngs-nin-1inci-guc-unitesine-nakliye-kilidi-kuruldu\/","title":{"rendered":"(Turkish) &#8217;Ruppur NGS&#8217;nin 1&#8217;inci G\u00fc\u00e7 \u00dcnitesine Nakliye Kilidi Kuruldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/170816\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom\u2019un in\u015fa etti\u011fi Banglade\u015f\u2019teki Ruppur (Rooppur) N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1\u2019inci G\u00fc\u00e7 \u00dcnitesi\u2019ndeki reakt\u00f6r binas\u0131n\u0131n nakliye kilit montaj\u0131 tamamland\u0131.<\/h2>\n<p>Rosatom\u2019un m\u00fchendislik biriminden yap\u0131lan a\u00e7\u0131klamaya g\u00f6re nakliye kilidi, NGS sahas\u0131ndaki en b\u00fcy\u00fck ekipman olma \u00f6zelli\u011fi ta\u015f\u0131yor. Uzunlu\u011fu <strong>12,7 metre<\/strong>, geni\u015fli\u011fi <strong>10 metre<\/strong> ve a\u011f\u0131rl\u0131\u011f\u0131 <strong>235 ton<\/strong> olan <img loading=\"lazy\" class=\"alignright wp-image-170819\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/ruppur-ngs-nin-1inci-guc-unitesine-nakliye-kilidi-kuruldu.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/ruppur-ngs-nin-1inci-guc-unitesine-nakliye-kilidi-kuruldu.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/ruppur-ngs-nin-1inci-guc-unitesine-nakliye-kilidi-kuruldu-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/ruppur-ngs-nin-1inci-guc-unitesine-nakliye-kilidi-kuruldu-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/ruppur-ngs-nin-1inci-guc-unitesine-nakliye-kilidi-kuruldu-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/ruppur-ngs-nin-1inci-guc-unitesine-nakliye-kilidi-kuruldu-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>nakliye kilidiyle n\u00fckleer yak\u0131t tesise y\u00fcklenip bo\u015falt\u0131labiliyor. Bu sayede NGS\u2019nin in\u015faat a\u015famalar\u0131nda 1\u2019inci ve 2\u2019nci s\u0131n\u0131f ekipmanlar teslim edilebiliyor.<\/p>\n<p>NGS i\u015fletmeye al\u0131nd\u0131ktan sonra yak\u0131t sim\u00fclat\u00f6rleri kilit arac\u0131l\u0131\u011f\u0131yla teslim edilecek ve reakt\u00f6r\u00fcn tam bak\u0131m\u0131 yap\u0131lacak.<\/p>\n<p>Rosatom\u2019un m\u00fchendislik birimi ASE A.\u015e\u2019nin Ruppur N\u00fckleer G\u00fc\u00e7 Santrali \u0130n\u015faat Projesi\u2019nin Ba\u015fkan Yard\u0131mc\u0131s\u0131 Aleksey Deriy konuya ili\u015fkin olarak \u015funlar\u0131 belirtti: \u201cNakliye kilidinin tasar\u0131m konumuna yerle\u015ftirilmesi, reakt\u00f6r binas\u0131ndaki in\u015faat \u00e7al\u0131\u015fmalar\u0131n\u0131n tamamlanmas\u0131 i\u00e7in \u00f6nemli bir a\u015famay\u0131 te\u015fkil ediyor.\u201d<\/p>\n<p>Nakliye kilidinin montaj\u0131 ve ayarlanmas\u0131 ile ilgili di\u011fer \u00e7al\u0131\u015fmalar, 1\u2019inci \u00dcnite\u2019nin kubbesinin kurulmas\u0131ndan sonra ger\u00e7ekle\u015ftirilecek.<\/p>\n<h3><strong>2400 Mw Kapasiteli Ruppur NGS Rus Tasar\u0131m\u0131 ile \u0130n\u015fa Ediliyor<\/strong><\/h3>\n<p>Toplam 2400 MW kapasiteli iki<strong> VVER-1200<\/strong> reakt\u00f6r\u00fc ile donat\u0131lm\u0131\u015f <strong>Ruppur NGS<\/strong>, 25 Aral\u0131k 2015 tarihli Genel S\u00f6zle\u015fme gere\u011fince Banglade\u015f&#8217;in ba\u015fkenti Dakka&#8217;ya 160 km mesafede Rus tasar\u0131m\u0131 ile in\u015fa ediliyor. Banglade\u015f&#8217;teki ilk n\u00fckleer santral i\u00e7in Rusya\u2019daki Novovoronej NGS&#8217;nin iki \u00fcnitesinde ba\u015far\u0131yla uygulanan Rus tasar\u0131m\u0131 <strong>VVER-1200 tipi reakt\u00f6r<\/strong> se\u00e7ildi. Bu reakt\u00f6r, t\u00fcm uluslararas\u0131 g\u00fcvenlik gerekliliklerini tam olarak yerine getiren modern bir <strong>3+ Nesil tasar\u0131m<\/strong> olma \u00f6zelli\u011fi ta\u015f\u0131yor.<\/p>\n<p>ASE A.\u015e, end\u00fcstrinin \u00f6nde gelen \u015firketleri olan <strong>ASE EC A.\u015e, Atomenergoproekt A.\u015e (Moskova)<\/strong> ve <strong>ATOMPROEKT A.\u015e (St.-Petersburg)<\/strong> \u015firketlerinin i\u015f birli\u011fi ile kuruldu. M\u00fchendislik B\u00f6l\u00fcm\u00fc, sipari\u015f portf\u00f6y\u00fc ve d\u00fcnya genelinde e\u015f zamanl\u0131 olarak in\u015fa edilen NGS say\u0131s\u0131 bak\u0131m\u0131ndan d\u00fcnyada ilk s\u0131rada yer al\u0131yor. B\u00f6l\u00fcm\u00fcn gelirlerinin yakla\u015f\u0131k<strong> %80<\/strong>&#8216;i yabanc\u0131 projelerden sa\u011flan\u0131yor. <strong>M\u00fchendislik B\u00f6l\u00fcm\u00fc<\/strong>, Rusya&#8217;da ve d\u00fcnya genelinde <strong>y\u00fcksek kapasiteli NGS&#8217;ler i\u00e7in in\u015faat projeleri<\/strong> y\u00fcr\u00fct\u00fcyor. \u015eirket, proje y\u00f6netimi ve tasar\u0131m faaliyetleri de dahil olmak \u00fczere \u00e7ok <strong>\u00e7e\u015fitli EPC, EP, EPC(M) hizmetleri<\/strong> sunuyor ve <strong>karma\u015f\u0131k m\u00fchendislik tesislerinin y\u00f6netimi<\/strong> i\u00e7in \u00e7ok boyutlu teknolojileri geli\u015ftiriyor. S\u00f6z konusu birim, <strong>Rus n\u00fckleer end\u00fcstrisinin<\/strong> ba\u015far\u0131l\u0131 faaliyetlerinden ve yenilik\u00e7i en son teknolojilerden faydalan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom\u2019un in\u015fa etti\u011fi Banglade\u015f\u2019teki Ruppur (Rooppur) N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1\u2019inci G\u00fc\u00e7 \u00dcnitesi\u2019ndeki reakt\u00f6r binas\u0131n\u0131n nakliye kilit [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":170819,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[20625,108216,19356,2587,108215,108217],"views":33,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/170816"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=170816"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/170816\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/170819"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=170816"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=170816"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=170816"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}