{"id":170455,"date":"2023-03-07T09:17:03","date_gmt":"2023-03-07T06:17:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=170455"},"modified":"2023-03-07T09:17:20","modified_gmt":"2023-03-07T06:17:20","slug":"medigunes-hastanesinin-lisanssiz-gesi-uretime-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/medigunes-hastanesinin-lisanssiz-gesi-uretime-basladi\/","title":{"rendered":"(Turkish) Medig\u00fcne\u015f Hastanesi\u2019nin Lisanss\u0131z GES\u2019i \u00dcretime Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/170455\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><img loading=\"lazy\" class=\"alignright wp-image-170458\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/medigunes-hastanesinin-lisanssiz-gesi-uretime-basladi.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/medigunes-hastanesinin-lisanssiz-gesi-uretime-basladi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/medigunes-hastanesinin-lisanssiz-gesi-uretime-basladi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/medigunes-hastanesinin-lisanssiz-gesi-uretime-basladi-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/medigunes-hastanesinin-lisanssiz-gesi-uretime-basladi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/03\/medigunes-hastanesinin-lisanssiz-gesi-uretime-basladi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Salihli\u2019de yer alan Medig\u00fcne\u015f Hastanesi\u2019nin arazi tipi lisanss\u0131z GES\u2019i \u00fcretime ba\u015flad\u0131.<\/h2>\n<p>Manisa Salihli&#8217;de yer alan \u00d6zel Salihli G\u00fcven Sa\u011fl\u0131k Hizmetleri A\u015e\u2019ye ait <strong>Medig\u00fcne\u015f Hastanesi<\/strong>\u2019nin \u00f6zt\u00fcketim ama\u00e7l\u0131 kurdurdu\u011fu <strong>arazi tipi g\u00fcne\u015f enerjisi santrali (GES)<\/strong>, yetkili kurumlar\u0131n <strong>kabul i\u015flemlerini tamamlamas\u0131 sonras\u0131<\/strong>\u00a0elektrik \u00fcretimine ba\u015flad\u0131.<\/p>\n<p>Salihli G\u00fcven A\u015e, anahtar teslim arazi tipi lisanss\u0131z GES kurulumu i\u00e7in <strong>Naturel Yenilenebilir Enerji Ticaret A.\u015e<\/strong> ile <strong>774.084,60 dolar<\/strong> tutarl\u0131 s\u00f6zle\u015fme imzalam\u0131\u015ft\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Salihli\u2019de yer alan Medig\u00fcne\u015f Hastanesi\u2019nin arazi tipi lisanss\u0131z GES\u2019i \u00fcretime ba\u015flad\u0131. Manisa Salihli&#8217;de yer alan \u00d6zel Salihli G\u00fcven Sa\u011fl\u0131k Hizmetleri A\u015e\u2019ye ait [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":170458,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[56174,18,2569,45418,108082,108083,108084,69674],"views":80,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/170455"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=170455"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/170455\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/170458"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=170455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=170455"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=170455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}