{"id":169884,"date":"2023-02-25T13:48:12","date_gmt":"2023-02-25T10:48:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=169884"},"modified":"2023-02-25T13:55:46","modified_gmt":"2023-02-25T10:55:46","slug":"biotrendin-deprem-bolgesindeki-tesislerinde-bir-hasar-yok","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/biotrendin-deprem-bolgesindeki-tesislerinde-bir-hasar-yok\/","title":{"rendered":"(Turkish) Biotrend\u2019in Deprem B\u00f6lgesindeki Tesislerinde Bir Hasar Yok"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/169884\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Biotrend taraf\u0131ndan deprem b\u00f6lgesindeki tesislerinde hasar tespit \u00e7al\u0131\u015fmalar\u0131 tamamlan\u0131rken hasar tespit edilmezken b\u00f6lgedeki 3 tesis de faaliyetini s\u00fcrd\u00fcr\u00fcyor.<\/h2>\n<p><img loading=\"lazy\" class=\"alignright wp-image-169888\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/malatya-cop-gaz-elektrik-uretim-tesisi-11.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/malatya-cop-gaz-elektrik-uretim-tesisi-11.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/malatya-cop-gaz-elektrik-uretim-tesisi-11-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/malatya-cop-gaz-elektrik-uretim-tesisi-11-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/malatya-cop-gaz-elektrik-uretim-tesisi-11-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Biotrend \u00c7evre ve Enerji Yat\u0131r\u0131mlar\u0131 A.\u015e, <strong>deprem felaketi<\/strong> sonras\u0131nda b\u00f6lgedeki <strong>tesislerinin hasar tespit \u00e7al\u0131\u015fmalar\u0131n\u0131<\/strong> tamamlad\u0131.<\/p>\n<p>\u015eirketten yap\u0131lan a\u00e7\u0131klamada Biotrend\u2019in <strong>Malatya<\/strong> ve<strong> \u0130skenderun\u2019da<\/strong> yer alan tesislerinde herhangi bir <strong>can ve mal kayb\u0131 ya\u015fanmad\u0131\u011f\u0131<\/strong>, depremden kaynakl\u0131 <strong>bir hasar da olu\u015fmad\u0131\u011f\u0131<\/strong> bildirildi. Tesisler rutin \u00fcretim program\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamada, <em>\u201cDepremde hayat\u0131n\u0131 kaybeden vatanda\u015flar\u0131m\u0131za Allah&#8217;tan rahmet, yak\u0131nlar\u0131na ve milletimize ba\u015fsa\u011fl\u0131\u011f\u0131 diler, depremden etkilenen ve yaral\u0131 olan vatanda\u015flar\u0131m\u0131za acil \u015fifalar dileriz\u201d<\/em> ifadeleri kullan\u0131ld\u0131.<\/p>\n<p>Biotrend\u2019in Malatya\u2019da<strong> 2,4MWe<\/strong> kurulu g\u00fc\u00e7te <strong>Malatya Entegre \u00c7evre Tesisi Kat\u0131 At\u0131k Bertaraf ve D\u00fczenli Depolama Alan\u0131 Enerji \u00dcretim Tesisi<\/strong> ve <strong>2,82MWe<\/strong> kurulu g\u00fc\u00e7te <strong>Malatya 2 \u00c7\u00f6p Gaz Elektrik \u00dcretim Tesisi<\/strong> yer al\u0131yor. Kurulu\u015fun \u0130skenderun\u2019da da<strong> 4,2MWe<\/strong> kurulu g\u00fc\u00e7te <strong>\u00c7\u00f6p Gaz Elektrik \u00dcretim Tesisi<\/strong> \u00fcretimini s\u00fcrd\u00fcr\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Biotrend taraf\u0131ndan deprem b\u00f6lgesindeki tesislerinde hasar tespit \u00e7al\u0131\u015fmalar\u0131 tamamlan\u0131rken hasar tespit edilmezken b\u00f6lgedeki 3 tesis de faaliyetini s\u00fcrd\u00fcr\u00fcyor. Biotrend \u00c7evre ve Enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":169888,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[94715,86204,107649,24973,3489],"views":40,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/169884"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=169884"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/169884\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/169888"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=169884"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=169884"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=169884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}