{"id":169837,"date":"2023-02-24T16:35:08","date_gmt":"2023-02-24T13:35:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=169837"},"modified":"2023-02-24T16:41:22","modified_gmt":"2023-02-24T13:41:22","slug":"denizli-cimento-elektrik-ihtiyacini-kuracagi-gesten-karsilayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/denizli-cimento-elektrik-ihtiyacini-kuracagi-gesten-karsilayacak\/","title":{"rendered":"(Turkish) &#8217;Denizli \u00c7imento&#8217; Elektrik \u0130htiyac\u0131n\u0131 Kuraca\u011f\u0131 GES&#8217;ten Kar\u015f\u0131layacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/169837\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Denizli \u00c7imento taraf\u0131ndan elektrik ihtiyac\u0131n\u0131n kar\u015f\u0131lanmas\u0131 amac\u0131yla 376 milyon TL yat\u0131r\u0131m ile Denizli\u2019de g\u00fcne\u015f santrali kurulacak.<\/h2>\n<h2><img loading=\"lazy\" class=\"alignright wp-image-169840\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/denizli-cimento-elektrik-ihtiyacini-kuracagi-gesten-karsilayacak.jpg\" alt=\"\" width=\"320\" height=\"243\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/denizli-cimento-elektrik-ihtiyacini-kuracagi-gesten-karsilayacak.jpg 577w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/denizli-cimento-elektrik-ihtiyacini-kuracagi-gesten-karsilayacak-300x228.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/denizli-cimento-elektrik-ihtiyacini-kuracagi-gesten-karsilayacak-500x380.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/denizli-cimento-elektrik-ihtiyacini-kuracagi-gesten-karsilayacak-66x50.jpg 66w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/h2>\n<p><strong><a href=\"http:\/\/www.denizlicimento.com.tr\" target=\"_blank\" rel=\"nofollow noopener\">Denizli \u00c7imento San. T\u00fcrk A.\u015e.<\/a><\/strong> taraf\u0131ndan <strong>Denizli \u0130li, Honaz \u0130l\u00e7esi, Kakl\u0131k Mahallesi ve \u00c7al \u0130l\u00e7esi Belevi Mahallesi<\/strong> s\u0131n\u0131rlar\u0131 i\u00e7inde<strong>\u00a024 MWp<\/strong> kurulu g\u00fcce sahip <strong>G\u00fcne\u015f Enerjisi Santrali (GES)<\/strong> yat\u0131r\u0131m\u0131 planlan\u0131yor. Projenin yat\u0131r\u0131m tutar\u0131n\u0131n ise<strong> 376 milyon TL<\/strong> olaca\u011f\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p><strong>Hazine Arazisi<\/strong> ve <strong>Denizli \u00c7imento <\/strong>ad\u0131na<strong> kay\u0131tl\u0131 tapulu arazilerden<\/strong> olu\u015fan sahada <strong>kurulacak santralde<\/strong> \u00fcretilecek enerji <strong>Denizli \u00c7imento b\u00fcnyesinde kullan\u0131lacak<\/strong> olup <strong>ihtiya\u00e7 duyulmas\u0131 halinde<\/strong> ise<strong> piyasaya da sat\u0131\u015f yapabilecek.<\/strong><\/p>\n<p>Tesisin ekonomik \u00f6mr\u00fcn\u00fcn<strong> 25 y\u0131l<\/strong> olaca\u011f\u0131 tahmin edilirken <strong>her y\u0131l periyodik bak\u0131m \u00e7al\u0131\u015fmalar\u0131<\/strong> d\u00fczenli ger\u00e7ekle\u015ftirilerek gerekli revizeler de yap\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Denizli \u00c7imento taraf\u0131ndan elektrik ihtiyac\u0131n\u0131n kar\u015f\u0131lanmas\u0131 amac\u0131yla 376 milyon TL yat\u0131r\u0131m ile Denizli\u2019de g\u00fcne\u015f santrali kurulacak. Denizli \u00c7imento San. T\u00fcrk A.\u015e. taraf\u0131ndan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":169840,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[107902,845,13801,68,2326,13,2569,107901,67694],"views":83,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/169837"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=169837"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/169837\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/169840"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=169837"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=169837"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=169837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}