{"id":169506,"date":"2023-02-20T13:13:27","date_gmt":"2023-02-20T10:13:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=169506"},"modified":"2023-02-20T13:16:32","modified_gmt":"2023-02-20T10:16:32","slug":"oyak-cimento-adana-ya-gunes-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/oyak-cimento-adana-ya-gunes-santrali-kuracak\/","title":{"rendered":"(Turkish) &#8217;Oyak \u00c7imento&#8217; Adana\u2019ya G\u00fcne\u015f Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/169506\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Oyak \u00c7imento, Adana\u2019n\u0131n Y\u00fcre\u011fir il\u00e7esinde 54 MWm kurulu g\u00fcc\u00fcnde g\u00fcne\u015f enerji santrali kurarak elektrik <img loading=\"lazy\" class=\"alignright wp-image-169511\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/oyak-cimento-adana-ya-gunes-santrali-kuracak.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/oyak-cimento-adana-ya-gunes-santrali-kuracak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/oyak-cimento-adana-ya-gunes-santrali-kuracak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/oyak-cimento-adana-ya-gunes-santrali-kuracak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/oyak-cimento-adana-ya-gunes-santrali-kuracak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/oyak-cimento-adana-ya-gunes-santrali-kuracak-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ihtiyac\u0131n\u0131 g\u00fcne\u015ften kar\u015f\u0131layacak.<\/h2>\n<p><strong>Oyak \u00c7imento Fabrikalar\u0131 A.\u015e.<\/strong> taraf\u0131ndan <strong>Adana<\/strong> \u0130li, <strong>Y\u00fcre\u011fir \u0130l\u00e7esinde<\/strong> mevcut olarak i\u015fletti\u011fi <strong>1 MW<\/strong> kurulu g\u00fcc\u00fcndeki g\u00fcne\u015f enerji santralinin kapasitesini art\u0131rarak <strong>54 MWm<\/strong>\u2019a \u00e7\u0131karacak. Projenin de\u011feri yakla\u015f\u0131k <strong>843 milyon TL<\/strong> olarak hesaplan\u0131yor.<\/p>\n<p>Proje kapsam\u0131nda, mevcutta yer alan<strong> \u201cG\u00fcne\u015f Enerji Santrali\u201d<\/strong> dahil olmak kayd\u0131yla toplam<strong> 54 MWm<\/strong> elektrik enerjisi \u00fcretilecek. \u00dcretilecek <strong>elektrik enerjisi<\/strong> \u00f6ncelikle <strong>OYAK \u00c7imento Fabrikalar\u0131 A.\u015e.<\/strong> b\u00fcnyesinde kullan\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Oyak \u00c7imento, Adana\u2019n\u0131n Y\u00fcre\u011fir il\u00e7esinde 54 MWm kurulu g\u00fcc\u00fcnde g\u00fcne\u015f enerji santrali kurarak elektrik ihtiyac\u0131n\u0131 g\u00fcne\u015ften kar\u015f\u0131layacak. Oyak \u00c7imento Fabrikalar\u0131 A.\u015e. taraf\u0131ndan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":169511,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[80750,29013,2206,105759],"views":96,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/169506"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=169506"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/169506\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/169511"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=169506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=169506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=169506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}