{"id":169428,"date":"2023-02-18T12:46:15","date_gmt":"2023-02-18T09:46:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=169428"},"modified":"2023-02-18T12:47:15","modified_gmt":"2023-02-18T09:47:15","slug":"park-elektrik-uretim-faaliyetlerine-mart-ortasinda-baslanabilecegini-bildirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/park-elektrik-uretim-faaliyetlerine-mart-ortasinda-baslanabilecegini-bildirdi\/","title":{"rendered":"(Turkish) &#8217;Park Elektrik&#8217; \u00dcretim Faaliyetlerine Mart Ortas\u0131 Ba\u015flanabilece\u011fini Bildirdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/169428\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2 class=\"selectionShareable\">Park Elektrik \u00dcretim Madencilik Sanayi ve Ticaret A\u015e, Gaziantep&#8217;te bulunan maden sahalar\u0131ndaki elektrik \u00fcretim hatt\u0131na hen\u00fcz enerji verilemedi\u011fi, sahadaki \u00fcretim faaliyetlerine mart ay\u0131 ortas\u0131nda tekrar ba\u015flanabilece\u011fini bildirdi.<\/h2>\n<p class=\"selectionShareable\">\u015eirketin, <strong>Gaziantep&#8217;in \u0130slahiye<\/strong> il\u00e7esindeki <strong>madencilik faaliyetlerine<\/strong> ili\u015fkin yapt\u0131\u011f\u0131 a\u00e7\u0131klama, <img loading=\"lazy\" class=\"alignright wp-image-169430\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/park-elektrik-uretim-faaliyetlerine-mart-ortasinda-baslanabilecegini-bildirdi.jpg\" alt=\"\" width=\"320\" height=\"252\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/park-elektrik-uretim-faaliyetlerine-mart-ortasinda-baslanabilecegini-bildirdi.jpg 400w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/park-elektrik-uretim-faaliyetlerine-mart-ortasinda-baslanabilecegini-bildirdi-300x236.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/park-elektrik-uretim-faaliyetlerine-mart-ortasinda-baslanabilecegini-bildirdi-63x50.jpg 63w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Kamuyu Ayd\u0131nlatma Platformu&#8217;nda (KAP) yay\u0131mland\u0131.<\/p>\n<p class=\"selectionShareable\">A\u00e7\u0131klamada, \u015firketin i\u015fletme ruhsat\u0131 sahibi bulundu\u011fu \u0130slahiye&#8217;deki <strong>boksit sahas\u0131ndaki<\/strong> \u00fcretim faaliyetlerine, Kahramanmara\u015f merkezli <strong>11 ili etkileyen depremler nedeniyle ara verildi\u011fi<\/strong> an\u0131msat\u0131ld\u0131.<\/p>\n<p class=\"selectionShareable\">B\u00f6lgede yap\u0131lan \u00f6n durum tespit \u00e7al\u0131\u015fmalar\u0131 neticesinde, <strong>maden sahas\u0131ndaki \u00e7al\u0131\u015fma b\u00f6lgeleri<\/strong> ile \u0130slahiye aras\u0131nda<strong> ula\u015f\u0131m\u0131n sa\u011flanabilmesi<\/strong> i\u00e7in y\u00fcr\u00fct\u00fclen<strong> onar\u0131m \u00e7al\u0131\u015fmalar\u0131n\u0131n<\/strong> tamamlanmak \u00fczere oldu\u011fu aktar\u0131lan a\u00e7\u0131klamada, <strong>en ge\u00e7 gelecek hafta ba\u015f\u0131 ula\u015f\u0131m yolunun kullan\u0131ma a\u00e7\u0131laca\u011f\u0131n\u0131n<\/strong> \u00f6ng\u00f6r\u00fcld\u00fc\u011f\u00fc bildirildi.<\/p>\n<p class=\"selectionShareable\">A\u00e7\u0131klamada, \u015fantiye b\u00f6lgesindeki binalarda ve tesisteki makine ve ekipmanlarda<strong> \u00f6nemlilik arz edecek bir hasar tespit edilemedi\u011fi<\/strong> vurgulanarak, &#8216;Maden sahas\u0131n\u0131n elektrik \u00fcretim hatt\u0131na hen\u00fcz enerji verilememekte olup, hatt\u0131n kontrol\u00fcne ve gerekli g\u00f6r\u00fclen onar\u0131m \u00e7al\u0131\u015fmalar\u0131na CTC Enerji Madencilik Sanayi ve Ticaret A\u015e taraf\u0131ndan ba\u015flanm\u0131\u015ft\u0131r.&#8217; denildi.<\/p>\n<p class=\"selectionShareable\">CTC Enerji yetkilileriyle yap\u0131lan g\u00f6r\u00fc\u015fmeler \u00e7er\u00e7evesinde, sahadaki \u00fcretim faaliyetlerine mart ay\u0131 ortas\u0131nda tekrar ba\u015flanabilece\u011finin de\u011ferlendirildi\u011fi ifade edilen a\u00e7\u0131klamada, <span style=\"text-decoration: underline;\">\u015funlar kaydedildi:<\/span><\/p>\n<p class=\"selectionShareable\"><em>&#8220;CTC Enerji&#8217;nin 27 Temmuz 2022&#8217;de ba\u015flam\u0131\u015f olan 4. r\u00f6dovans y\u0131l\u0131 i\u00e7in, r\u00f6dovans s\u00f6zle\u015fmesi gere\u011fi y\u0131ll\u0131k asgari \u00fcretim taahh\u00fcd\u00fc 1 milyon ton olup, deprem \u00f6ncesi s\u00f6z konusu taahh\u00fct seviyesi h\u00e2lihaz\u0131rda yakla\u015f\u0131k y\u00fczde 97 oran\u0131nda yakalanm\u0131\u015ft\u0131r. R\u00f6dovans s\u00f6zle\u015fmesi uyar\u0131nca m\u00fccbir sebep hali olan depremler nedeniyle, \u00fcretim faaliyetlerinde \u015fubat ve mart aylar\u0131nda ya\u015fanacak kay\u0131plar\u0131n da r\u00f6dovans y\u0131l\u0131n\u0131n geriye kalan aylar\u0131nda telafi edilebilece\u011fi ve 3. r\u00f6dovans y\u0131l\u0131nda ger\u00e7ekle\u015fen \u00fcretim seviyesine paralel olarak 4. r\u00f6dovans y\u0131l\u0131nda da yakla\u015f\u0131k 1,4-1,5 milyon ton \u00fcretime ula\u015f\u0131labilece\u011fi \u00f6ng\u00f6r\u00fclmektedir. Sahadaki \u00fcretim faaliyetlerinin seyrine dair gerekli a\u00e7\u0131klamalar yap\u0131lacakt\u0131r.&#8221;<\/em><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Park Elektrik \u00dcretim Madencilik Sanayi ve Ticaret A\u015e, Gaziantep&#8217;te bulunan maden sahalar\u0131ndaki elektrik \u00fcretim hatt\u0131na hen\u00fcz enerji verilemedi\u011fi, sahadaki \u00fcretim faaliyetlerine mart [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":169430,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[107789,107790,107791,15789,6638,33526,104123],"views":43,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/169428"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=169428"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/169428\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/169430"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=169428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=169428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=169428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}