{"id":169338,"date":"2023-02-17T09:58:09","date_gmt":"2023-02-17T06:58:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=169338"},"modified":"2023-02-17T10:00:56","modified_gmt":"2023-02-17T07:00:56","slug":"tupras-kirikkale-rafinerisinde-2931mwlik-ges-kurduruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tupras-kirikkale-rafinerisinde-2931mwlik-ges-kurduruyor\/","title":{"rendered":"(Turkish) &#8217;T\u00dcPRA\u015e&#8217; K\u0131r\u0131kkale Rafinerisi&#8217;nde 29,31MW\u2019l\u0131k GES Kurduruyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/169338\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00dcPRA\u015e K\u0131r\u0131kkale Rafinerisi&#8217;ne 29,31MW\u2019l\u0131k arazi tipi GES <img loading=\"lazy\" class=\"alignright wp-image-169340\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/tupras-kirikkale-rafinerisinde-2931mwlik-ges-kurduruyor.jpg\" alt=\"\" width=\"320\" height=\"273\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/tupras-kirikkale-rafinerisinde-2931mwlik-ges-kurduruyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/tupras-kirikkale-rafinerisinde-2931mwlik-ges-kurduruyor-300x256.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/tupras-kirikkale-rafinerisinde-2931mwlik-ges-kurduruyor-469x400.jpg 469w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/tupras-kirikkale-rafinerisinde-2931mwlik-ges-kurduruyor-59x50.jpg 59w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/tupras-kirikkale-rafinerisinde-2931mwlik-ges-kurduruyor-500x426.jpg 500w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kurduracak olup yap\u0131lacak i\u015fi Yeo Teknoloji \u00fcstlendi.<\/h2>\n<p>T\u00dcPRA\u015e T\u00fcrkiye Petrol Rafinerileri A.\u015e, K\u0131r\u0131kkale Rafinerisine kuraca\u011f\u0131 <strong>12,59MW<\/strong> g\u00fcc\u00fcndeki arazi tipi g\u00fcne\u015f santrali projesine (GES) <strong>16,72MW<\/strong> g\u00fcc\u00fcnde<strong> ilave GES mod\u00fcl\u00fc ekleyece\u011fini<\/strong> a\u00e7\u0131klad\u0131.<\/p>\n<p>Kurulacak arazi tipi anahtar teslim <strong>GES projesi<\/strong> i\u00e7in <strong>Yeo<\/strong> ile KDV hari\u00e7 <strong>12.026.364 dolar + 6.000.000 lira<\/strong> tutar\u0131nda s\u00f6zle\u015fme imzalayan T\u00dcPRA\u015e, ilave edilecek GES mod\u00fcl\u00fc i\u00e7in de <strong>15.831.193 dolar + 8.000.000 liral\u0131k<\/strong> ayr\u0131 bir s\u00f6zle\u015fme ger\u00e7ekle\u015ftirdi.<\/p>\n<p>B\u00f6ylece T\u00dcPRA\u015e K\u0131r\u0131kkale Rafinerisine kurulacak GES\u2019in toplam kurulu g\u00fcc\u00fc <strong>29,31MW <\/strong>olup\u00a0<strong>yat\u0131r\u0131m s\u00f6zle\u015fmesinin bedeli<\/strong> ise toplam da <strong>27.857.557 dolar + 14.000.000 lira<\/strong>&#8216;d\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00dcPRA\u015e K\u0131r\u0131kkale Rafinerisi&#8217;ne 29,31MW\u2019l\u0131k arazi tipi GES kurduracak olup yap\u0131lacak i\u015fi Yeo Teknoloji \u00fcstlendi. T\u00dcPRA\u015e T\u00fcrkiye Petrol Rafinerileri A.\u015e, K\u0131r\u0131kkale Rafinerisine kuraca\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":169340,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[56174,2326,7440,2569,48092,1000,96708],"views":260,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/169338"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=169338"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/169338\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/169340"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=169338"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=169338"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=169338"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}