{"id":168803,"date":"2023-02-08T11:34:37","date_gmt":"2023-02-08T08:34:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=168803"},"modified":"2023-02-08T12:32:31","modified_gmt":"2023-02-08T09:32:31","slug":"3-ilde-yer-alan-5-hastanede-enerji-verimliligi-projesi-uygulanacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/3-ilde-yer-alan-5-hastanede-enerji-verimliligi-projesi-uygulanacak\/","title":{"rendered":"(Turkish) 3 \u0130lde Yer Alan 5 Hastanede Enerji Verimlili\u011fi Projesi Uygulanacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/168803\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>\u00c7evre Bakanl\u0131\u011f\u0131 KABEV Projesi kapsam\u0131nda Kocaeli, Zonguldak ve Sakarya\u2019daki 5 kamu hastanesi binas\u0131nda enerji verimlili\u011fi projesi uygulama i\u015fi yapt\u0131racak.<\/h2>\n<p><strong>\u00c7evre \u015eehircilik ve \u0130klim De\u011fi\u015fikli\u011fi Bakanl\u0131\u011f\u0131<\/strong>, Yap\u0131 \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Kamu Binalar\u0131nda Enerji Verimlili\u011fi (KABEV) Projesi kapsam\u0131nda Kocaeli\u2019nde bulunan 92.720m<sup>2<\/sup> kapal\u0131 alana sahip Kocaeli \u00dcniversitesi Hastanesi ve 10.004m<sup>2<\/sup> kapal\u0131 alan\u0131 bulunan Kand\u0131ra Eczac\u0131 M. Kaz\u0131m Din\u00e7 Devlet <img loading=\"lazy\" class=\"alignright wp-image-168806\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/3-ildeki-5-hastanede-enerji-verimliligi-projesi-uygulanacak.jpg\" alt=\"\" width=\"320\" height=\"228\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/3-ildeki-5-hastanede-enerji-verimliligi-projesi-uygulanacak.jpg 682w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/3-ildeki-5-hastanede-enerji-verimliligi-projesi-uygulanacak-300x214.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/3-ildeki-5-hastanede-enerji-verimliligi-projesi-uygulanacak-500x356.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/02\/3-ildeki-5-hastanede-enerji-verimliligi-projesi-uygulanacak-70x50.jpg 70w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Hastanesi; Zonguldak\u2019ta bulunan 55.772,51m<sup>2<\/sup>\u00a0kapal\u0131 alana sahip Karadeniz Ere\u011fli Devlet Hastanesi; Sakarya\u2019da bulunan 16.095m<sup>2<\/sup> kapal\u0131 alan\u0131 olan Hendek Devlet Hastanesi ile yine Sakarya\u2019daki 13.549m<sup>2<\/sup> kapal\u0131 alana sahip Karasu Devlet Hastanesi olmak \u00fczere 5 kamu hastanesinin enerji verimlili\u011fi tadilat\u0131 proje ve uygulama i\u015flerini; D\u00fcnya Bankas\u0131 sat\u0131n alma esas ve usulleri do\u011frultusunda, ulusal rekabet\u00e7i ihale y\u00f6ntemi ve kapal\u0131 zarf usul\u00fcyle ihale edecek.<\/p>\n<p>Teklif sahiplerinin, Kocaeli \u00dcniversitesi Hastanesi ve Kand\u0131ra Eczac\u0131 M. Kaz\u0131m Din\u00e7 Devlet Hastanesi i\u00e7in 6.000.000 lira veya 300.000 dolar; Karadeniz Ere\u011fli Devlet Hastanesi i\u00e7in 2.000.000 lira veya 100.000 dolar; Hendek Devlet Hastanesi i\u00e7in 1.000.000 lira veya 50.000 dolar ve Karasu Devlet Hastanesi i\u00e7in de 1.000.000 lira veya 50.000 dolar <strong>ge\u00e7ici teminat vermeleri<\/strong> gerekecek.<\/p>\n<p>\u0130hale kapsam\u0131nda enerji verimlili\u011fi projesi uygulanacak olan kamu hastanelerinin toplam y\u00fcz\u00f6l\u00e7\u00fcm\u00fc 188.140,51m<sup>2<\/sup> olacak. Ayr\u0131ca her <strong>5 proje de<\/strong> \u015fartname gere\u011fi <strong>8 ay i\u00e7inde<\/strong> tamamlanacak.<\/p>\n<p>Teklif Sahipleri ihtiya\u00e7 duyduklar\u0131 ilave bilgileri ve ihale dok\u00fcmanlar\u0131n\u0131 Yap\u0131 \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc (Y\u0130GM), D\u0131\u015f Kaynakl\u0131 Yat\u0131r\u0131mlar Daire Ba\u015fkanl\u0131\u011f\u0131, Mustafa Kemal Mahallesi, 2082. Cadde, No: 52, \u00c7ankaya, Ankara adresinde veya <strong><a href=\"https:\/\/www.kabev.org\/\" target=\"_blank\" rel=\"nofollow noopener\">KABEV\u2019e ait web sitesini<\/a><\/strong> ziyaret ederek inceleyebilecekler.<\/p>\n<p>Tekliflerin en ge\u00e7 <strong>21 Mart 2023<\/strong> g\u00fcn\u00fc saat <strong>15.00\u2019e<\/strong> kadar; Yap\u0131 \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc (Y\u0130GM), D\u0131\u015f Kaynakl\u0131 Yat\u0131r\u0131mlar Daire Ba\u015fkanl\u0131\u011f\u0131, Mustafa Kemal Mahallesi, 2082. Cadde, No: 52, \u00c7ankaya, Ankara adresine teslim edilmesi gerekiyor. Elektronik tekliflere izin verilmeyecek.<\/p>\n<p>Teklifler Yap\u0131 \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn adresinde Teklif Sahibi temsilcilerinin ve kat\u0131lmak isteyebilecek ba\u015fka taraflar\u0131n huzurunda, <strong>21 Mart 2023<\/strong> tarihinde <strong>saat 15.10<\/strong>\u2019da a\u00e7\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7evre Bakanl\u0131\u011f\u0131 KABEV Projesi kapsam\u0131nda Kocaeli, Zonguldak ve Sakarya\u2019daki 5 kamu hastanesi binas\u0131nda enerji verimlili\u011fi projesi uygulama i\u015fi yapt\u0131racak. \u00c7evre \u015eehircilik ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":168806,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,52],"tags":[63,12,107624,103027,1254,2241,2841],"views":84,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/168803"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=168803"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/168803\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/168806"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=168803"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=168803"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=168803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}