{"id":168162,"date":"2023-01-29T17:55:28","date_gmt":"2023-01-29T14:55:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=168162"},"modified":"2023-01-29T17:55:28","modified_gmt":"2023-01-29T14:55:28","slug":"ford-otosan-enerjisi-ni-burdur-daki-gunes-santrali-nden-karsilayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ford-otosan-enerjisi-ni-burdur-daki-gunes-santrali-nden-karsilayacak\/","title":{"rendered":"(Turkish) Ford Otosan Enerjisini Burdur&#8217;daki G\u00fcne\u015f Santralinden Kar\u015f\u0131layacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/168162\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Ford Otosan taraf\u0131ndan iklim hedefleri kapsam\u0131nda Burdur\u2019da 50 MWm kurulu g\u00fc\u00e7te G\u00fcne\u015f Enerji Santrali <img loading=\"lazy\" class=\"alignright wp-image-168170\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ford-otosan-enerjisi-ni-burdur-daki-gunes-santrali-nden-karsilayacak.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ford-otosan-enerjisi-ni-burdur-daki-gunes-santrali-nden-karsilayacak.jpg 665w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ford-otosan-enerjisi-ni-burdur-daki-gunes-santrali-nden-karsilayacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ford-otosan-enerjisi-ni-burdur-daki-gunes-santrali-nden-karsilayacak-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ford-otosan-enerjisi-ni-burdur-daki-gunes-santrali-nden-karsilayacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ford-otosan-enerjisi-ni-burdur-daki-gunes-santrali-nden-karsilayacak-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>(GES) kurularak i\u015fletilecek.<\/h2>\n<p>Amerikan otomotiv \u015firketi <strong>Ford<\/strong> ve <strong>Ko\u00e7 Holding<\/strong> ortakl\u0131\u011f\u0131 olan <strong><a href=\"https:\/\/fordotosan.com.tr\/tr\" target=\"_blank\" rel=\"nofollow noopener\">Ford Otomotiv San. A.\u015e.<\/a><\/strong>&#8216;nin Burdur \u0130li, Merkez \u0130l\u00e7esi, Bo\u011fazi\u00e7i K\u00f6y\u00fc ve \u00c7all\u0131ca K\u00f6y\u00fc s\u0131n\u0131rlar\u0131nda <strong>50 MWm<\/strong> kurulu g\u00fcc\u00fcnde <strong>G\u00fcne\u015f Enerji Santrali (GES)<\/strong> kurulacak. <strong>40,29 hektarl\u0131k<\/strong> alanda ger\u00e7ekle\u015ftirilmesi planlanan projenin yat\u0131r\u0131m bedeli ise <strong>422 milyon TL<\/strong> olaca\u011f\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Projeyle fotovoltaik g\u00fcne\u015f teknolojisi kullan\u0131larak enerji \u00fcretilecek olup Santralde <strong>56 bin 800 adet<\/strong> g\u00fcne\u015f paneli ve <strong>10 adet<\/strong> inverter kullan\u0131lacak. Santralin i\u015fletmeye al\u0131nmas\u0131yla ekonomik \u00f6mr\u00fc <strong>30 y\u0131l<\/strong> olacak olup <strong>4-5 sene<\/strong> <strong>i\u00e7erisinde de<\/strong> yat\u0131r\u0131m\u0131n <strong>geri d\u00f6n\u00fc\u015f\u00fcm s\u00fcresi<\/strong> olacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ford Otosan taraf\u0131ndan iklim hedefleri kapsam\u0131nda Burdur\u2019da 50 MWm kurulu g\u00fc\u00e7te G\u00fcne\u015f Enerji Santrali (GES) kurularak i\u015fletilecek. Amerikan otomotiv \u015firketi Ford ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":168170,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[4100,68,25153,2326,13,2569,1609,6854,3504],"views":184,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/168162"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=168162"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/168162\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/168170"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=168162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=168162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=168162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}