{"id":167788,"date":"2023-01-24T10:48:16","date_gmt":"2023-01-24T07:48:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=167788"},"modified":"2023-01-24T10:57:50","modified_gmt":"2023-01-24T07:57:50","slug":"ja-solar-arizonada-2gw-panel-uretim-tesisi-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ja-solar-arizonada-2gw-panel-uretim-tesisi-kuracak\/","title":{"rendered":"(Turkish) JA Solar Arizona\u2019da 2GW Panel \u00dcretim Tesisi Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/167788\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>JA Solar, ABD\u2019deki ilk panel \u00fcretim tesisini kurmay\u0131 planl\u0131yor. Phoenix, Arizona\u2019da yer alacak olan fabrika, <img loading=\"lazy\" class=\"alignright wp-image-167790\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ja-solar-arizonada-2gw-panel-uretim-tesisi-kuracak.jpg\" alt=\"\" width=\"320\" height=\"182\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ja-solar-arizonada-2gw-panel-uretim-tesisi-kuracak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ja-solar-arizonada-2gw-panel-uretim-tesisi-kuracak-300x170.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ja-solar-arizonada-2gw-panel-uretim-tesisi-kuracak-500x284.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/ja-solar-arizonada-2gw-panel-uretim-tesisi-kuracak-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>tamamen faaliyete ge\u00e7ti\u011finde y\u0131ll\u0131k 2GW \u00fcretim kapasitesine sahip olacak.<\/h2>\n<p>JA Solar, 2023 y\u0131l\u0131n\u0131n 4. \u00e7eyre\u011fine kadar faaliyete ge\u00e7mesi ve 600\u2019\u00fcn \u00fczerinde istihdam yaratmas\u0131 beklenen tesis in\u015faat\u0131 i\u00e7in \u015fimdiden yer kiralad\u0131. 60 milyon dolar yat\u0131r\u0131mla hayata ge\u00e7irilecek olan yeni tesis, ticari ve konut \u00e7at\u0131lar\u0131ndan \u015febeke \u00f6l\u00e7ekli g\u00fcne\u015f enerjisi santrallerine kadar t\u00fcm pazar segmentleri i\u00e7in <strong>g\u00fcne\u015f PV panelleri \u00fcretmek<\/strong> \u00fczere<strong> otomatik bir montaj hatt\u0131<\/strong> kullanacak.<\/p>\n<p><strong>JA Solar Ba\u015fkan\u0131 Aiqing Yang,<\/strong> <em>\u201cABD\u2019deki m\u00fc\u015fterilerimize JA Solar\u2019\u0131n y\u00fcksek performansl\u0131 PV \u00fcr\u00fcnlerine esneklik ve eri\u015fim kolayl\u0131\u011f\u0131 sa\u011flamak i\u00e7in Arizona\u2019da ABD\u2019nin ilk g\u00fcne\u015f paneli \u00fcretim tesisini kurabildi\u011fimiz i\u00e7in \u00e7ok heyecanl\u0131y\u0131z\u201d<\/em> ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. JA Solar, ABD\u2019deki ilk panel \u00fcretim tesisini kurmay\u0131 planl\u0131yor. Phoenix, Arizona\u2019da yer alacak olan fabrika, tamamen faaliyete ge\u00e7ti\u011finde y\u0131ll\u0131k 2GW \u00fcretim kapasitesine [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":167790,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[2206,8255,12408,107354],"views":55,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/167788"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=167788"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/167788\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/167790"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=167788"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=167788"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=167788"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}