{"id":167668,"date":"2023-01-21T14:50:28","date_gmt":"2023-01-21T11:50:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=167668"},"modified":"2023-01-21T14:52:18","modified_gmt":"2023-01-21T11:52:18","slug":"kalekim-yozgat-osbde-ve-balikesir-fabrikasinda-ges-kurulumu-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kalekim-yozgat-osbde-ve-balikesir-fabrikasinda-ges-kurulumu-yapacak\/","title":{"rendered":"(Turkish) &#8217;Kalekim&#8217; Yozgat OSB\u2019de ve Bal\u0131kesir Fabrikas\u0131nda GES Kurulumu Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/167668\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Kalekim taraf\u0131ndan Yozgat Yerk\u00f6y OSB\u2019deki arazilerinde ve Bal\u0131kesir fabrikas\u0131n\u0131n \u00e7at\u0131s\u0131na GES kurulacak.<\/h2>\n<h2><img loading=\"lazy\" class=\"alignright wp-image-167670\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/kalekim-yozgat-osbde-ve-balikesir-fabrikasinda-ges-kurulumu-yapacak.jpg\" alt=\"\" width=\"320\" height=\"209\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/kalekim-yozgat-osbde-ve-balikesir-fabrikasinda-ges-kurulumu-yapacak.jpg 958w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/kalekim-yozgat-osbde-ve-balikesir-fabrikasinda-ges-kurulumu-yapacak-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/kalekim-yozgat-osbde-ve-balikesir-fabrikasinda-ges-kurulumu-yapacak-768x503.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/kalekim-yozgat-osbde-ve-balikesir-fabrikasinda-ges-kurulumu-yapacak-500x327.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/kalekim-yozgat-osbde-ve-balikesir-fabrikasinda-ges-kurulumu-yapacak-76x50.jpg 76w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/h2>\n<p>Kalekim, Yozgat\u2019\u0131n Yerk\u00f6y il\u00e7esinde, Yerk\u00f6y Kale Seramik \u00d6zel OSB adresindeki 5 farkl\u0131 parselde 171.477,07m\u00b2 alan\u0131n 99.520,07m\u00b2&#8217;sinde <strong>5MWe<\/strong> ve Bal\u0131kesir fabrika \u00e7at\u0131s\u0131na da <strong>0,96MWe<\/strong> olmak \u00fczere toplam da<strong> 5,96 MWe<\/strong> g\u00fcce sahip g\u00fcne\u015f enerjisi santrali (GES) kurulumu yapacak.<\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamada GES yat\u0131r\u0131m\u0131n\u0131n <strong>artan do\u011fal gaz<\/strong> ve<strong> elektrik fiyatlar\u0131 do\u011frultusunda<\/strong>; hem <strong>maliyetleri d\u00fc\u015f\u00fcrmek<\/strong> hem de <strong>s\u00fcrd\u00fcr\u00fclebilirlik \u00e7al\u0131\u015fmalar\u0131<\/strong> kapsam\u0131nda \u00f6ncelikli olarak <strong>grup i\u00e7i ihtiyac\u0131 kar\u015f\u0131lamak amac\u0131yla<\/strong> yap\u0131laca\u011f\u0131 belirtildi.<\/p>\n<p>Alternatif teklifleri de dikkate almak suretiyle, <strong>\u015firket kaynaklar\u0131<\/strong> ve <strong>ye\u015fil finansman imkanlar\u0131<\/strong>n\u0131n de\u011ferlendirilece\u011fi kaydedilmi\u015f olup Kalekim\u2019in<strong> GES yat\u0131r\u0131m\u0131n\u0131n<\/strong> toplam tutar\u0131 <strong>6 milyon dolar\u0131<\/strong> bulacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Kalekim taraf\u0131ndan Yozgat Yerk\u00f6y OSB\u2019deki arazilerinde ve Bal\u0131kesir fabrikas\u0131n\u0131n \u00e7at\u0131s\u0131na GES kurulacak. Kalekim, Yozgat\u2019\u0131n Yerk\u00f6y il\u00e7esinde, Yerk\u00f6y Kale Seramik \u00d6zel OSB adresindeki [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":167670,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[3613,36606,2326,13,2569,2122,34017,107314,107313,1197],"views":177,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/167668"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=167668"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/167668\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/167670"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=167668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=167668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=167668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}