{"id":16737,"date":"2013-10-23T09:20:14","date_gmt":"2013-10-23T06:20:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=16737"},"modified":"2013-10-23T09:20:14","modified_gmt":"2013-10-23T06:20:14","slug":"fukusima-kazasinin-ardindan-avrupadaki-ilk-nukleer-santral-projesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/fukusima-kazasinin-ardindan-avrupadaki-ilk-nukleer-santral-projesi\/","title":{"rendered":"(Turkish) Fuku\u015fima Kazas\u0131n\u0131n Ard\u0131ndan Avrupa\u2019daki \u0130lk N\u00fckleer Santral Projesi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/16737\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Fuku\u015fima kazas\u0131ndan sonra n\u00fckleer enerjiye s\u0131rt \u00e7eviren Avrupa \u00e7ark etti. K\u0131tan\u0131n \u00fc\u00e7\u00fcnc\u00fc b\u00fcy\u00fck ekonomisi \u0130ngiltere son iki y\u0131l\u0131n ilk n\u00fckleer santral anla\u015fmas\u0131n\u0131 imzalad\u0131.<\/strong><\/p>\n<p>\u0130ngiltere, Japonya\u2019da ya\u015fanan Fukushima n\u00fckleer santral kazas\u0131ndan bu yana Avrupa\u2019da ilk n\u00fckleer santral in\u015faat\u0131 i\u00e7in Frans\u0131z EDF \u015firketiyle 16 milyon sterlin (25.9 milyar dolar) tutar\u0131nda anla\u015fma imzalad\u0131. Anla\u015fmayla Fransa\u2019n\u0131n kamu enerji kurulu\u015fu EDF, bir \u00c7inli grupla birlikte bir konsorsiyumun ba\u015fkanl\u0131\u011f\u0131n\u0131 yapacak. Proje, Avrupa Bas\u0131n\u00e7l\u0131 Su Reakt\u00f6r\u00fc (EPR) ad\u0131 verilen tesislerden iki adet kurulmas\u0131n\u0131 kaps\u0131yor.<\/p>\n<p>Reakt\u00f6rler \u0130ngiltere\u2019nin g\u00fcneybat\u0131<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/nukleer-santral-23-505x384.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-7506\" title=\"nukleer-santral\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/nukleer-santral-23-505x384-300x228.jpg\" alt=\"\" width=\"300\" height=\"228\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/nukleer-santral-23-505x384-300x228.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/nukleer-santral-23-505x384-500x380.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/nukleer-santral-23-505x384-65x50.jpg 65w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/nukleer-santral-23-505x384.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>s\u0131ndaki Somerset b\u00f6lgesindeki Hinkley Point C n\u00fckleer tesisinde kurulacak. Anla\u015fma uyar\u0131nca, EDF\u2019nin ba\u015fka projelerde de orta\u011f\u0131 olan China General Nuclear Power Group (CGN) muhtemelen China National Nuclear Corporation (CNNC) ile birlikte konsorsiyumda y\u00fczde 30 ila 40 aras\u0131nda pay sahibi olacak. Frans\u0131z Areva ise ayr\u0131ca y\u00fczde 10 hisse alacak.<\/p>\n<p>Anla\u015fma tesislerin i\u015fletmeye a\u00e7\u0131lmas\u0131ndan itibaren 35 y\u0131l s\u00fcreli olacak. \u0130ngiliz projesinin, Japonya\u2019daki Fukushima n\u00fckleer enerji santralinde 2011 y\u0131l\u0131nda meydana gelen kazadan bu yana \u00e7ok say\u0131da projenin iptal edilmesinden olumsuz etkilenen global n\u00fckleer sanayini desteklemesi bekleniyor.<\/p>\n<p>Akkuyu N\u00fckleer Santral\u0131 (NGS) Elektrik A\u015e Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Rauf Kasumov, \u201c\u00c7ED olumlu\u201d karar\u0131n\u0131n y\u0131l sonu-yeni y\u0131l\u0131n ba\u015flar\u0131 gibi olu\u015fabilece\u011fini belirterek, \u201cBaz\u0131 hususlar\u0131 g\u00f6z \u00f6n\u00fcnde bulundurarak 9 ay de\u011fil de bir sene gibi bir ger\u00e7ekle\u015fme olabilir. Bunu d\u00fcnyadaki b\u00fct\u00fcn in\u015faat \u015firketleri yap\u0131yor. Dolay\u0131s\u0131yla santral\u0131n 4 \u00fcnitesini de 2023\u2019e kadar, cumhuriyetin 100 senesine kadar tamamlayaca\u011f\u0131m\u0131z\u0131 d\u00fc\u015f\u00fcn\u00fcyorum\u201d dedi.<\/p>\n<p>\u0130lk betonun 2016\u2019n\u0131n ba\u015f\u0131nda at\u0131laca\u011f\u0131n\u0131 s\u00f6yleyen Genel M\u00fcd\u00fcr Yard\u0131m\u0131c\u0131s\u0131 Kasumov \u201c2 y\u0131l sadece yer alt\u0131 \u00e7al\u0131\u015fmalar\u0131na ayr\u0131lacak\u201d diye konu\u015ftu. Kasumov \u0130lk a\u015famada yakla\u015f\u0131k 15 milyon metrek\u00fcp topra\u011f\u0131n ta\u015f\u0131naca\u011f\u0131n\u0131n da bilgisini verdi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/10\/22\/fukusima-kazasinin-ardindan-avrupadaki-ilk-nukleer-santral-projesi-ingilterede\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Fuku\u015fima kazas\u0131ndan sonra n\u00fckleer enerjiye s\u0131rt \u00e7eviren Avrupa \u00e7ark etti. K\u0131tan\u0131n \u00fc\u00e7\u00fcnc\u00fc b\u00fcy\u00fck ekonomisi \u0130ngiltere son iki y\u0131l\u0131n ilk n\u00fckleer santral anla\u015fmas\u0131n\u0131 imzalad\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7506,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[1964,9767,63,67,1009,165,9768,9769,1092,71,21,5081],"views":1310,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16737"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=16737"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16737\/revisions"}],"predecessor-version":[{"id":16738,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16737\/revisions\/16738"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/7506"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=16737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=16737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=16737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}