{"id":166356,"date":"2023-01-03T14:09:34","date_gmt":"2023-01-03T11:09:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=166356"},"modified":"2023-01-03T14:09:34","modified_gmt":"2023-01-03T11:09:34","slug":"akkuyu-ngsnin-1-inci-guc-unitesinde-ic-koruma-kabugu-montaji-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-1-inci-guc-unitesinde-ic-koruma-kabugu-montaji-tamamlandi\/","title":{"rendered":"(Turkish) Akkuyu NGS&#8217;nin 1. G\u00fc\u00e7 \u00dcnitesinde \u0130\u00e7 Koruma Kabu\u011fu Montaj\u0131 Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/166356\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1\u2019inci G\u00fc\u00e7 \u00dcnitesi\u2019nde i\u00e7 koruma kabu\u011funun (\u0130KK) kubbesi tasar\u0131m konumuna yerle\u015ftirilerek koruma d\u00f6ng\u00fcs\u00fc tamamland\u0131.<\/h2>\n<p>AKKUYU N\u00dcKLEER A.\u015e Genel M\u00fcd\u00fcr\u00fc Anastasia Zoteeva konuya ili\u015fkin \u015funlar\u0131 s\u00f6yledi: <em>&#8220;2022 zor bir y\u0131l olsa da \u00e7ok ba\u015far\u0131l\u0131 ve \u00fcretken ge\u00e7ti! Planland\u0131\u011f\u0131 gibi y\u0131lba\u015f\u0131 arifesinde 1\u2019inci G\u00fc\u00e7 \u00dcnitesinin in\u015fas\u0131nda \u00f6nemli bir a\u015fama olan i\u00e7 koruma kabu\u011fun kubbesinin kurulumunu tamamlad\u0131k. T\u00fcm ekibe; her bir in\u015faat\u00e7\u0131ya, her bir denet\u00e7iye projeye g\u00f6sterdikleri azami ba\u011fl\u0131l\u0131klar\u0131, teslim tarihlerine <img loading=\"lazy\" class=\"alignright wp-image-166358\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/akkuyu-ngsnin-1-inci-guc-unitesinde-ic-koruma-kabugu-montaji-tamamlandi-2.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/akkuyu-ngsnin-1-inci-guc-unitesinde-ic-koruma-kabugu-montaji-tamamlandi-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/akkuyu-ngsnin-1-inci-guc-unitesinde-ic-koruma-kabugu-montaji-tamamlandi-2-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/akkuyu-ngsnin-1-inci-guc-unitesinde-ic-koruma-kabugu-montaji-tamamlandi-2-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/akkuyu-ngsnin-1-inci-guc-unitesinde-ic-koruma-kabugu-montaji-tamamlandi-2-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>uymalar\u0131, yapt\u0131klar\u0131 y\u00fcksek kaliteli i\u015fler, evimiz gibi g\u00f6rd\u00fc\u011f\u00fcm\u00fcz \u015fantiyemize ve n\u00fckleer enerji santralimize kendilerini adad\u0131klar\u0131 i\u00e7in minnettar\u0131m. Hep birlikte \u00f6nemli bir d\u00f6n\u00fcm noktas\u0131ndan ge\u00e7iyoruz. Her y\u0131l birbirimize daha \u00e7ok ba\u011flan\u0131yor, birbirimizi daha iyi anl\u0131yoruz. Ekibimiz en g\u00fc\u00e7l\u00fc ve en \u00fcretken ekip! Bu y\u0131l\u0131n en \u00f6nemli olay\u0131 olan Akkuyu NGS sahas\u0131na taze n\u00fckleer yak\u0131t\u0131n teslim edilmesine yakla\u015f\u0131yoruz. T\u00fcrkiye Cumhuriyeti&#8217;nin y\u00fcz\u00fcnc\u00fc kurulu\u015f y\u0131ld\u00f6n\u00fcm\u00fc i\u00e7in 1\u2019inci \u00dcnitenin tamamlanmas\u0131ndan \u00f6nce d\u0131\u015f koruma kabu\u011fu ve di\u011fer kabul i\u015flerini ger\u00e7ekle\u015ftirmeyi planl\u0131yoruz.\u201d<\/em><\/p>\n<p>Yar\u0131m k\u00fcre \u015feklinde ve 215 ton a\u011f\u0131rl\u0131\u011f\u0131ndaki \u0130KK kubbesi 16 montaj b\u00f6l\u00fcm\u00fcnden olu\u015fuyor. Kubbe ayr\u0131ca sprinkler sistemi servis platformlar\u0131 i\u00e7in 46 tonluk bir \u00e7elik yap\u0131 i\u00e7eriyor. Kubbeyi yakla\u015f\u0131k 62 metre y\u00fcksekli\u011fe kald\u0131rmak i\u00e7in \u00f6zel olarak 75 ton a\u011f\u0131rl\u0131\u011f\u0131nda bir travers tasarland\u0131 ve \u00fcretildi. Liebherr LR 13000 vin\u00e7 taraf\u0131ndan kald\u0131r\u0131lan yap\u0131n\u0131n toplam a\u011f\u0131rl\u0131\u011f\u0131 340 tondu. Kubbenin montaja uygun hale getirilmesi Akkuyu NGS sahas\u0131nda ger\u00e7ekle\u015ftirildi ve 3,5 ay s\u00fcrd\u00fc.<\/p>\n<p>\u0130KK&#8217;nin kubbe k\u0131sm\u0131n\u0131n betonlanmas\u0131n\u0131n ard\u0131ndan, d\u0131\u015f koruma kabu\u011funun in\u015faat ve montaj \u00e7al\u0131\u015fmalar\u0131n\u0131n son a\u015famas\u0131 ba\u015flayacak.<\/p>\n<p>Akkuyu NGS sahas\u0131ndaki in\u015faat ve montaj \u00e7al\u0131\u015fmalar\u0131, d\u00f6rt g\u00fc\u00e7 \u00fcnitesi, k\u0131y\u0131 hidroteknik yap\u0131lar\u0131, g\u00fc\u00e7 da\u011f\u0131t\u0131m sistemi, idari binalar, e\u011fitim merkezi ve NGS fiziksel koruma tesisleri olmak \u00fczere ana ve yard\u0131mc\u0131 tesislerin t\u00fcm\u00fcnde devam ediyor. Akkuyu NGS sahas\u0131ndaki in\u015faat\u0131n t\u00fcm a\u015famalar\u0131 ba\u011f\u0131ms\u0131z denetim kurulu\u015flar\u0131 ve ulusal d\u00fczenleme kurulu\u015fu olan N\u00fckleer D\u00fczenleme Kurumu (NDK) taraf\u0131ndan da yak\u0131ndan takip ediliyor<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1\u2019inci G\u00fc\u00e7 \u00dcnitesi\u2019nde i\u00e7 koruma kabu\u011funun (\u0130KK) kubbesi tasar\u0131m konumuna yerle\u015ftirilerek koruma d\u00f6ng\u00fcs\u00fc tamamland\u0131. AKKUYU N\u00dcKLEER A.\u015e [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":166359,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,107025,107026,19356],"views":33,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/166356"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=166356"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/166356\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/166359"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=166356"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=166356"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=166356"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}