{"id":166212,"date":"2023-01-01T15:27:01","date_gmt":"2023-01-01T12:27:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=166212"},"modified":"2023-01-01T15:45:53","modified_gmt":"2023-01-01T12:45:53","slug":"eksim-enerji-kalyon-pv-den-187-5-mw-lik-kurulu-guc-icin-gunes-paneli-alacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eksim-enerji-kalyon-pv-den-187-5-mw-lik-kurulu-guc-icin-gunes-paneli-alacak\/","title":{"rendered":"(Turkish) &#8217;Eksim Enerji&#8217; Kalyon PV\u2019den 187,5 MW&#8217;l\u0131k Kurulu G\u00fc\u00e7 \u0130\u00e7in G\u00fcne\u015f Paneli Alacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/166212\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Eksim Enerji Viran\u015fehir GES projesinin solar panellerinin tedariki i\u00e7in Kalyon PV ile anla\u015ft\u0131. Toplam 187,5 MW kurulu g\u00fcce sahip projede 352.112 adet yerli g\u00fcne\u015f paneli kullan\u0131lacak.<\/strong><\/h2>\n<p>Eksim Holding\u2019in<strong> % 100 yenilenebilir enerji \u015firketi Eksim Enerji<\/strong>, \u015eanl\u0131urfa\u2019n\u0131n Viran\u015fehir <img loading=\"lazy\" class=\"alignright wp-image-166216\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/eksim-enerji-kalyon-pvden-1875-mw-gunes-paneli-alacak.jpg\" alt=\"\" width=\"320\" height=\"238\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/eksim-enerji-kalyon-pvden-1875-mw-gunes-paneli-alacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/eksim-enerji-kalyon-pvden-1875-mw-gunes-paneli-alacak-300x223.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/eksim-enerji-kalyon-pvden-1875-mw-gunes-paneli-alacak-500x372.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2023\/01\/eksim-enerji-kalyon-pvden-1875-mw-gunes-paneli-alacak-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>il\u00e7esinde kuraca\u011f\u0131<strong> g\u00fcne\u015f enerjisi santrali<\/strong> i\u00e7in <strong>Kalyon PV<\/strong> \u015firketinden <strong>187,5 MW<\/strong> g\u00fcc\u00fcnde <strong>solar panel sat\u0131n alma anla\u015fmas\u0131<\/strong> yapt\u0131.<\/p>\n<p>\u015eirketten yap\u0131lan a\u00e7\u0131klamada, Eksim Enerji\u2019nin ge\u00e7ti\u011fimiz aylarda<strong> Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131<\/strong> taraf\u0131ndan d\u00fczenlenen <strong>YEKA GES-4 ihalesi<\/strong> kapsam\u0131nda \u015eanl\u0131urfa\u2019n\u0131n Viran\u015fehir il\u00e7esinde <strong>187,5 MW<\/strong> kapasite tahsis hakk\u0131 kazand\u0131\u011f\u0131na dikkat \u00e7ekildi.<\/p>\n<p>A\u00e7\u0131klamada Eksim Enerji\u2019nin <strong>YEKA GES-4<\/strong> haricinde <strong>YEKA GES-3<\/strong> yar\u0131\u015fmas\u0131nda <strong>87,5 MW<\/strong> ve <strong>70 MW<\/strong> de<strong> hibrit proje<\/strong> eklendi\u011finde g\u00fcne\u015f enerjisinde toplam 345 MW lisans g\u00fcc\u00fcne ula\u015ft\u0131\u011f\u0131 belirtildi.<\/p>\n<h3><strong>Eksim Enerji GM Sabahattin Er: \u201cY\u0131lda 360 bin ton karbon sal\u0131m\u0131 \u00f6nlenecek\u201d<\/strong><\/h3>\n<p><strong>Eksim Enerji Genel M\u00fcd\u00fcr\u00fc Sabahattin Er<\/strong>, g\u00fcne\u015f enerjisindeki lisans g\u00fcc\u00fcn\u00fcn yat\u0131r\u0131ma d\u00f6n\u00fc\u015fmesiyle y\u0131lda yakla\u015f\u0131k <strong>600 milyon kWh<\/strong> temiz enerji \u00fcretilece\u011fini belirterek, <em>\u201cViran\u015fehir GES projemizin elektrik \u00fcretimine ba\u015flamas\u0131yla yakla\u015f\u0131k <strong>120 bin hanenin<\/strong> elektrik ihtiyac\u0131 kar\u015f\u0131lanacak ve y\u0131lda <strong>200 bin ton karbon sal\u0131m\u0131n\u0131n<\/strong> \u00f6n\u00fcne ge\u00e7ilecek.<\/em><\/p>\n<p><em>YEKA ihaleleriyle kazand\u0131\u011f\u0131m\u0131z g\u00fcne\u015f enerjisi lisanslar\u0131n\u0131 belli bir planlamayla hayata ge\u00e7irece\u011fiz. Farkl\u0131 b\u00f6lgelerdeki g\u00fcne\u015f enerjisi santrallerimizi (GES) devreye alaca\u011f\u0131z. Di\u011fer lisanslar\u0131m\u0131z\u0131n da \u00f6n\u00fcm\u00fczdeki d\u00f6nemde yat\u0131r\u0131ma d\u00f6n\u00fc\u015fmesi i\u00e7in haz\u0131rl\u0131klar\u0131m\u0131z\u0131 s\u00fcrd\u00fcr\u00fcyoruz.\u201d<\/em><\/p>\n<h3><strong>Kalyon PV CEO\u2019su Ersan T\u00fcfek\u00e7i: \u201cYerli ve milli kaynaklarla enerji elde etmek \u00fclkemiz i\u00e7in stratejik \u00f6nem ta\u015f\u0131yor\u201d<\/strong><\/h3>\n<p><strong>Kalyon PV CEO\u2019su Ersan T\u00fcfek\u00e7i<\/strong> ise anla\u015fmayla ilgili \u015funlar\u0131 s\u00f6yledi: <em>\u201cD\u00fcnya \u00e7ap\u0131nda enerji krizinin ya\u015fand\u0131\u011f\u0131 g\u00fcn\u00fcm\u00fczde, <strong>yerli<\/strong> ve<strong> milli kaynaklarla<\/strong> enerji elde etmek \u00fclkemiz i\u00e7in stratejik \u00f6nem ta\u015f\u0131yor. \u00dclkemizin enerji ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131nda kilit rol oynayan <strong>YEKA projelerinde<\/strong> yer almak ve bu y\u00fckseli\u015fin bir par\u00e7as\u0131 olmaktan mutluluk duyuyoruz. Eksim Holding ile yapt\u0131\u011f\u0131m\u0131z bu anla\u015fmas\u0131n\u0131n \u00f6ncelikle \u00fclkemiz hay\u0131rl\u0131 olmas\u0131n\u0131 temenni ediyor, i\u015fbirli\u011fimizin uzun y\u0131llar devam etmesini diliyorum.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Eksim Enerji Viran\u015fehir GES projesinin solar panellerinin tedariki i\u00e7in Kalyon PV ile anla\u015ft\u0131. Toplam 187,5 MW kurulu g\u00fcce sahip projede 352.112 adet [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":166216,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[97192,2206,57639,99875,96958,84424,842,39714,107001,105,20926],"views":50,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/166212"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=166212"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/166212\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/166216"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=166212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=166212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=166212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}