{"id":165723,"date":"2022-12-23T15:39:59","date_gmt":"2022-12-23T12:39:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=165723"},"modified":"2022-12-23T15:40:36","modified_gmt":"2022-12-23T12:40:36","slug":"green-solar-network-projesi-kapanis-toreni-istanbulda-gerceklesti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/green-solar-network-projesi-kapanis-toreni-istanbulda-gerceklesti\/","title":{"rendered":"(Turkish) Green Solar Network Projesi Kapan\u0131\u015f T\u00f6reni \u0130stanbul&#8217;da Ger\u00e7ekle\u015fti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/165723\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Avrupa Birli\u011fi taraf\u0131ndan finanse edilen GENSED\u2019in ba\u015fvuru sahibi oldu\u011fu Green Solar Network Projesi kapan\u0131\u015f t\u00f6reni ve \u201cEnerji Depolama Sohbetleri\u201d toplant\u0131s\u0131 20 Aral\u0131k 2022 g\u00fcn\u00fc \u0130stanbul Kalam\u0131\u015f Wyndham Otel\u2019de geni\u015f kat\u0131l\u0131mla yap\u0131ld\u0131.<\/strong><\/h2>\n<p>GENSED Onursal Ba\u015fkan\u0131 <strong>\u015eener Oktik<\/strong> toplant\u0131n\u0131n a\u00e7\u0131l\u0131\u015f\u0131nda yapt\u0131\u011f\u0131 konu\u015fmada, <strong>g\u00fcne\u015ften elektrik \u00fcretiminin<\/strong> var olan konvansiyonel teknolojilere kar\u015f\u0131<strong> rekabet\u00e7ili\u011finin depolamadan ge\u00e7ti\u011fini vurgularken<\/strong>, depolama teknolojilerinin \u00f6zellikle<strong> e-mobilite<\/strong> alan\u0131ndaki ilerlemelerden dolay\u0131 \u00e7ok h\u0131zl\u0131 \u015fekilde geli\u015fti\u011fine bununla birlikte depolaman\u0131n farkl\u0131 noktalar\u0131 olan \u00e7ok karma\u015f\u0131k bir konu oldu\u011funa dikkat \u00e7ekti.<\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-165725\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/12\/green-solar-network-projesi-kapanis-toreni-istanbulda-gerceklesti.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/12\/green-solar-network-projesi-kapanis-toreni-istanbulda-gerceklesti.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/12\/green-solar-network-projesi-kapanis-toreni-istanbulda-gerceklesti-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/12\/green-solar-network-projesi-kapanis-toreni-istanbulda-gerceklesti-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/12\/green-solar-network-projesi-kapanis-toreni-istanbulda-gerceklesti-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>AB T\u00fcrkiye Delegasyonu Program Y\u00f6neticisi <strong>Christian Ballaro<\/strong> da konu\u015fmas\u0131nda g\u00fcne\u015f enerjisinin yaln\u0131zca <strong>\u00e7evresel<\/strong> olarak de\u011fil ayn\u0131 zamanda <strong>ekonomik kalk\u0131nma<\/strong> ve<strong> i\u015f f\u0131rsatlar\u0131<\/strong> ad\u0131na da \u00f6nemli unsurlar bar\u0131nd\u0131rd\u0131\u011f\u0131n\u0131 kaydederken, <strong>Avrupa Birli\u011fi\u2019nin Ye\u015fil Mutabakat<\/strong> ile ye\u015fil teknolojileri daha karl\u0131 hale getirmeyi ba\u015farmak istedi\u011fini ve genelde yenilenebilir enerji \u00f6zelde ise g\u00fcne\u015f enerjisinin daha fazla yat\u0131r\u0131m yap\u0131larak odaklan\u0131lmas\u0131 gerekti\u011finin alt\u0131n\u0131 \u00e7izdi.<\/p>\n<p>GENSED Ba\u015fkan\u0131 Halil Demirda\u011f ise konu\u015fmas\u0131nda dernek olarak <strong>enerji depolaman\u0131n \u00f6nemini<\/strong> vurgulamak i\u00e7in bu alan\u0131 faaliyet konusu olarak bundan <strong>5 sene \u00f6nce<\/strong> t\u00fcz\u00fcklerine eklediklerini hat\u0131rlatarak, bu konuya verdikleri \u00f6nemi vurgulad\u0131. Demirda\u011f son d\u00f6nemde yap\u0131lan mevzuat de\u011fi\u015fiklikleri ile de g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131 i\u00e7in \u00e7ok ciddi esneklikler getirilerek yat\u0131r\u0131mc\u0131lara istedikleri yerde \u00fcretmek, t\u00fcketmek ve mahsupla\u015fmak gibi imkanlar sa\u011fland\u0131\u011f\u0131na dikkat \u00e7ekti.<\/p>\n<p>A\u00e7\u0131l\u0131\u015f\u0131n ard\u0131ndan GENSED Genel Sekreteri <strong>Hakan Erkan<\/strong>\u2019\u0131n moderat\u00f6rl\u00fc\u011f\u00fcnde <strong>\u201cEnerji Depolama Oturumu\u201d<\/strong> ger\u00e7ekle\u015ftirildi. Oturumda enerji depolama yat\u0131r\u0131mlar\u0131na y\u00f6nelik <strong>yasal d\u00fczenlemelerdeki<\/strong> mevcut durum, <strong>depolama teknolojileri<\/strong> ve <strong>kontrol sistemlerindeki geli\u015fmeler<\/strong> gibi alanlarda konular\u0131n uzmanlar\u0131 taraf\u0131ndan sunumlar yap\u0131larak, kat\u0131l\u0131mc\u0131lar\u0131n sorular\u0131 cevapland\u0131.<\/p>\n<h3><strong>Solar+Storage 31 A\u011fustos\u2019ta kap\u0131lar\u0131n\u0131 a\u00e7acak<\/strong><\/h3>\n<p>Etkinlikte ayr\u0131ca 2020 y\u0131l\u0131ndan beri d\u00fczenlenen <strong>Solar \u0130stanbul<\/strong> fuar\u0131n\u0131n<strong> 2023<\/strong> y\u0131l\u0131ndan itibaren\u00a0<strong>\u201cSolar+Storage\u201d\u00a0<\/strong>ismi ile devam ettirilece\u011fi de a\u00e7\u0131kland\u0131.<\/p>\n<p>GENSED Genel Sekreteri Hakan Erkan taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re bu y\u0131l <strong>31 A\u011fustos \u2013 3 Eyl\u00fcl<\/strong> tarihleri aras\u0131nda <strong>T\u00dcYAP Fuar ve Kongre Merkezi<\/strong>\u2019nde d\u00fczenlenecek olan fuar\u0131n T\u00fcrkiye\u2019de depolama ifadesini resm\u00ee ismine dahil eden ilk enerji fuar\u0131 olma \u00fcnvan\u0131 ta\u015f\u0131yacak.<\/p>\n<p>Hakan Erkan organizasyon i\u00e7in \u00e7al\u0131\u015fmalar\u0131n ba\u015flad\u0131\u011f\u0131 ve \u015fimdiden enerji depolama alan\u0131nda d\u00fcnya \u00e7ap\u0131nda faaliyet g\u00f6steren \u00f6nde gelen 250\u2019den fazla \u00fcretici kurulu\u015f ile m\u00fchendislik firmas\u0131n\u0131n davet edildi\u011fini s\u00f6yledi.<\/p>\n<p>Organizasyonun amac\u0131 olarak da sadece g\u00fcne\u015f panelinde oldu\u011fu gibi <strong>depolama<\/strong> alan\u0131nda da<strong> yerli<\/strong> ve <strong>milli<\/strong> bir geli\u015fimin sa\u011flanmas\u0131na katk\u0131 sunma ile s\u0131n\u0131rl\u0131 olmad\u0131\u011f\u0131n\u0131n da alt\u0131n\u0131 \u00e7izen Hakan Erkan ayn\u0131 zamanda T\u00fcrkiye\u2019de \u00fcretilecek olan \u00fcr\u00fcnlerin Avrupa ve d\u00fcnya pazarlar\u0131na ihra\u00e7 edebilecek <strong>bir a\u011f<\/strong> ve <strong>ili\u015fki<\/strong> ortam\u0131n\u0131 yaratmay\u0131 hedeflediklerini de s\u00f6zlerine ekledi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Avrupa Birli\u011fi taraf\u0131ndan finanse edilen GENSED\u2019in ba\u015fvuru sahibi oldu\u011fu Green Solar Network Projesi kapan\u0131\u015f t\u00f6reni ve \u201cEnerji Depolama Sohbetleri\u201d toplant\u0131s\u0131 20 Aral\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":165725,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[106890,727,106889,2206,64978,106888],"views":37,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/165723"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=165723"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/165723\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/165725"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=165723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=165723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=165723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}