{"id":165631,"date":"2022-12-22T12:15:06","date_gmt":"2022-12-22T09:15:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=165631"},"modified":"2022-12-22T12:16:13","modified_gmt":"2022-12-22T09:16:13","slug":"eksim-enerji-2-ruzgar-santralinde-150-mw-kapasite-artisi-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eksim-enerji-2-ruzgar-santralinde-150-mw-kapasite-artisi-yapacak\/","title":{"rendered":"(Turkish) &#8217;Eksim Enerji&#8217; 2 R\u00fczgar Santralinde 150 MW Kapasite Art\u0131\u015f\u0131 Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/165631\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Eksim Enerji, Geyve RES\u2019de 98 MW ve Silivri RES\u2019de 52 MW olmak \u00fczere toplam 150 MW kapasite art\u0131\u015f\u0131 yapacak. Toplam 22 t\u00fcrbinden olu\u015facak ilave kapasite i\u00e7in Nordex t\u00fcrbinleri kullan\u0131lacak. <\/strong><\/h2>\n<p>Eksim Holding\u2019in y\u00fczde 100 yenilenebilir enerji \u015firketi <strong>Eksim Enerji<\/strong>, <em>Geyve ve Silivri r\u00fczgar santrallerinde<\/em> kapasite art\u0131\u015f\u0131 amac\u0131yla <strong>22 adet<\/strong> t\u00fcrbin tedariki i\u00e7in Alman t\u00fcrbin \u00fcreticisi <strong>Nordex<\/strong> ile <img loading=\"lazy\" class=\"alignright wp-image-165634\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/12\/Silivri-RES.jpg\" alt=\"\" width=\"320\" height=\"207\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/12\/Silivri-RES.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/12\/Silivri-RES-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/12\/Silivri-RES-500x323.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/12\/Silivri-RES-77x50.jpg 77w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>anla\u015fma<\/strong> sa\u011flad\u0131. Anla\u015fma <strong>10 senelik t\u00fcrbin bak\u0131m<\/strong> ve <strong>onar\u0131m hizmeti<\/strong> olan <strong>\u201cPremium Service\u201d<\/strong> hizmetini de kaps\u0131yor.<\/p>\n<p>Anla\u015fma kapsam\u0131nda Sakarya\u2019da bulunan <strong>50 MW<\/strong> kurulu g\u00fcce sahip <strong>Geyve RES<\/strong>\u2019in kapasitesi <strong>98 MW<\/strong>, \u0130stanbul\u2019da bulunan <strong>63 MW<\/strong> kurulu g\u00fcce sahip <strong>Silivri RES<\/strong>\u2019in kapasitesi ise <strong>52 MW<\/strong> art\u0131r\u0131lacak. Kapasite art\u0131\u015f\u0131 i\u00e7in <strong>Geyve RES<\/strong>\u2019de <strong>14<\/strong> adet, <strong>Silivri RES\u2019<\/strong>de ise<strong> 8 adet N163\/6.X model<\/strong> <strong>t\u00fcrbin<\/strong> kullan\u0131lacak.<\/p>\n<p>Nordex\u2019in <strong>T\u00fcrkiye\u2019deki ilk \u0131s\u0131tmal\u0131 kanatlar\u0131na sahip t\u00fcrbinlerinin<\/strong> kullan\u0131laca\u011f\u0131 <strong>Geyve RES<\/strong>\u2019de kapasite art\u0131\u015f\u0131 2023 y\u0131l\u0131nda, <strong>Silivri RES<\/strong>\u2019de ise <strong>2024 y\u0131l\u0131nda<\/strong> devreye al\u0131nacak.<\/p>\n<h3><strong>Sabahattin Er: \u201cDi\u011fer sahalar\u0131m\u0131zda da kapasite art\u0131\u015flar\u0131 olacakt\u0131r.\u201d<\/strong><\/h3>\n<p>Eksim Enerji Genel M\u00fcd\u00fcr\u00fc Sabahattin Er, yenilenebilir enerji \u00fcretiminde r\u00fczgar ve g\u00fcne\u015f enerjisi odakl\u0131 olarak b\u00fcy\u00fcmeye devam edeceklerini belirterek, <em>\u201c\u00d6n\u00fcm\u00fczdeki d\u00f6nemde di\u011fer r\u00fczgar santral sahalar\u0131m\u0131zda \u00a0kapasite tahsisi sa\u011flanan yakla\u015f\u0131k 50 MW proje hayata ge\u00e7ecektir. Eksim Enerji olarak\u00a0 YEKA RES-3 yar\u0131\u015fmalar\u0131ndan kazand\u0131\u011f\u0131m\u0131z 260 MW kapasitemizi de en h\u0131zl\u0131 \u015fekilde devreye almak i\u00e7in \u00e7al\u0131\u015fmalar\u0131m\u0131za devam ediyoruz. Mevcut portf\u00f6y\u00fcm\u00fcz tamamland\u0131\u011f\u0131nda yurt i\u00e7inde yakla\u015f\u0131k 925 MW r\u00fczgar kapasitesine ula\u015fm\u0131\u015f olaca\u011f\u0131z. Bunun d\u0131\u015f\u0131nda T\u00fcrkiye\u2019de ve yurt d\u0131\u015f\u0131nda yeni projeler geli\u015ftirilmesiyle ilgili ara\u015ft\u0131rmalar\u0131m\u0131z da devam ediyor\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<p>Nordex CSO\u2019su Patxi Landa ise, <em>\u201cNordex, y\u0131llard\u0131r Eksim ile yak\u0131n i\u015fbirli\u011fi i\u00e7inde \u00e7al\u0131\u015f\u0131yor ve r\u00fczgar santralleri i\u00e7in yine bizim teknolojimizi tercih etmeleri, uzun s\u00fcredir devam eden ortakl\u0131\u011f\u0131m\u0131za duyduklar\u0131 g\u00fcvenin devam etti\u011fini g\u00f6steriyor\u201d<\/em> diye konu\u015ftu. Patxi Landa, T\u00fcrkiye r\u00fczgar enerjisi sekt\u00f6r\u00fcnde 3,5 GW kapasite kurulumuyla lider konumunda bulunduklar\u0131n\u0131 s\u00f6yledi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Eksim Enerji, Geyve RES\u2019de 98 MW ve Silivri RES\u2019de 52 MW olmak \u00fczere toplam 150 MW kapasite art\u0131\u015f\u0131 yapacak. Toplam 22 t\u00fcrbinden [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":165634,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[97192,106859,10764,18571,5320,106860],"views":50,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/165631"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=165631"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/165631\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/165634"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=165631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=165631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=165631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}