{"id":16557,"date":"2013-10-17T15:11:22","date_gmt":"2013-10-17T12:11:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=16557"},"modified":"2013-10-17T15:11:22","modified_gmt":"2013-10-17T12:11:22","slug":"hindistanda-gunes-elektriginin-fiyati-komure-yaklasti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hindistanda-gunes-elektriginin-fiyati-komure-yaklasti\/","title":{"rendered":"(Turkish) Hindistan&#8217;da G\u00fcne\u015f Elektri\u011finin Fiyat\u0131 K\u00f6m\u00fcre Yakla\u015ft\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/16557\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Hindistan&#8217;\u0131n ilk GW \u00f6l\u00e7e\u011findeki santrali rekor d\u00fc\u015f\u00fck fiyat ile elektrik satacak. <\/strong><strong>Hindistan&#8217;da kamuya ait 6 enerji \u015firketinin \u00fclkenin gigavat \u00f6l\u00e7e\u011findeki ilk\u00a0 g\u00fcne\u015f enerjisi santrali projesinde \u00fcretilecek elektri\u011fi rekor seviyede d\u00fc\u015f\u00fck\u00a0 fiyat ile satmak i\u00e7in teklifte bulundu\u011fu bildirildi.<\/strong><\/p>\n<p>\u00dclkenin\u00a0 Yeni ve Yenilenebilir Enerji Bakanl\u0131\u011f\u0131&#8217;n\u0131n g\u00fcne\u015f enerjisi\u00a0 yat\u0131r\u0131mlar\u0131 ile ilgili biriminin ba\u015f\u0131ndaki Tarun Kapoor taraf\u0131ndan yap\u0131lan\u00a0 a\u00e7\u0131klamada toplam b\u00fcy\u00fckl\u00fc\u011f\u00fc 4 GW olacak projenin 1 GW&#8217;l\u0131k ilk etab\u0131n\u0131n 2016\u00a0 y\u0131l\u0131nda devreye al\u0131nmas\u0131n\u0131n \u00f6ng\u00f6r\u00fcld\u00fc\u011f\u00fcn\u00fc s\u00f6yledi. Kapoor bu a\u015famadan sonra ise\u00a0 projenin geri kalan\u0131n\u0131n yat\u0131r\u0131m\u0131 i\u00e7in \u00f6zel \u015firketlerden teklif al\u0131naca\u011f\u0131n\u0131 ifade\u00a0 etti. Projenin devreye gir<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/goldman-sachs-gunes-elektrigine-yarim-milyar-dolarlik-finansman-saglayacak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-11083\" title=\"g\u00fcne\u015f-elektri\u011fi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/goldman-sachs-gunes-elektrigine-yarim-milyar-dolarlik-finansman-saglayacak-300x163.jpg\" alt=\"\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/goldman-sachs-gunes-elektrigine-yarim-milyar-dolarlik-finansman-saglayacak-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/goldman-sachs-gunes-elektrigine-yarim-milyar-dolarlik-finansman-saglayacak-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/goldman-sachs-gunes-elektrigine-yarim-milyar-dolarlik-finansman-saglayacak.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>mesi ile \u00fcretilecek elektri\u011fin megavat-saatinin 5,500 rupiden (89.1 ABD Dolar\u0131) sat\u0131n al\u0131naca\u011f\u0131 bilgisini de\u00a0 veren Tarun Kapoor, yat\u0131r\u0131ma devlet deste\u011fi sa\u011flanaca\u011f\u0131n\u0131 da d\u00f6ylerken deste\u011fin\u00a0 boyutlar\u0131 konusunda ise bir bilgi payla\u015fmad\u0131.<\/p>\n<p>Bloomberg New Energy Finance verilerine g\u00f6re bu rakam \u00fclkede \u015fimdiye kadar\u00a0 g\u00fcne\u015f elektri\u011fi alan\u0131nda verilen en d\u00fc\u015f\u00fck teklifin 10 rupi, d\u00fcnya ortalamas\u0131n\u0131n\u00a0 ise y\u00fczde 32 oran\u0131nda alt\u0131nda.<\/p>\n<p>Yeni Delhi merkezli g\u00fcne\u015f enerjisi dan\u0131\u015fmanl\u0131k \u015firketi Bridge to India&#8217;n\u0131n\u00a0 verilerine g\u00f6re ise 100 GW&#8217;l\u0131k k\u00f6m\u00fcr santrali projesinin geli\u015ftirilme a\u015famas\u0131nda\u00a0 oldu\u011fu \u00fclkede yeni k\u00f6m\u00fcr santrallerinde \u00fcretilen elektri\u011fin megavat-saat sat\u0131\u015f fiyat\u0131 4,500 rupi d\u00fczeyinde bulunuyor.<\/p>\n<p>N\u00fcfusunun y\u00fczde 40&#8217;\u0131n\u0131n d\u00fczenli olarak elektri\u011fe ula\u015fmakta g\u00fc\u00e7l\u00fck \u00e7ekti\u011fi\u00a0 \u00fclkenin y\u00f6netimi g\u00fcne\u015f enerjisine b\u00fcy\u00fck \u00f6nem veriyor. Hindistan 2010 y\u0131l\u0131nda\u00a0 devreye ald\u0131\u011f\u0131 g\u00fcne\u015f enerjisi program\u0131 ile 2022 i\u00e7in g\u00fcne\u015f elektri\u011finde 20\u00a0 GW&#8217;l\u0131k kurulu g\u00fcce ula\u015fma hedefinde bulunmu\u015ftu.<\/p>\n<p>\u00dclke \u00e7al\u0131\u015fman\u0131n ilk a\u015famas\u0131nda 2012 i\u00e7in 1.1 GW&#8217;l\u0131k g\u00fc\u00e7 hedeflemi\u015f iken bu\u00a0 hedefi a\u015farak ge\u00e7en y\u0131l\u0131n sonunda g\u00fcne\u015f enerjisinde 1.685 GW kurulu g\u00fcce\u00a0 ula\u015fm\u0131\u015ft\u0131. 31 Temmuz 2013 itibari ile ise \u00fclkenin bu alandaki kurulu g\u00fcc\u00fc 1.8\u00a0 GW&#8217;a ula\u015fm\u0131\u015f durumda. Plan\u0131n ikinci a\u015famas\u0131 i\u00e7in ise Hindistan h\u00fck\u00fcmeti 2017&#8217;de\u00a0 10 GW&#8217;l\u0131k kurulu g\u00fcce ula\u015fmay\u0131 hedefliyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.yesilekonomi.com\/finans\/hindistanda-gunes-elektriginin-fiyati-komure-yaklasti\" target=\"_blank\">Ye\u015fil Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Hindistan&#8217;\u0131n ilk GW \u00f6l\u00e7e\u011findeki santrali rekor d\u00fc\u015f\u00fck fiyat ile elektrik satacak. Hindistan&#8217;da kamuya ait 6 enerji \u015firketinin \u00fclkenin gigavat \u00f6l\u00e7e\u011findeki ilk\u00a0 g\u00fcne\u015f enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11083,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[4079,19,63,67,1009,165,2326,1169,2569,2401,4034,3460,9637],"views":794,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16557"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=16557"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16557\/revisions"}],"predecessor-version":[{"id":16559,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16557\/revisions\/16559"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/11083"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=16557"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=16557"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=16557"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}