{"id":164015,"date":"2022-11-26T19:39:36","date_gmt":"2022-11-26T16:39:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=164015"},"modified":"2022-11-26T19:41:03","modified_gmt":"2022-11-26T16:41:03","slug":"turkiye-sigorta-yusufeli-barajina-31-aralik-2023e-kadar-guvence-sunacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-sigorta-yusufeli-barajina-31-aralik-2023e-kadar-guvence-sunacak\/","title":{"rendered":"(Turkish) &#8217;T\u00fcrkiye Sigorta&#8217; Yusufeli Baraj\u0131\u2019na 31 Aral\u0131k 2023\u2019e Kadar G\u00fcvence Sunacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/164015\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye Sigorta, \u00fclkenin stratejik projelerini g\u00fcvence alt\u0131na almay\u0131 s\u00fcrd\u00fcr\u00fcyor. 275 metrelik y\u00fcksekli\u011fi ile T\u00fcrkiye\u2019nin en b\u00fcy\u00fck, d\u00fcnyan\u0131n da 5&#8217;inci b\u00fcy\u00fck baraj\u0131 olarak kabul edilen Yusufeli Baraj\u0131\u2019na, T\u00fcrkiye Sigorta g\u00fcvence sa\u011fl\u0131yor.<\/h2>\n<p>2022 y\u0131l\u0131 sonuna kadar devam edecek olan <strong>\u0130n\u015faat All Risk poli\u00e7esi; ter\u00f6r, test devresi, yang\u0131n, do\u011fal afetler, \u00e7\u00f6kme, \u00fc\u00e7\u00fcnc\u00fc \u015fah\u0131s <\/strong>ve<strong> h\u0131rs\u0131zl\u0131k<\/strong> gibi teminatlar\u0131 i\u00e7eriyor. Ard\u0131ndan ba\u015flayacak olan bak\u0131m devresiyle birlikte <strong>T\u00fcrkiye Sigorta, Yusufeli Baraj\u0131<\/strong>\u2019na <strong>2023 y\u0131l\u0131 sonuna kadar<\/strong> g\u00fcvence sunmaya devam edecek.<\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-164018\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/thumbs_b_c_ef6f677e82365727f731d3d1ed5de652.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/thumbs_b_c_ef6f677e82365727f731d3d1ed5de652.jpg 863w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/thumbs_b_c_ef6f677e82365727f731d3d1ed5de652-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/thumbs_b_c_ef6f677e82365727f731d3d1ed5de652-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/thumbs_b_c_ef6f677e82365727f731d3d1ed5de652-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/thumbs_b_c_ef6f677e82365727f731d3d1ed5de652-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Yap\u0131m\u0131na ilk olarak <strong>26 \u015eubat 2013<\/strong> tarihinde ba\u015flanan <strong>Yusufeli Baraj\u0131, Do\u011fu Karadeniz B\u00f6lgesi&#8217;nde<\/strong>, Artvin&#8217;in 70 kilometre g\u00fcneybat\u0131s\u0131nda, T\u00fcrkiye&#8217;nin en h\u0131zl\u0131 akan \u0131rma\u011f\u0131 <strong>\u00c7oruh Nehri<\/strong> \u00fczerinde in\u015fa edildi. Su depolama kapasitesi<strong> 2,3 milyar metrek\u00fcp<\/strong> olan <strong>Yusufeli Baraj\u0131<\/strong>&#8216;nda y\u0131lda <strong>1 milyar 900 milyon kWh<\/strong> enerji \u00fcretilecek.<\/p>\n<p><strong>T\u00fcrkiye Sigorta Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Remzi Duman<\/strong>, projeye ili\u015fkin \u015funlar\u0131 s\u00f6yledi: <em>\u201cT\u00fcrkiye, son y\u0131llarda enerji alan\u0131nda yapt\u0131\u011f\u0131 \u00f6rnek yat\u0131r\u0131mlarla ve projelerle d\u00fcnyada say\u0131l\u0131 \u00fclkeler aras\u0131nda yerini al\u0131yor. Say\u0131n Cumhurba\u015fkan\u0131m\u0131z ile <strong>Tar\u0131m<\/strong> ve <strong>Orman Bakanl\u0131\u011f\u0131m\u0131z<\/strong> ve<strong> Devlet Su \u0130\u015fleri (DS\u0130)<\/strong> \u00f6nc\u00fcl\u00fc\u011f\u00fcnde, <strong>yerli<\/strong> ve <strong>mill\u00ee \u00e7\u00f6z\u00fcmlerle<\/strong> \u00fclkemizin enerjide d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131n azalt\u0131lmas\u0131 ama\u00e7lanarak hayata ge\u00e7irilen \u00e7ok say\u0131da prestijli projenin son halkas\u0131 Yusufeli Baraj\u0131 oldu. T\u00fcrkiye, enerji alan\u0131ndaki at\u0131l\u0131mlar\u0131n\u0131 h\u0131z kesmeden s\u00fcrd\u00fcr\u00fcrken, T\u00fcrkiye Sigorta olarak bizler de bu de\u011ferli projelerin payda\u015f\u0131 olmaktan duydu\u011fumuz gurura bir yenisini daha ekledik. Yusufeli Baraj\u0131\u2019n\u0131n <strong>enerji \u00fcretim kapasitesi<\/strong>, <strong>2,5 milyon konutun<\/strong> ihtiyac\u0131n\u0131<strong> tek ba\u015f\u0131na kar\u015f\u0131layacak<\/strong> d\u00fczeyde. <strong>100 katl\u0131 bir g\u00f6kdelen<\/strong> y\u00fcksekli\u011finde olan Yusufeli Baraj\u0131\u2019na sa\u011flad\u0131\u011f\u0131m\u0131z <strong>teminatla<\/strong> gurur duyuyoruz. T\u00fcm T\u00fcrkiye i\u00e7in anlam ve \u00f6nemi b\u00fcy\u00fck olan bu projede, eme\u011fi ge\u00e7en herkese te\u015fekk\u00fcrlerimi sunuyorum.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Sigorta, \u00fclkenin stratejik projelerini g\u00fcvence alt\u0131na almay\u0131 s\u00fcrd\u00fcr\u00fcyor. 275 metrelik y\u00fcksekli\u011fi ile T\u00fcrkiye\u2019nin en b\u00fcy\u00fck, d\u00fcnyan\u0131n da 5&#8217;inci b\u00fcy\u00fck baraj\u0131 olarak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":164019,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[9824,34926,78791,1088],"views":47,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/164015"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=164015"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/164015\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/164019"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=164015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=164015"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=164015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}