{"id":16392,"date":"2013-10-10T15:05:17","date_gmt":"2013-10-10T12:05:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=16392"},"modified":"2013-10-10T17:12:09","modified_gmt":"2013-10-10T14:12:09","slug":"cinde-alstomun-en-buyuk-hidroelektrik-tesisi-acildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cinde-alstomun-en-buyuk-hidroelektrik-tesisi-acildi\/","title":{"rendered":"(Turkish) \u00c7in`de Alstom\u2019un En B\u00fcy\u00fck Hidroelektrik Tesisi A\u00e7\u0131ld\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/16392\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>D\u00fcnyan\u0131n \u00f6nde gelen hidroelektrik ekipman tedarik\u00e7isi ve hizmet sa\u011flay\u0131c\u0131s\u0131 konumundaki Alstom, en b\u00fcy\u00fck hidroelektrik sanayi tesisini \u00c7in`de a\u00e7t\u0131. Alstom`dan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, \u00c7in\u2019in Tianjin kentinde yer alan Alstom\u2019un en b\u00fcy\u00fck hidroelektrik sanayi tesisi t\u00f6renle a\u00e7\u0131ld\u0131. A\u00e7\u0131l\u0131\u015fa Alstom Ba\u015fkan ve CEO\u2019su Patrick Kron ve Alstom Yenilenebilir Enerji Sekt\u00f6r\u00fc Ba\u015fkan\u0131 J\u00e9r\u00f4me P\u00e9cresse de kat\u0131ld\u0131.<\/strong><\/p>\n<p><strong>100 M\u0130LYON EURO`LUK YATIRIM<\/strong><br \/>\n100 milyon Euro yat\u0131r\u0131m yap\u0131lan bu yeni tesis ile Alstom, \u00c7in\u2019de giderek artan hidroelektrik ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131lamay\u0131 ve hidroelektrik alan\u0131nda b\u00f6lge genelinde b\u00fcy\u00fcmeyi ama\u00e7l\u0131yor. Tianjin tesisi toplam 250 bin metre karelik bir alanda yer al\u0131yor ve sahada 400\u2019den fazlas\u0131 m\u00fchendis olmak \u00fczere yakla\u015f\u0131k 2 bin Alstom \u00e7al\u0131\u015fan\u0131 istihdam ediliyor.<\/p>\n<p>Alstom ge\u00e7ti\u011fimiz g\u00fcnlerde, Tianjin tesisinde, \u00c7in\u2019in Xiangjiaba Hidroelektrik Santrali i\u00e7in 800 MW s\u0131n\u0131f\u0131 d\u00f6rt adet \u00fcnite tedarik etti. D\u00fcnyan\u0131n en g\u00fc\u00e7l\u00fc hidroelektrik \u00fcretimini yapan bu \u00fcniteler, b\u00f6ylesine b\u00fcy\u00fck makineler i\u00e7in rekor bir s\u00fcrede teslim edildi.<\/p>\n<p><strong>YILDA 26 T\u00dcRB\u0130N TESL\u0130MATI<\/strong><br \/>\nOrtalama olarak her iki ayda bir \u00fcnite teslimat\u0131 yapan Alstom, halihaz\u0131rda i\u015fletmede olan, bu kadar g\u00fc\u00e7l\u00fc \u00fcniteleri teslim eden tek \u00fcreticidir. Faz II projesinin tamamlanmas\u0131 ile birlikte yeni sahada iki adet yeni ve son teknoloji ayakl\u0131 k\u00f6pr\u00fcl\u00fc vin\u00e7 dahil olmak \u00fczere 19 adet a\u011f\u0131r makine olacak, y\u0131ll\u0131k bazda 26 adete kadar t\u00fcrbin ve jenerat\u00f6r \u00fcnitesi teslim edilebilecek.<\/p>\n<p><strong>T\u00dcRB\u0130NLERE \u00d6L\u00c7EKL\u0130 MODEL TESTLER\u0130<\/strong><br \/>\nAsya pazar\u0131nda her t\u00fcr hidroelektrik ekipman\u0131n\u0131n ara\u015ft\u0131rma ve geli\u015ftirme ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131layacak yeni global teknoloji merkezinde; Francis ve Kaplan t\u00fcrbinlerinin \u00f6l\u00e7ekli model testlerinin yan\u0131 s\u0131ra, hidroelektrik t\u00fcrbin ve jenerat\u00f6rlerinin mekanik, hidrolik ve elektrik alanlar\u0131nda Ar&amp;Ge \u00e7al\u0131\u015fmalar\u0131 yap\u0131lacak. Bu merkez ba\u015fta Grenoble\u2019da (Fransa) olmak \u00fczere Avrupa ekipleri ile yak\u0131n temas halinde, Alstom\u2019un k\u00fcresel Ar&amp;Ge a\u011f\u0131n\u0131n bir par\u00e7as\u0131 olacak.<\/p>\n<p><strong>FABR\u0130KA KARBON SALIMINI AZALTACAK<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/10\/cin-de-alstomun-en-buyuk-hidroelektrik-tesisi-acildi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-16393\" title=\"cin-de-alstomun-en-buyuk-hidroelektrik-tesisi-acildi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/10\/cin-de-alstomun-en-buyuk-hidroelektrik-tesisi-acildi-300x188.jpg\" alt=\"\" width=\"300\" height=\"188\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/10\/cin-de-alstomun-en-buyuk-hidroelektrik-tesisi-acildi-300x188.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/10\/cin-de-alstomun-en-buyuk-hidroelektrik-tesisi-acildi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/10\/cin-de-alstomun-en-buyuk-hidroelektrik-tesisi-acildi.jpg 321w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><br \/>\nToprak kaynakl\u0131 \u0131s\u0131 pompalar\u0131, \u00e7ift yal\u0131t\u0131m, \u0131s\u0131 geri kazan\u0131m sistemleri, ya\u011fmur suyu geri d\u00f6n\u00fc\u015f\u00fcm\u00fc, fabrikan\u0131n tamam\u0131na \u0131s\u0131tma, so\u011futma, ayd\u0131nlatma ve havaland\u0131rma ama\u00e7l\u0131 elektrik enerjisi sa\u011flayan do\u011fal \u0131\u015f\u0131k panelleri ve solar fotovoltaik paneller gibi mimari yenilikler sayesinde bu yeni at\u00f6lye; y\u0131lda 10 bin tonun \u00fczerinde CO2 emisyon azalt\u0131m\u0131 sa\u011flayabilecek.<\/p>\n<p>Alstom Ba\u015fkan ve CEO\u2019su Patrick Kron &#8220;Alstom, \u00c7in\u2019deki bir\u00e7ok \u00f6nemli enerji projesi i\u00e7in geli\u015fmi\u015f ve g\u00fcvenilir teknolojideki uzmanl\u0131\u011f\u0131n\u0131 kulland\u0131. Tianjin tesisinin a\u00e7\u0131l\u0131\u015f\u0131, Alstom\u2019un \u00c7in\u2019deki geli\u015fimine y\u00f6nelik \u00f6nemli bir kilometre ta\u015f\u0131n\u0131 temsil ediyor. D\u00fcnya klasman\u0131ndaki bu fabrika, \u00c7in\u2019in s\u00fcrd\u00fcr\u00fclebilir kalk\u0131nma h\u0131z\u0131na katk\u0131 sa\u011flamam\u0131za olanak sa\u011flayacakt\u0131r&#8221; dedi.<\/p>\n<p><strong>\u00c7\u0130N 40 GWH`L\u0130K HES KURACAK<\/strong><br \/>\nD\u00fcnyan\u0131n en b\u00fcy\u00fck hidroelektrik \u00fcreticisi olan \u00c7in, 12. Be\u015f Y\u0131ll\u0131k Enerji Geli\u015ftirme Program\u0131na g\u00f6re, hidroelektri\u011fi daha fazla te\u015fvik edecek. 2015 y\u0131l\u0131na kadar \u00fclkedeki konvansiyonel hidroelektrik ve pompajl\u0131 hidrolik santralin toplam kapasitesi s\u0131ras\u0131yla 260GW ve 30GW\u2019ye ula\u015facak. \u00c7in, 2015 y\u0131l\u0131na kadar 30GW konvansiyonel ve 10GW pompajl\u0131 hidrolik santral kurmay\u0131 planl\u0131yor. 18 y\u0131ld\u0131r \u00c7in\u2019de hidrolik faaliyetlerde bulunan Alstom, b\u00fcy\u00fck hidroelektrik ekipmanlar\u0131nda, \u00fclkedeki toplam kurulu g\u00fcc\u00fcn %20\u2019lik k\u0131sm\u0131n\u0131 alm\u0131\u015f durumda oldu\u011funu duyurdu.<\/p>\n<p><strong>ASYA GENEL\u0130NDE B\u00dcY\u00dcME POTANS\u0130YEL\u0130<\/strong><br \/>\nGeli\u015fen \u00c7in piyasas\u0131na ek olarak, Asya genelinde b\u00fcy\u00fck bir potansiyel de s\u00f6z konusudur. Asya, toplam hidroelektri\u011fin %26\u2019s\u0131ndan fazlas\u0131n\u0131 \u00fcreterek, 2009 y\u0131l\u0131nda d\u00fcnyan\u0131n en b\u00fcy\u00fck hidroelektrik kayna\u011f\u0131 olmu\u015ftur. 2035 y\u0131l\u0131na kadar, bu \u00fclkelerin ek k\u00fcresel kapasitenin %85\u2019ine tekab\u00fcl etmesi bekleniyor. \u00d6rne\u011fin, Laos\u2019ta 10 GW ve Myanmar\u2019da 30 GW\u2019nin \u00fczerinde potansiyel hidroelektrik projesi mevcut.<\/p>\n<p><strong>ALSTOM`U G\u00dcNEYDO\u011eU ASYA`DA DA B\u00dcY\u00dcTECEK<\/strong><br \/>\nAlstom\u2019un Yenilenebilir Enerji Sekt\u00f6r\u00fc Ba\u015fkan\u0131 J\u00e9r\u00f4me P\u00e9cresse, \u00c7in`de kurulan yeni tesisin Alstom\u2019un teknolojisini ve inovasyonlar\u0131n\u0131 yerel m\u00fc\u015fterilerinin aya\u011f\u0131na g\u00f6t\u00fcrme konusundaki taahh\u00fcd\u00fcn\u00fc g\u00f6sterdi\u011fini belirtti. J\u00e9r\u00f4me P\u00e9cresse &#8220;Tianjin tesisi, \u015fu anda eksiksiz bir dizi faaliyeti ile tam bir hidroelektrik katmade\u011fer zinciri sunuyor. Bu tesis, Alstom\u2019un \u00c7in ve G\u00fcneydo\u011fu Asya pazar\u0131nda b\u00fcy\u00fcmesinde \u00e7ok \u00f6nemli bir rol oynayacakt\u0131r&#8221; diye konu\u015ftu.<\/p>\n<p><strong>D\u00dcNYA GENEL\u0130NDE Y\u00dcZDE 25 PAY<\/strong><br \/>\nD\u00fcnyan\u0131n \u00f6nde gelen hidroelektrik ekipman tedarik\u00e7isi ve hizmet sa\u011flay\u0131c\u0131lar\u0131ndan biri konumundaki Alstom, hidroelektrik t\u00fcrbin ve jenerat\u00f6rleri alan\u0131nda d\u00fcnya genelindeki toplam hidroelektrik kapasitesinin y\u00fczde 25\u2019inden fazlas\u0131n\u0131 temsil ediyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/cinde-alstomun-en-buyuk-hidroelektrik-tesisi-acild_5188.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.D\u00fcnyan\u0131n \u00f6nde gelen hidroelektrik ekipman tedarik\u00e7isi ve hizmet sa\u011flay\u0131c\u0131s\u0131 konumundaki Alstom, en b\u00fcy\u00fck hidroelektrik sanayi tesisini \u00c7in`de a\u00e7t\u0131. Alstom`dan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, \u00c7in\u2019in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":16393,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[9503,886,9509,9054,63,67,1009,165,35370,70,9502,9505,1090,9507,9506,9510,9504,9508,105],"views":2042,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16392"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=16392"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16392\/revisions"}],"predecessor-version":[{"id":16396,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16392\/revisions\/16396"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/16393"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=16392"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=16392"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=16392"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}