{"id":163519,"date":"2022-11-19T19:33:08","date_gmt":"2022-11-19T16:33:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=163519"},"modified":"2022-11-19T19:40:09","modified_gmt":"2022-11-19T16:40:09","slug":"akkuyu-ngs-insaat-sahasinda-gecici-tuzdan-arindirma-tesisi-faaliyete-gecti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-insaat-sahasinda-gecici-tuzdan-arindirma-tesisi-faaliyete-gecti\/","title":{"rendered":"(Turkish) Akkuyu NGS&#8217;nin \u0130n\u015faat Sahas\u0131nda Ge\u00e7ici Tuzdan Ar\u0131nd\u0131rma Tesisi Faaliyette"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/163519\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) in\u015faat sahas\u0131nda ge\u00e7ici bir tuzdan ar\u0131nd\u0131rma tesisi faaliyete ge\u00e7ti. \u0130n\u015faat ve montaj \u00e7al\u0131\u015fmalar\u0131 i\u00e7in tatl\u0131 su sa\u011flayacak olan tesisin pompa istasyonunda, g\u00fcnde 1.080 metrek\u00fcp tatl\u0131 su \u00fcretilebilecek.<\/h2>\n<p>Tesiste <strong>deniz suyu<\/strong> \u00f6nce<strong> b\u00fcy\u00fck par\u00e7ac\u0131klar\u0131n elenmesi<\/strong> i\u00e7in bir s\u00fczge\u00e7 sisteminden ge\u00e7irilecek. Ard\u0131ndan kolloidlerin ve di\u011fer maddelerin etkili bir \u015fekilde giderildi\u011fi bir <strong>ultrafiltrasyon \u00fcnitesine<\/strong> girecek.<\/p>\n<p><strong>Ana tuzdan ar\u0131nd\u0131rma i\u015flemi<\/strong> ise sudaki \u00e7\u00f6z\u00fcnm\u00fc\u015f iyonik maddelerin ayr\u0131ld\u0131\u011f\u0131 <strong>\u00f6zel bir filtrasyon<\/strong> t\u00fcr\u00fc <img loading=\"lazy\" class=\"alignright wp-image-163522\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/akkuyu-ngs-insaat-sahasinda-gecici-tuzdan-arindirma-tesisi-faaliyete-gecti-1.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/akkuyu-ngs-insaat-sahasinda-gecici-tuzdan-arindirma-tesisi-faaliyete-gecti-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/akkuyu-ngs-insaat-sahasinda-gecici-tuzdan-arindirma-tesisi-faaliyete-gecti-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/akkuyu-ngs-insaat-sahasinda-gecici-tuzdan-arindirma-tesisi-faaliyete-gecti-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/akkuyu-ngs-insaat-sahasinda-gecici-tuzdan-arindirma-tesisi-faaliyete-gecti-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/akkuyu-ngs-insaat-sahasinda-gecici-tuzdan-arindirma-tesisi-faaliyete-gecti-1-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>olan <strong>ters osmoz \u00fcnitesinde<\/strong> ger\u00e7ekle\u015fecek. Bu mineraller daha sonra dolomit filtreler kullan\u0131larak suya geri d\u00f6nd\u00fcr\u00fclecek. Bu i\u015flemler sonras\u0131 <strong>klorlanan su<\/strong>, bir <strong>pompa istasyonundan ge\u00e7irilerek<\/strong> halihaz\u0131rda kurulmu\u015f ve i\u015fletmeye al\u0131nm\u0131\u015f olan <strong>depolama tanklar\u0131na<\/strong> aktar\u0131lacak.<\/p>\n<p><strong>Akkuyu NGS sahas\u0131na<\/strong> kurulan bu tesisinin in\u015fas\u0131nda kullan\u0131lan <strong>boru hatlar\u0131, pompalar<\/strong> ve<strong> su ar\u0131tma sistemleri<\/strong> gibi bile\u015fenler, a\u011f\u0131rl\u0131kl\u0131 olarak T\u00fcrk yap\u0131m\u0131 bile\u015fenlerden olu\u015ftu. <strong>Tesisin in\u015faat\u0131<\/strong> ise yakla\u015f\u0131k <strong>5 ay <\/strong>s\u00fcrd\u00fc.<\/p>\n<p>NGS Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc <strong>Sergey Butckikh<\/strong> konuyla ilgili yapt\u0131\u011f\u0131 a\u00e7\u0131klamada \u015fu ifadeleri kulland\u0131: <em>&#8220;<strong>Tuzdan ar\u0131nd\u0131rma tesisinin<\/strong> i\u015fletmeye al\u0131nmas\u0131 ve faaliyete ge\u00e7mesi, <strong>Akkuyu NGS<\/strong> \u015fantiyesine in\u015faat ve montaj i\u015fleri, evsel ihtiya\u00e7lar ve g\u00fc\u00e7 \u00fcnitelerinin yap\u0131m a\u015famas\u0131nda <strong>yang\u0131n g\u00fcvenli\u011fi ihtiya\u00e7lar\u0131<\/strong> i\u00e7in <strong>kullan\u0131m suyu sa\u011flanmas\u0131<\/strong> a\u00e7\u0131s\u0131ndan \u00f6nemli bir ad\u0131m. <strong>Tuzdan ar\u0131nd\u0131r\u0131lm\u0131\u015f su<\/strong>, \u00f6zel bir tesiste kimyasal olarak tuzdan ar\u0131nd\u0131r\u0131lm\u0131\u015f su haz\u0131rlamak i\u00e7in de kullan\u0131lacak ve bu arada <strong>a\u00e7\u0131k reakt\u00f6r\u00fc temizlemek i\u00e7in de<\/strong> kullan\u0131lacak.&#8221;<\/em><\/p>\n<p><strong>Akkuyu NGS sahas\u0131<\/strong>ndaki<strong> in\u015faat<\/strong> ve <strong>montaj \u00e7al\u0131\u015fmalar\u0131<\/strong>, <strong>4 g\u00fc\u00e7<\/strong> \u00fcnitesi, <em>k\u0131y\u0131 hidrolik m\u00fchendislik yap\u0131lar\u0131, bir g\u00fc\u00e7 da\u011f\u0131t\u0131m sistemi, idari binalar, bir e\u011fitim merkezi<\/em> ve gelecekteki <em>NGS&#8217;nin fiziksel koruma tesisleri<\/em> olmak \u00fczere <strong>ana<\/strong> ve<strong> yard\u0131mc\u0131 tesislerin<\/strong> t\u00fcm\u00fcnde devam ediyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) in\u015faat sahas\u0131nda ge\u00e7ici bir tuzdan ar\u0131nd\u0131rma tesisi faaliyete ge\u00e7ti. \u0130n\u015faat ve montaj \u00e7al\u0131\u015fmalar\u0131 i\u00e7in tatl\u0131 su sa\u011flayacak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":163521,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[42302,54486,48024,106293],"views":40,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/163519"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=163519"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/163519\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/163521"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=163519"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=163519"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=163519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}