{"id":163375,"date":"2022-11-17T12:29:19","date_gmt":"2022-11-17T09:29:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=163375"},"modified":"2022-11-17T12:35:42","modified_gmt":"2022-11-17T09:35:42","slug":"turkiye-nin-en-buyuk-cati-ustu-membran-gesi-torenle-acildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-nin-en-buyuk-cati-ustu-membran-gesi-torenle-acildi\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin En B\u00fcy\u00fck \u00c7at\u0131 \u00dcst\u00fc Membran GES\u2019i T\u00f6renle A\u00e7\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/163375\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>T\u00fcrkiye\u2019nin ilk uluslararas\u0131 ta\u015f\u0131mac\u0131l\u0131k \u00fcss\u00fc olan \u201cAnkara Lojistik \u00dcss\u00fc&#8217;nde; T\u00fcrkiye\u2019nin en b\u00fcy\u00fck membran \u00e7at\u0131s\u0131 olan yakla\u015f\u0131k 6MWp g\u00fcc\u00fcndeki \u00e7at\u0131 \u00fczeri GES projesinin ge\u00e7ici kabul\u00fc tamamland\u0131.<\/strong><\/h2>\n<p>Kurulumu<strong> 120 g\u00fcn<\/strong> gibi k\u0131sa bir s\u00fcrede tamamlanan<strong> projenin a\u00e7\u0131l\u0131\u015f\u0131 t\u00f6reniyle<\/strong> yap\u0131ld\u0131. T\u00f6rene <strong>Kahramankazan Kaymakam\u0131 Abdullah Selim Parlar, Ticaret Bakanl\u0131\u011f\u0131 ve <img loading=\"lazy\" class=\"alignright wp-image-163378\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/turkiye-nin-en-buyuk-cati-ustu-membran-gesi-torenle-acildi-2.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/turkiye-nin-en-buyuk-cati-ustu-membran-gesi-torenle-acildi-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/turkiye-nin-en-buyuk-cati-ustu-membran-gesi-torenle-acildi-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/turkiye-nin-en-buyuk-cati-ustu-membran-gesi-torenle-acildi-2-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/turkiye-nin-en-buyuk-cati-ustu-membran-gesi-torenle-acildi-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/11\/turkiye-nin-en-buyuk-cati-ustu-membran-gesi-torenle-acildi-2-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Kahramankazan il\u00e7e b\u00fcrokratlar\u0131, Ankara Lojistik \u00dcss\u00fc Yat\u0131r\u0131mlar\u0131 Akaryak\u0131t A.\u015e.\u00a0 Y\u00f6netim Kurulu ve <\/strong>ortaklar\u0131 ile birlikte <strong>ASUNIM ekibi de<\/strong> kat\u0131ld\u0131.<\/p>\n<p><strong>ASUN\u0130M Y\u00f6netim Kurulu Ba\u015fkan\u0131 Umut G\u00fcrb\u00fcz<\/strong> yapt\u0131\u011f\u0131 a\u00e7\u0131klamada,<em>&#8220;Ankara Lojistik \u00dcss\u00fc projesinin, T\u00fcrkiye\u2019nin en b\u00fcy\u00fck<strong> membran \u00e7at\u0131 GES<\/strong>&#8216;i ve <strong>lojistik sekt\u00f6r\u00fc<\/strong>n\u00fcn de bug\u00fcne kadar yap\u0131lm\u0131\u015f en b\u00fcy\u00fck \u00e7at\u0131 GESi oldu\u011funun alt\u0131n\u0131 \u00e7izen G\u00fcrb\u00fcz,\u201d projede <strong>10bin 926 adet Sirius marka g\u00fcne\u015f paneli<\/strong> kullan\u0131ld\u0131. Tasar\u0131m milimetrik olarak ilmek ilmek i\u015flendi. Projede g\u00fcne\u015fliklerden ka\u00e7\u0131ld\u0131, projeye uygun <strong>g\u00f6lge hesaplamalar\u0131<\/strong> Asunim\u2019e <strong>\u00f6zel yaz\u0131l\u0131mlar<\/strong> kullan\u0131larak yap\u0131ld\u0131. M\u00fchendislik \u00e7al\u0131\u015fmalar\u0131m\u0131z Avrupa\u2019daki ve T\u00fcrkiye\u2019deki m\u00fchendislik ekibimizin ortak \u00e7al\u0131\u015fmalar\u0131 sonucunda yap\u0131ld\u0131. Yine g\u00fcne\u015f panellerindeki elektri\u011fi \u015febeke elektri\u011fine \u00e7eviren<strong> 42<\/strong> adet <strong>110<\/strong>\u2019luk <strong>SMA marka inverter<\/strong> kullan\u0131ld\u0131. \u0130nverterlerin hepsi farkl\u0131 binalarda bulunan \u00e7at\u0131lar\u0131n alt\u0131na kuruldu ve <strong>inverterlerden ba\u011flant\u0131 noktalar\u0131na<\/strong> kaz\u0131larla gidildi. Bu ba\u011flant\u0131y\u0131 sa\u011flamak i\u00e7in <strong>260 bin metre Studer<\/strong> marka<strong> Beta Flam teknolojili DC kablo<\/strong> kullan\u0131ld\u0131. 2000 evin elektri\u011fini temiz enerjiden sa\u011flamak i\u00e7in bizimle beraber <strong>200 ki\u015finin<\/strong> \u00fczerinde olan<strong> montaj<\/strong> ve<strong> elektrik<\/strong> ekibi \u00e7al\u0131\u015ft\u0131 ve bu projeyi de ba\u015far\u0131yla teslim ettik\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<p><strong>4 milyon 250 bin dolar<\/strong> tutar\u0131ndaki yat\u0131r\u0131mla devreye al\u0131nan <strong>GES<\/strong> ile y\u0131lda<strong> 2000 ton<\/strong> civar\u0131nda karbon sal\u0131m\u0131n\u0131 engellenerek <strong>90bin<\/strong> \u00fczerinde a\u011fa\u00e7ta korunmu\u015f olunacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin ilk uluslararas\u0131 ta\u015f\u0131mac\u0131l\u0131k \u00fcss\u00fc olan \u201cAnkara Lojistik \u00dcss\u00fc&#8217;nde; T\u00fcrkiye\u2019nin en b\u00fcy\u00fck membran \u00e7at\u0131s\u0131 olan yakla\u015f\u0131k 6MWp g\u00fcc\u00fcndeki \u00e7at\u0131 \u00fczeri GES projesinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":163379,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[103929,24219,7440,2206,106248,106247],"views":68,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/163375"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=163375"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/163375\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/163379"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=163375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=163375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=163375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}