{"id":16309,"date":"2013-10-09T09:08:50","date_gmt":"2013-10-09T06:08:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=16309"},"modified":"2013-10-09T09:08:50","modified_gmt":"2013-10-09T06:08:50","slug":"turkiyenin-ilk-nukleer-santrali-bir-yil-gecikebilir","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-ilk-nukleer-santrali-bir-yil-gecikebilir\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin \u0130lk N\u00fckleer Santrali Bir Y\u0131l Gecikebilir!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/16309\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin Mersin\u2019e yap\u0131lacak ilk n\u00fckleer santrali a\u00e7\u0131l\u0131\u015f\u0131n\u0131n 1 y\u0131l gecikebilece\u011fi belirtiliyor.<\/strong><\/p>\n<p>Rusya\u2019n\u0131n Mersin Akkuyu\u2019ya yapaca\u011f\u0131 T\u00fcrkiye\u2019nin ilk n\u00fckleer santralinde elektrik \u00fcretimine ge\u00e7ilmesinin \u00c7ED raporunun al\u0131nmas\u0131 ve n\u00fckleer santral dok\u00fcmanlar\u0131n\u0131 denetleyecek ba\u011f\u0131ms\u0131z bir dan\u0131\u015fman\u0131n se\u00e7ilmesi s\u00fcrecinin uzamas\u0131 nedeniyle bir y\u0131la kadar gecikebilece\u011fi belirtiliyor. Bu durumda, santralin ilk \u00fcnitesinin 2019 yerine 2020\u2032de devreye al\u0131nmas\u0131n\u0131n m\u00fcmk\u00fcn oldu\u011fu kaydediliyor.<\/p>\n<p>T\u00fcrkiye ile Rusya aras\u0131nda sa\u011flanan mutabakat kapsam\u0131nda Rusya, d\u00f6rt \u00fcniteden olu\u015facak toplam 4,800 MW kurulu g\u00fcce sahip Akkuyu N\u00fckleer Santralini 20 milyar dolarl\u0131k yat\u0131r\u0131mla yapacak. \u00c7ED raporu ikinci kez \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na verilen projede ilk \u00fcnitede elektrik \u00fcretiminin 2019 y\u0131l\u0131nda ba\u015flamas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyordu. Yerli ve yenilenebilir enerji kaynaklar\u0131n\u0131 devreye alarak enerjide d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131 azaltmaya \u00e7al\u0131\u015fan T\u00fcrkiye, 2023 y\u0131l\u0131nda toplam enerjisinin y\u00fczde 10\u2032unu n\u00fckleer santralden \u00fcretmeyi ama\u00e7l\u0131yor.<\/p>\n<h2>\u20192019\u2032a yeti\u015fmesi m\u00fcmk\u00fcn g\u00f6z\u00fckm\u00fcyor\u2019<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/nukleer-santral-icin-geldi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-10463\" title=\"nukleer-santral\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/nukleer-santral-icin-geldi-300x202.jpg\" alt=\"\" width=\"300\" height=\"202\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/nukleer-santral-icin-geldi-300x202.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/nukleer-santral-icin-geldi-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/nukleer-santral-icin-geldi.jpg 430w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/h2>\n<p>Konuya yak\u0131n kaynaklar, daha \u00f6nce planland\u0131\u011f\u0131 gibi n\u00fckleer santralde ilk \u00fcniteden elektrik \u00fcretiminin 2019 y\u0131l\u0131nda olmas\u0131n\u0131n m\u00fcmk\u00fcn olamayaca\u011f\u0131n\u0131 belirterek, \u201c\u0130lk \u00fcretim daha \u00e7ok 2020\u2032de olacak gibi g\u00f6z\u00fck\u00fcyor. N\u00fckleer santrallerin baz\u0131 \u00f6zellikleri var. Ba\u015fka herhangi bir santralde test d\u00f6nemi birka\u00e7 ay s\u00fcrerken bu s\u00fcre n\u00fckleer santralde 6 ila 12 ay aras\u0131nda olabiliyor\u201d dedi. Ayn\u0131 kaynak, n\u00fckleer santrali yapacak olan Akkuyu NGS\u2019nin EPDK\u2019dan in\u015faat ve elektrik \u00fcretim lisanslar\u0131n\u0131 hen\u00fcz almad\u0131\u011f\u0131n\u0131 da bildirdi. Yetkililer, bu lisanslar\u0131n al\u0131nmas\u0131nda herhangi bir sorun ya\u015fanmas\u0131n\u0131 beklemiyorlar.<\/p>\n<p>Akkuyu N\u00fckleer Santrali i\u00e7in projenin ana m\u00fcteahhidi Rus Atomstroyexport \u015firketi n\u00fckleer santralin d\u00f6rt \u00fcnitesinin de 2023 y\u0131l\u0131nda devreye girmesini \u00f6ng\u00f6r\u00fcyor. \u00c7ED raporunun Kas\u0131m ay\u0131 sonunda verilmesi ve ard\u0131ndan yakla\u015f\u0131k de\u011feri 8 milyar dolar\u0131 bulabilecek olan baz\u0131 yap\u0131m i\u015fleri i\u00e7in ihaleye \u00e7\u0131k\u0131lmas\u0131 bekleniyor. Yetkililer, ihalenin gecikmesindeki bir di\u011fer gerek\u00e7enin de n\u00fckleer santrale dair dok\u00fcmanlar\u0131 inceleyecek olan ba\u011f\u0131ms\u0131z bir dan\u0131\u015fman se\u00e7iminin hen\u00fcz yap\u0131lamamas\u0131n\u0131 g\u00f6steriyor. T\u00fcrkiye Atom Enerjisi Kurumu taraf\u0131ndan bu konuda a\u00e7\u0131lan d\u00f6rd\u00fcnc\u00fc ihale de tamamlamam\u0131\u015f ve son ihale ge\u00e7ti\u011fimiz g\u00fcnlerde iptal edilmi\u015fti.<\/p>\n<p>\u0130ngiliz savunma ve g\u00fcvenlik d\u00fc\u015f\u00fcnce kurulu\u015fu Royal United Services Institute\u2019ten Aeron Stein, ba\u011f\u0131ms\u0131z denetim i\u00e7in dan\u0131\u015fman\u0131n se\u00e7ilememesinin gecikmedeki en \u00f6nemli unsurlardan biri oldu\u011funu s\u00f6yledi. Stein, \u201cBu s\u00fcre\u00e7 tamamen TAEK\u2019in (Rus reakt\u00f6r dok\u00fcmanlar\u0131n\u0131 denetlemek i\u00e7in) bir dan\u0131\u015fman firma bulma ihalesini yapmas\u0131na ba\u011fl\u0131 ve \u015fu andaki t\u00fcm i\u015faretler bu s\u00fcre\u00e7le ilgili olduk\u00e7a zorland\u0131klar\u0131 y\u00f6n\u00fcnde\u201d dedi.<\/p>\n<p>Stein, n\u00fckleer santralin in\u015faat\u0131n\u0131n 2016\u2032da ba\u015flasa bir ilk reakt\u00f6r\u00fcn yap\u0131m\u0131n\u0131n \u00fc\u00e7 y\u0131lda, tamam\u0131n\u0131n ise yedi y\u0131l tamamlanmas\u0131n\u0131n takvim a\u00e7\u0131s\u0131ndan \u00e7ok s\u0131k\u0131\u015f\u0131k olaca\u011f\u0131n\u0131 belirtti. Enerji talebinde \u00e7ok h\u0131zl\u0131 b\u00fcy\u00fcyen T\u00fcrkiye, ihtiya\u00e7lar\u0131n kar\u015f\u0131lanmas\u0131 i\u00e7in y\u0131lda 3,500 MW\u2019l\u0131k kurulu g\u00fcc\u00fc devreye almas\u0131 gerekiyor. T\u00fcrkiye\u2019nin ikinci n\u00fckleer santralini ise Japon-Frans\u0131z konsorsiyumu Sinop\u2019a yap\u0131lacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/10\/09\/turkiyenin-ilk-nukleer-santrali-bir-yil-gecikebilir\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin Mersin\u2019e yap\u0131lacak ilk n\u00fckleer santrali a\u00e7\u0131l\u0131\u015f\u0131n\u0131n 1 y\u0131l gecikebilece\u011fi belirtiliyor. Rusya\u2019n\u0131n Mersin Akkuyu\u2019ya yapaca\u011f\u0131 T\u00fcrkiye\u2019nin ilk n\u00fckleer santralinde elektrik \u00fcretimine ge\u00e7ilmesinin \u00c7ED [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10463,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[1905,9409,9410,19,63,67,1009,165,9408,1301,88,5745,846],"views":717,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16309"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=16309"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16309\/revisions"}],"predecessor-version":[{"id":16310,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16309\/revisions\/16310"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10463"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=16309"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=16309"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=16309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}