{"id":161999,"date":"2022-10-30T18:04:59","date_gmt":"2022-10-30T15:04:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=161999"},"modified":"2022-10-30T18:04:59","modified_gmt":"2022-10-30T15:04:59","slug":"bitlis-ve-siirte-baykan-i-ve-baykan-ii-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bitlis-ve-siirte-baykan-i-ve-baykan-ii-hes-kurulacak\/","title":{"rendered":"(Turkish) Bitlis ve Siirt\u2019e Baykan-I ve Baykan-II HES Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/161999\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Siirt ve Bitlis il s\u0131n\u0131rlar\u0131nda toplam da 111,18 MW kurulu <img loading=\"lazy\" class=\"alignright wp-image-162002\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/hidroelektrik-santrali.jpg\" alt=\"\" width=\"300\" height=\"220\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/hidroelektrik-santrali.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/hidroelektrik-santrali-300x220.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/hidroelektrik-santrali-500x366.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/hidroelektrik-santrali-68x50.jpg 68w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>g\u00fcce sahip Baykan-I ve Baykan-II hidroelektrik santralleri kurulumu yap\u0131lacak.<\/h2>\n<p>Siirt \u0130li, <strong>Baykan ve Kurtalan \u0130l\u00e7esiyle<\/strong> birlikte Bitlis \u0130li <strong>Merkez \u0130l\u00e7e<\/strong> s\u0131n\u0131rlar\u0131 i\u00e7erisinde <strong>Bitlis \u00c7ay\u0131<\/strong> \u00fczerinde <strong>68 MW<\/strong> kapasiteli Baykan-I Baraj\u0131 ve HES ile<strong> 34 MW<\/strong> kapasiteli <strong>Baykan-II Baraj\u0131<\/strong> ve <strong>Hidroelektrik Santrali (HES)<\/strong> kurulmas\u0131 planlan\u0131rken <strong>Ato Nakliye Madencilik Enerji<\/strong> \u015firketi taraf\u0131ndan yakla\u015f\u0131k <strong>2 milyar TL<\/strong> yat\u0131r\u0131m bedeliyle santraller devreye al\u0131nacak.<\/p>\n<p><strong>Baykan Enerji Grubu Projesi<\/strong> kapsam\u0131nda<em> Baykan-I Baraj\u0131<\/em> ve <em>Baykan-II Baraj\u0131<\/em> adl\u0131 depolamal\u0131 tesisler kurulacak<strong>. 2 kademeli proje<\/strong> ile toplam da<strong> 111,18 MW<\/strong> kurulu g\u00fcce sahip olunurken ortalama toplam da <strong>323,35 GWh\/y\u0131l<\/strong> enerji \u00fcretilecek ve santralin \u00f6mr\u00fcn\u00fcn ise<strong>\u00a050 y\u0131l<\/strong> olaca\u011f\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Siirt ve Bitlis il s\u0131n\u0131rlar\u0131nda toplam da 111,18 MW kurulu g\u00fcce sahip Baykan-I ve Baykan-II hidroelektrik santralleri kurulumu yap\u0131lacak. Siirt \u0130li, Baykan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":162003,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[105821,105826,105825,105820,105823,105824,6029,34926,70,1090,5196,105822],"views":427,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161999"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=161999"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161999\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/162003"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=161999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=161999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=161999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}