{"id":161964,"date":"2022-10-29T20:18:29","date_gmt":"2022-10-29T17:18:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=161964"},"modified":"2022-10-29T20:18:29","modified_gmt":"2022-10-29T17:18:29","slug":"akkuyu-ngsnin-1inci-unitesinin-nukleer-yakit-simulatorleri-turkiyede","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-1inci-unitesinin-nukleer-yakit-simulatorleri-turkiyede\/","title":{"rendered":"(Turkish) Akkuyu NGS\u2019nin 1\u2019inci \u00dcnitesinin N\u00fckleer Yak\u0131t Sim\u00fclat\u00f6rleri T\u00fcrkiye\u2019de&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/161964\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Rosatom\u2019un yak\u0131t \u015firketi TVEL, in\u015fas\u0131 s\u00fcren Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) ilk \u00fcnitesi i\u00e7in \u00fcretti\u011fi n\u00fckleer yak\u0131t sim\u00fclat\u00f6rlerini T\u00fcrkiye\u2019ye g\u00f6nderdi.<\/h2>\n<p><strong>TVEL Yak\u0131t \u015eirketi<\/strong>\u2019nin <strong>Bat\u0131 Sibirya<\/strong>\u2019da bulunan \u00fcretim tesisi <strong>Novosibirsk Kimyasal Konsantre Tesisi<\/strong>\u2019nde \u00fcretilen<strong> yak\u0131t sim\u00fclat\u00f6rlerinin<\/strong> yan\u0131 s\u0131ra<strong> reakt\u00f6r kontrol\u00fc<\/strong> ve <strong>korumas\u0131<\/strong> i\u00e7in <strong>kontrol \u00e7ubuk modelleri<\/strong> ile <strong>n\u00fckleer yak\u0131t\u0131n kontrol\u00fc<\/strong> i\u00e7in gerekli ara\u00e7lar da <strong>T\u00fcrkiye\u2019ye sevk edildi.\u00a0<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-161966\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/akkuyu-ngsnin-1inci-unitesinin-nukleer-yakit-simulatorleri-turkiyede.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/akkuyu-ngsnin-1inci-unitesinin-nukleer-yakit-simulatorleri-turkiyede.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/akkuyu-ngsnin-1inci-unitesinin-nukleer-yakit-simulatorleri-turkiyede-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/akkuyu-ngsnin-1inci-unitesinin-nukleer-yakit-simulatorleri-turkiyede-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/akkuyu-ngsnin-1inci-unitesinin-nukleer-yakit-simulatorleri-turkiyede-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/akkuyu-ngsnin-1inci-unitesinin-nukleer-yakit-simulatorleri-turkiyede-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Yak\u0131t demeti sim\u00fclat\u00f6rleri ve <strong>kontrol \u00e7ubuk modelleri<\/strong>, yeni<strong> bir g\u00fc\u00e7 \u00fcnitesinin devreye al\u0131nmas\u0131<\/strong>ndan \u00f6nce tesisin kilit sistemlerini test etmek i\u00e7in reakt\u00f6r<strong> \u00e7ekirde\u011fine y\u00fckleniyor<\/strong> ve daha sonra bo\u015falt\u0131l\u0131yor. <strong>3+ nesil<\/strong> g\u00fc\u00e7 \u00fcnitelerinin <strong>reakt\u00f6r \u00e7ekirde\u011fi<\/strong>,<strong> uranyum<\/strong> yak\u0131tl\u0131 <strong>163 yak\u0131t<\/strong> demetinden olu\u015fuyor.<\/p>\n<p>Akkuyu NGS&#8217;nin 1&#8217;inci g\u00fc\u00e7 \u00fcnitesi i\u00e7in gerekli olan <strong>ilk n\u00fckleer yak\u0131t\u0131n<\/strong> ise <strong>2023 y\u0131l\u0131nda<\/strong> g\u00f6nderilmesi planlan\u0131yor. <strong>Akkuyu NGS<\/strong>&#8216;nin t\u00fcm g\u00fc\u00e7 \u00fcniteleri i\u00e7in n\u00fckleer yak\u0131t tedarikine y\u00f6nelik uzun vadeli s\u00f6zle\u015fme, <strong>TVEL<\/strong> ve <strong>AKKUYU N\u00dcKLEER A.\u015e.<\/strong> aras\u0131nda<strong> 2017 y\u0131l\u0131n\u0131n sonlar\u0131nda<\/strong> imzalam\u0131\u015ft\u0131.<\/p>\n<p>Bununla birlikte, <strong>Rosatom\u2019<\/strong>un yan kurulu\u015fu<strong> TVEL A.\u015e.<\/strong>\u2019in<strong> Merkezi Tasar\u0131m ve Teknoloji Enstit\u00fcs\u00fc<\/strong> (MTTE A.\u015e.) n\u00fckleer santralin her bir \u00fcnitesine <strong>n\u00fckleer yak\u0131t y\u00fckleme<\/strong> ve <strong>kullan\u0131lm\u0131\u015f yak\u0131t\u0131n de\u011fi\u015ftirilmesi<\/strong> i\u00e7in kullan\u0131lan Rus yap\u0131m\u0131 yak\u0131t <strong>ikmal makineleri de<\/strong> tedarik edecek. Yak\u0131t y\u00fckleme makinesinin <strong>Akkuyu NGS<\/strong>&#8216;nin ilk g\u00fc\u00e7 \u00fcnitesine sevkiyat\u0131n\u0131n <strong>2023 y\u0131l\u0131nda yap\u0131lmas\u0131<\/strong> planlan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rosatom\u2019un yak\u0131t \u015firketi TVEL, in\u015fas\u0131 s\u00fcren Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) ilk \u00fcnitesi i\u00e7in \u00fcretti\u011fi n\u00fckleer yak\u0131t sim\u00fclat\u00f6rlerini T\u00fcrkiye\u2019ye g\u00f6nderdi. TVEL Yak\u0131t [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":161966,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[3019,19356,105805,2587,34607],"views":52,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161964"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=161964"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161964\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/161966"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=161964"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=161964"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=161964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}